414 WEST 34TH STREET · BIN 1012851
💬 Discuss this project
1900Year Built
1Stories
M1Building Class
C6-4Zoning
25,400 sfGross Floor Area
1Units
10 Open Violations 9 unresolved · 1 paperwork only ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: THE CHURCH OF ST. MICHAEL · 16,762 sf lot · 1.52 FAR built
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 2 filings · 20 docs
Floor 5Under Construction24p · 1 filing · 20 docs
Floor 4Under Construction23p · 1 filing · 20 docs
Floor 3Under Construction22p · 1 filing · 20 docs
Floor 2Under Construction36p · 1 filing · 20 docs
Floor 1Under Construction47p · 1 filing · 20 docs
CellarUnder Construction51p · 1 filing · 20 docs
Sub-CellarUnder Construction7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHURCH OF SAINT MICHAEL2207/08/2026
CHURCH OF ST MICHAEL2403/22/2026
RC CHURCH OF ST MICHAEL1103/22/2026
DEPT OF EDUCATION IS 260103/22/2026
DOE I.S. 260103/22/2026
DEPT OF EDUC. IS260 M933103/22/2026
CHURCH OF SAINT MICHALES103/22/2026
34TH STREET APT CORP103/22/2026
QWEST CONTRACTING103/22/2026
ST MICHAELS CHURCH803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AKF ENGINEERS, LLP610/03/2025
PBDW ARCHITECTS307/17/2025
SILMAN104/08/2024
RIMKUS NEW YORK PLLC211/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CORNERSTONE CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QWEST CONTRACTING CORPGeneral Contractor807/08/2026
ADVANCED PLUMBING MECHPlumbing207/08/2026
EXECUTIVE ELECTL SER INCElectrical103/22/2026
FERRITO, ROBERTElectrical103/21/2026
MICHAEL WEBERElectrical103/21/2026
SANKAR SHILElectrical103/21/2026
TOUGH STALLION LLCElectrical103/21/2026
CRO-INTERNATIONAL INCGeneral Contractor107/08/2026
ALEX CARRIONElectrical103/21/2026
FRANKIE PLBG & HTG L.L.CPlumbing107/08/2026
BIRNBAUM, ALANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DELTA TESTING LABS687304/08/2024
RIMKUS NEW YORK, PLLC8123211/21/2022
Building Lifecycle
All (114)Filed (12)Permit Issued (9)Signed Off (2)Violation (60)Inspection (8)Objection (8)Special Inspection (15)
07/20/2026
Signed off — Alteration
New sanitary service from the street main, new domestic water service from the street main, new electric hot water heater, new gas service from the street main, systems of piping.
M01001690-S2
03/31/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/05/2025
Permit issued — Plumbing
M01001690-S1-PL
10/16/2025
Permit issued — General Construction
M01001690-S3-GC
10/16/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/03/2025
Filed — Alteration
New sanitary service from the street main, new domestic water service from the street main, new electric hot water heater, new gas service from the street main, systems of piping.
M01001690-P6
09/26/2025
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
09/02/2025
Filed — Alteration
New sanitary service from the street main, new domestic water service from the street main, new electric hot water heater, new gas service from the street main, systems of piping.
M01001690-P5
08/21/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/14/2025
Permit issued — Structural
M01001690-S4-ST
08/11/2025
Permit issued — Mechanical Systems
M01001690-I1-MS
08/06/2025
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
07/24/2025
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
07/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
07/24/2025
Special inspection requirement — Sprayed fire-resistant materials
RICHARD GREENWALD
07/24/2025
Special inspection requirement — Masonry
RICHARD GREENWALD
07/24/2025
Special inspection requirement — Energy Code Compliance Inspections
RICHARD GREENWALD
07/24/2025
Special inspection requirement — Final
RICHARD GREENWALD
07/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
RICHARD GREENWALD
07/17/2025
Filed — Alteration
New sanitary service from the street main, new domestic water service from the street main, new electric hot water heater, new gas service from the street main, systems of piping.
M01001690-P4
05/27/2025
Filed — Alteration
New sanitary service from the street main, new domestic water service from the street main, new electric hot water heater, new gas service from the street main, systems of piping.
M01001690-P3
03/09/2025
Permit issued — Boiler Equipment
M01001690-S2-BE
12/10/2024
Filed — Alteration
New sanitary service from the street main, new domestic water service from the street main, new electric hot water heater, new gas service from the street main, systems of piping.
M01001690-P1
11/13/2024
Permit issued — Plumbing
M01001690-S1-PL
11/04/2024
Permit issued — Mechanical Systems
M01001690-I1-MS
11/04/2024
Permit issued — General Construction
M01001690-S3-GC
04/08/2024
Filed — Alteration
New sanitary service from the street main, new domestic water service from the street main, new electric hot water heater, new gas service from the street main, systems of piping.
M01001690-S4
04/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
04/03/2024
Special inspection requirement — Structural Steel - Details
RICHARD GREENWALD
04/03/2024
Special inspection requirement — Structural Cold-Formed Steel
RICHARD GREENWALD
03/13/2024
Objection resolved — Addressed
03/13/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/05/2024
Special inspection requirement — Final
RICHARD GREENWALD
02/22/2024
Objection raised — Other
02/21/2024
Filed — Alteration
New sanitary service from the street main, new domestic water service from the street main, new electric hot water heater, new gas service from the street main, systems of piping.
M01001690-S2
02/21/2024
Filed — Alteration
New sanitary service from the street main, new domestic water service from the street main, new electric hot water heater, new gas service from the street main, systems of piping.
M01001690-S1
02/21/2024
Objection raised — Other
02/21/2024
Objection raised — Other
02/21/2024
Objection raised — Other
02/20/2024
Filed — Alteration
New sanitary service from the street main, new domestic water service from the street main, new electric hot water heater, new gas service from the street main, systems of piping.
M01001690-S3
02/15/2024
Filed — Alteration
New sanitary service from the street main, new domestic water service from the street main, new electric hot water heater, new gas service from the street main, systems of piping.
M01001690-I1
08/29/2023
Signed off — Alteration
FACADE RESTORATION WORK AS PER PLANS
M00770548-I1
05/15/2023
Violation issued (ECB, closed)
Construction
11/28/2022
Permit issued — General Construction
M00770548-I1-GC
11/28/2022
Violation issued (ECB, closed)
Construction
11/22/2022
Special inspection requirement — Final
Brian Sullivan
11/22/2022
Special inspection requirement — Masonry
Brian Sullivan
11/21/2022
Filed — Alteration
FACADE RESTORATION WORK AS PER PLANS
M00770548-P1
11/21/2022
Special inspection requirement — Masonry
Brian Sullivan
11/21/2022
Special inspection requirement — Final
Brian Sullivan
09/07/2022
Violation issued (ECB, closed)
Construction
07/28/2022
Filed — Alteration
FACADE RESTORATION WORK AS PER PLANS
M00770548-I1
06/08/2022
Violation issued (FDNY_NOV, closed)
06/08/2022
Violation issued (FDNY_NOV, closed)
06/08/2022
Violation issued (FDNY_NOV, closed)
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH11/05/2025
DOB NOWGeneral ConstructionPermit IssuedQWEST CONTRACTING CORP10/16/2025
DOB NOWStructuralPermit IssuedQWEST CONTRACTING CORP08/14/2025
DOB NOWMechanical SystemsPermit IssuedQWEST CONTRACTING CORP08/11/2025
DOB NOWBoiler EquipmentSigned-offFRANKIE PLBG & HTG L.L.C03/09/2025
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH11/13/2024
DOB NOWMechanical SystemsPermit IssuedQWEST CONTRACTING CORP11/04/2024
DOB NOWGeneral ConstructionPermit IssuedQWEST CONTRACTING CORP11/04/2024
DOB NOWGeneral ConstructionSigned-offCRO-INTERNATIONAL INC11/28/2022
BISEQISSUEDPROFESSIONAL LINE CORP04/21/2022
BISOTISSUEDCRO-INTERNATIONAL INC03/17/2022
BISEQISSUEDPROFESSIONAL LINE CORP01/11/2022
BISEQISSUEDPROFESSIONAL LINE CORP04/08/2021
BISEQISSUEDEXPERT GROUPENTERPRISE IN11/25/2020
BISEQISSUEDEXPERT GROUPENTERPRISE IN11/23/2020
BISEQISSUEDEXPERT GROUPENTERPRISE IN10/15/2019
BISEQISSUEDEXPERT GROUPENTERPRISE IN10/10/2019
BISEQISSUEDEXPERT GROUPENTERPRISE IN07/25/2018
BISEQISSUEDEXPERT GROUPENTERPRISE IN07/19/2018
BISOTISSUEDA & S WATERPROOFING & RES06/27/2018
BISFSISSUEDS.J. FUEL CO., INC03/19/2018
BISEQISSUEDEXPERT GROUPENTERPRISE IN07/28/2017
BISEQISSUEDEXPERT GROUPENTERPRISE IN07/27/2017
BISOTISSUEDA & S WATERPROOFING & RES06/26/2017
BISOTISSUEDA & S WATERPROOFING & RES09/09/2016
BISEQISSUEDEXPERT GROUPENTERPRISE IN07/19/2016
BISEQISSUEDEXPERT GROUPENTERPRISE IN07/18/2016
BISEQISSUEDINTERSYSTEM S&S CORP01/19/2016
BISEQISSUEDINTERSYSTEM S&S CORP09/18/2015
BISEQISSUEDINTERSYSTEM S&S CORP09/09/2015
BISOTISSUEDKEY RESTORATION CORP05/28/2015
BISEQISSUEDINTERSYSTEM S&S CORP09/19/2014
BISEQISSUEDINTERSYSTEM S&S CORP09/10/2014
BISEQISSUEDINTERSYSTEMS CORPORATION02/10/2014
BISEQISSUEDINTERSYSTEMS CORPORATION01/30/2014
BISFSISSUEDS.J. FUEL CO., INC10/24/2013
BISEQISSUEDINTERSYSTEMS CORPORATION07/31/2013
BISEQISSUEDINTERSYSTEMS CORPORATION07/15/2013
BISEQISSUEDPHOENIX SUTTON STR INC11/15/2012
BISOTISSUEDLIGHTON INDUSTRIES INC08/26/2010
+ 3 more permits on file
1 project · most recent 10/03/2025
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/03/2025Permit IssuedQWEST CONTRACTING CORPHeating Systems
Heating
Aaon H3-BRB-9-0-0000-41F 1,700 CFM ×1
1 project · most recent 10/03/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/03/2025Permit IssuedADVANCED PLUMBING MECHGas, Water/Sanitary
9 projects · most recent 07/01/2026
General Wiring
FiledStatusContractorScope
07/01/2026Permit IssuedAXCEL ELECTRIC CO., INC.General Wiring
05/29/2026Permit IssuedAXCEL ELECTRIC CO., INC.—
06/25/2025CompleteEXECUTIVE ELECTL SER INCGeneral Wiring
05/09/2022Permit IssuedAXCEL ELECTRIC CO., INC.General Wiring
05/09/2022Permit IssuedAXCEL ELECTRIC CO., INC.2 meters, 1 new_meters
12/12/2021CompleteWILLDAN ELECTRICAL OF NY—
12/09/2021CompleteWILLDAN ELECTRICAL OF NY—
12/08/2021CompleteWILLDAN ELECTRICAL OF NY—
10/13/2021CompleteWILLDAN ELECTRICAL OF NY—
1 project · most recent 10/03/2025
Steel Concrete
FiledStatusContractorScope
10/03/2025Permit IssuedADVANCED PLUMBING MECHSteel, Concrete
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/31/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/16/2025Pass-Final Boiler Equipment InspectionPassView ↗
09/26/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
08/21/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/06/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/24/2025Post-installed AnchorsRICHARD GREENWALDspecial
07/24/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
07/24/2025Sprayed fire-resistant materialsRICHARD GREENWALDspecial
07/24/2025MasonryRICHARD GREENWALDspecial
07/24/2025Energy Code Compliance InspectionsRICHARD GREENWALDprogress
07/24/2025FinalRICHARD GREENWALDprogress
07/24/2025Fire-Resistance Rated ConstructionRICHARD GREENWALDprogress
04/03/2024Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
04/03/2024Structural Steel - DetailsRICHARD GREENWALDspecial
04/03/2024Structural Cold-Formed SteelRICHARD GREENWALDspecial
03/05/2024FinalRICHARD GREENWALDprogress
11/22/2022FinalBrian Sullivanprogress
11/22/2022MasonryBrian Sullivanspecial
11/21/2022MasonryBrian Sullivanspecial
11/21/2022FinalBrian Sullivanprogress
▾Documents — 309 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/02/2026M00770548-I1Request digital key ↗
09/02/2026M00770548-P1Request digital key ↗
08/22/2026M01001690-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits52
▸BISWORK PERMIT APPLICATION27
04/21/2022140521727Open ↗
03/18/2022122830534Open ↗
01/12/2022140521772Open ↗
Showing 3 of 27 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION22
06/12/2024141023997Open ↗
06/04/2024141024013Open ↗
06/04/2024141024022Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit3
08/22/2026M01001690-P1Open ↗
08/22/2026M01001690-S3Open ↗
08/13/2026M01001690-P4Open ↗
▸Zoning, Tax Lot & Property Records11
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED4
06/12/2024141023997Open ↗
06/04/2024141024013Open ↗
06/04/2024141024022Open ↗
Showing 3 of 4 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT3
06/12/2024141023997Open ↗
06/05/2024141024013Open ↗
05/03/2024123918715Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION3
06/12/2024141023997Open ↗
06/05/2024141024013Open ↗
05/03/2024123918715Open ↗
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
11/26/2012121441699Open ↗
▸Seals & Professional Certifications75
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
04/23/2018122663420Open ↗
04/23/2018122663420Open ↗
04/06/2018104607882Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/02/2026M00770548-I1Open ↗
08/22/2026M01001690-S3Open ↗
08/22/2026M01001690-P5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/31/2026M00770548-P1Open ↗
08/31/2026M01001690-S4Open ↗
08/31/2026M01001690-S4Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
07/24/2013121710470Open ↗
02/07/2013121523299Open ↗
02/07/2013121523299Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026M00770548-P1Open ↗
08/31/2026M01001690-S4Open ↗
08/29/2026M00770548-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
06/12/2024141023997Open ↗
06/04/2024141024013Open ↗
06/04/2024141024022Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
01/28/2016122663420Open ↗
07/24/2013121710470Open ↗
02/07/2013121523299Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/14/2016140521772Open ↗
07/14/2016140521727Open ↗
01/28/2016122663420Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/14/2016140521772Open ↗
07/14/2016140521727Open ↗
07/15/2013140096303Open ↗
▸BISAPPLICANT OWNER SIGNATURE3
06/04/2024141024013Open ↗
06/04/2024141024022Open ↗
11/21/2023141023997Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection16
▸BISANTI-HARASSMENT AREA CHECKLIST4
06/12/2024141023997Open ↗
06/04/2024141024013Open ↗
06/04/2024141024022Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes4
08/31/2016122830534Open ↗
07/13/2016122830534Open ↗
07/14/2016140521772Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCertificate of No Harassment3
08/22/2026M01001690-S3Open ↗
08/22/2026M01001690-P1Open ↗
08/13/2026M01001690-P4Open ↗
▸BISANTI-HARASSMENT CHECKLIST2
08/31/2016122830534Open ↗
07/03/2013121523299Open ↗
▸DOB NOWHPD-1: Anti-Harassment Area Checklist2
09/02/2026M00770548-I1Open ↗
08/13/2026M00770548-P1Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/13/2026M00770548-I1Open ↗
08/13/2026M01001690-S1Open ↗
08/13/2026M01001690-S2Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/14/2016140521772Open ↗
11/26/2012121441699Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
06/08/2015121523299Open ↗
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/26/2023122830534Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/12/2016122830534Open ↗
07/13/2016122830534Open ↗
11/17/2015121523299Open ↗
Showing 3 of 4 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
01/26/2023122830534Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/17/2015121523299Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/15/2013140096303Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/25/2023122830534Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/26/2023122830534Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/26/2023122830534Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/25/2023122830534Open ↗
01/25/2023122830534Open ↗
07/14/2016140521772Open ↗
Showing 3 of 5 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/26/2023122830534Open ↗
▸Approvals, Objections & Sign-offs54
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
09/02/2026M00770548-I1Open ↗
08/22/2026M01001690-P1Open ↗
08/22/2026M01001690-S4Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWTransit Authority Approval11
08/22/2026M01001690-S4Open ↗
08/22/2026M01001690-P5Open ↗
08/22/2026M01001690-P3Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
03/18/2022122830534Open ↗
10/15/2019140521727Open ↗
07/23/2018140521727Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
01/26/2023122830534Open ↗
04/23/2018122663420Open ↗
04/06/2018104607882Open ↗
Showing 3 of 6 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL6
06/12/2024141023997Open ↗
06/04/2024141024013Open ↗
06/04/2024141024022Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/24/2013121710470Open ↗
Showing 1 of 3 on file for this type
▸BISSHED LETTER3
04/21/2022140521727Open ↗
11/27/2020140521727Open ↗
08/03/2017140521727Open ↗
▸BISSUPERSEDING LETTER2
01/12/2022140521772Open ↗
04/08/2021140521727Open ↗
▸BISTRANSIT AUTHORITY APPROVAL1
07/15/2013140096303Open ↗
▸BISFINAL1
01/26/2023122830534Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT13
06/12/2024141023997Open ↗
06/04/2024141024013Open ↗
06/04/2024141024013Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)2
06/04/2024141024022Open ↗
11/21/2023141023997Open ↗
▸Filing & Intake Forms31
▸BISADDITIONAL INFORMATION11
06/12/2024141023997Open ↗
06/05/2024141024013Open ↗
06/04/2024141024022Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM7
04/21/2022140521727Open ↗
03/18/2022122830534Open ↗
01/12/2022140521772Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET7
09/26/2023123918715Open ↗
07/13/2016122830534Open ↗
01/28/2016122663420Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
06/05/2024141023997Open ↗
06/04/2024141024013Open ↗
06/04/2024141024022Open ↗
Showing 3 of 6 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
04/06/2018104607882Open ↗
09/21/2016122830534Open ↗
07/13/2016122830534Open ↗
Showing 3 of 7 on file for this type
▸BISPLOT DIAGRAM2
06/12/2024141023997Open ↗
06/04/2024141024022Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
06/04/2024141024013Open ↗
06/04/2024141024022Open ↗
▸BISSupporting Document: Fee Exempt1
09/26/2023123918715Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
07/15/2013140096303Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M01001690-S4Open ↗