← Back
BuildNYC
Condo, residential unit in elevator building
Abbey Condominium
414 WEST 54TH STREET · BIN 1070070
💬 Discuss this project
1986Year Built
6Stories
R4Building Class
C6-2Zoning
27,030 sfGross Floor Area
34Units
LL97 CoveredRent Stabilized1 Active Violation 0 unresolved · 1 paperwork only 11 likely answered 1 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Condo, residential unit in elevator building · Owner of record: The Abbey Condominium · 7,500 sf lot · 3.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHeavy duty sidewalk shed2p · 2 filings · 9 docs
BulkheadFacade repair and adjacent building protection1p · 1 filing · 5 docs
Floor 5Unit 5B1 filing · 3 docs
Floor 4
Floor 3
Floor 2
Floor 1Facade Repair Project1p · 1 filing · 6 docs
CellarThe Abbey new chimney liner installation1 filing · 5 docs
Site & exteriorHeavy duty sidewalk shed27p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Abbey Condominium903/21/2026
Assaf M203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Permit Architects210/13/2026
Rimkus106/13/2025
Stone104/02/2025
Robert Germain Jr. PE108/14/2023
Gurvinder Singh209/10/2020
Syed Engineering107/24/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution403/21/2026
Stone203/21/2026
Kma Designs203/21/2026
Sandeep Kaur203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kings Group NYScaffold407/08/2026
Guaranteed Home ImprovemeGeneral Contractor303/21/2026
High Quality Electric ofElectrical103/21/2026
Citiline Restorationspecialty_contractor104/09/2026
Romo ConstructionScaffold107/08/2026
G.P. MechanicalPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mohammad Ahead - Professi9286106/04/2025
Metric Consulting and Ins1803104/02/2025
Leo Y Lee Associates2481112/20/2023
Robert F. Germain Jr. PE5100108/14/2023
Building Lifecycle
All (96)Filed (10)Permit Issued (7)Signed Off (6)Facade (FISP) (12)Violation (45)Objection (4)Special Inspection (12)
10/13/2026
Filed — Alteration
IN UNIT 5B ON FLOOR 5, REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01451280-I1
10/13/2026
Filed — Alteration
IN UNIT 5B ON FLOOR 5, REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01451280-S1
10/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Esther Cheung
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/26/2026
Special inspection requirement — Lighting in dwelling units
Esther Cheung
08/25/2026
Special inspection requirement — Final
Esther Cheung
06/16/2026
Signed off — Alteration
M01240225-I1
01/15/2026
Signed off — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIR APPLICATION # AND/OR INSPECTION
M01235534-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2025
Permit issued — Suspended Scaffold
M01235534-I1-SC
06/13/2025
Filed — Alteration
M01240225-I1
06/13/2025
Permit issued — Sidewalk Shed
M01240225-I1-SH
06/06/2025
Permit issued — General Construction
M01199945-I1-GC
06/04/2025
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIR APPLICATION # AND/OR INSPECTION
M01235534-I1
06/03/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MOHAMMAD AHEAD
06/03/2025
Special inspection requirement — Post-installed Anchors
MOHAMMAD AHEAD
04/05/2025
Objection raised — Scope
04/05/2025
Objection resolved — Addressed
04/05/2025
Objection raised — Scope
04/05/2025
Objection resolved — Addressed
04/02/2025
Filed — Alteration
Facade repairs as per plans. No change in use, egress, or occupancy.
M01199945-I1
04/01/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
04/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
03/24/2025
Special inspection requirement — Final
Evan Petkanas
03/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
11/14/2024
Signed off — Alteration
M00976413-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/11/2024
Cycle 9 facade report signed — SWARMP
06/07/2024
Violation issued (ECB, closed)
Boilers
02/21/2024
Cycle 9 facade report submitted
02/20/2024
Signed off — Alteration
M00909850-I1
02/14/2024
Cycle 9 facade inspection completed
01/09/2024
Permit issued — Suspended Scaffold
M00976413-I1-SC
12/20/2023
Filed — Alteration
M00976413-I1
08/23/2023
Permit issued — General Construction
M00909850-I1-GC
08/14/2023
Filed — Alteration
M00909850-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/11/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED
M00372243-I1
01/06/2021
Signed off — Alteration
INSTALL MEDIUM DUTY SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION
M00374645-I1
10/28/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/11/2020
Special inspection requirement — Final
GURVINDER SINGH
09/10/2020
Filed — Alteration
INSTALL MEDIUM DUTY SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION
M00374645-P1
08/05/2020
Violation issued (ECB, open)
Elevators
07/28/2020
Permit issued — Supported Scaffold
M00374645-I1-SF
07/27/2020
Filed — Alteration
INSTALL MEDIUM DUTY SCAFFOLDING AS PER PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION
M00374645-I1
07/24/2020
Filed — Alteration
INSTALLATION OF SIDEWALK SHED
M00372243-I1
07/24/2020
Permit issued — Sidewalk Shed
M00372243-I1-SH
07/16/2020
Special inspection requirement — Final
RAFI HAMID
02/20/2019
Cycle 8 facade report submitted
02/19/2019
Cycle 8 facade inspection completed
02/19/2019
Cycle 8 facade report signed — SWARMP
05/17/2018
Violation issued (ECB, closed)
Construction
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offCitiline Restoration06/30/2025
DOB NOWSidewalk ShedSigned-offKings Group NY06/13/2025
DOB NOWGeneral ConstructionPermit IssuedCitiline Restoration06/06/2025
DOB NOWSuspended ScaffoldSigned-offLawrence Exterior Rest Co01/09/2024
DOB NOWGeneral ConstructionSigned-offGuaranteed Home Improveme08/23/2023
DOB NOWSupported ScaffoldSigned-offRomo Construction07/28/2020
DOB NOWSidewalk ShedSigned-offKings Group NY07/24/2020
BISPLISSUEDGregg NY Plumbing02/10/2021
BISOTISSUEDRite Way Construction11/13/2020
BISOTISSUEDRite Way Construction11/13/2020
BISOTISSUEDRite Way Construction09/30/2020
BISOTISSUEDRite Way Construction09/29/2020
BISEQISSUEDRomo Construction09/03/2020
BISOTISSUEDRomo Construction08/03/2020
BISOTISSUEDRite Way Construction06/22/2020
BISOTISSUEDRite Way Construction11/14/2019
BISPLISSUEDRite Way Plumbing & Heating01/23/2019
BISOTISSUEDRite Way Construction12/05/2018
BISPLISSUEDGlenns Plumbing Services08/23/2018
BISOTISSUEDRite Way Construction08/22/2018
BISOTISSUEDCrafted Interiors Design07/23/2018
BISOTISSUEDCrafted Interiors Design03/29/2018
BISOTISSUEDCrafted Interiors Design02/13/2018
BISPLISSUEDProto P & H Services01/09/2018
BISOTISSUEDCrafted Interiors Design01/08/2018
BISPLISSUEDGlenns Plumbing Services04/07/2017
BISOTISSUEDR.O. Complete Solutions09/16/2016
BISEQISSUEDRockledge Scaffold04/20/2006
BISEQISSUEDRockledge Scaffold03/30/2006
BISEQISSUEDRockledge Scaffold10/11/2005
BISOTISSUEDDJM Contracting Services09/27/2005
1 project · most recent 10/13/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/13/2026——Gas, Water/Sanitary
4 projects · most recent 06/17/2025
General Wiring
FiledStatusContractorScope
06/17/2025CompleteHigh Quality Electric of NYC—
11/06/2023CompleteConde ElectricGeneral Wiring
11/15/2021CompleteGsa Electric—
09/09/2018Permit IssuedApollo ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/02/2026Energy Code Compliance InspectionsEsther Cheungprogress
08/26/2026Fire-Resistant Penetrations and Joints—special
08/26/2026Lighting in dwelling unitsEsther Cheungenergy_progress
08/25/2026FinalEsther Cheungprogress
06/03/2025Alternative Materials - OTCR Buildings Bulletin NumberMOHAMMAD AHEADspecial
06/03/2025Post-installed AnchorsMOHAMMAD AHEADspecial
04/01/2025MasonrySAMI HAJJAR P.Especial
04/01/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/24/2025FinalEvan Petkanasprogress
03/24/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
09/11/2020FinalGURVINDER SINGHprogress
07/16/2020FinalRAFI HAMIDprogress
▾Documents — 227 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch7
10/14/2026M01451280-S1Request digital key ↗
10/14/2026M01451280-I1Request digital key ↗
08/29/2026M00909850-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00374645-I1Request digital key ↗
08/15/2026M00374645-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00372243-I1Request digital key ↗
▸Applications & Permits37
▸BISPLAN / WORK APPROVAL APPLICATION21
08/07/2020140935246Open ↗
08/07/2020123741424Open ↗
05/22/2020123486691Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION14
02/10/2021140824874Open ↗
09/30/2020123486691Open ↗
09/29/2020123486691Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
08/03/2020123741424Open ↗
08/03/2020123741424Open ↗
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature8
10/14/2026M01451280-I1Open ↗
10/14/2026M01451280-S1Open ↗
08/29/2026M00909850-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
10/15/2026M01451280-I1Open ↗
10/15/2026M01451280-I1Open ↗
10/15/2026M01451280-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
02/28/2020123741424Open ↗
02/12/2019140774384Open ↗
11/16/2018140536659Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/07/2020140935246Open ↗
01/17/2019140824874Open ↗
08/20/2018140790687Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/07/2020140935246Open ↗
01/17/2019140824874Open ↗
08/20/2018140790687Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/07/2020140935246Open ↗
01/17/2019140824874Open ↗
08/20/2018140790687Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026M01199945-I1Open ↗
08/29/2026M01235534-I1Open ↗
08/29/2026M01235534-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
07/03/2018140774384Open ↗
12/21/2017140724777Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING5
01/17/2019140824874Open ↗
04/04/2018140724777Open ↗
03/28/2018140724777Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
11/21/2018140536659Open ↗
11/14/2018140536659Open ↗
10/29/2018140536659Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
12/10/2020140824874Open ↗
▸Safety & Tenant Protection28
▸BISTENANT PROTECTION PLAN AND NOTES8
09/09/2020123741424Open ↗
08/07/2020140935246Open ↗
01/17/2019140824874Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist8
10/14/2026M01451280-I1Open ↗
10/14/2026M01451280-S1Open ↗
08/13/2026M00374645-I1Open ↗
Showing 3 of 8 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON4
05/29/2020123486691Open ↗
03/31/2020123741424Open ↗
07/03/2018140774384Open ↗
Showing 3 of 4 on file for this type
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST3
01/17/2019140824874Open ↗
08/20/2018140790687Open ↗
09/06/2016140536659Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
09/09/2020123741424Open ↗
02/28/2020123741424Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026M00374645-P1Open ↗
08/13/2026M00374645-I1Open ↗
▸DOB NOWCertificate of No Harassment1
08/13/2026M00909850-I1Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
05/29/2020123486691Open ↗
02/28/2020123741424Open ↗
01/17/2019140824874Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/29/2026M00909850-I1Open ↗
08/13/2026M01199945-I1Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
01/28/2022123741424Open ↗
12/11/2020123486691Open ↗
09/25/2020123486691Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/28/2020123741424Open ↗
11/16/2018140536659Open ↗
11/16/2018140536659Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
01/28/2022123741424Open ↗
02/12/2019140774384Open ↗
11/16/2018140536659Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/11/2020123486691Open ↗
▸BISNYCECC ANALYSIS1
09/06/2016140536659Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY19
01/28/2022123741424Open ↗
03/02/2021140790687Open ↗
01/25/2021140935246Open ↗
Showing 3 of 19 on file for this type
▸BISFINAL INSPECTION1
12/11/2020123486691Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
01/31/2022123741424Open ↗
03/02/2021140790687Open ↗
02/17/2021140824874Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/10/2021140824874Open ↗
▸BISSUPERSEDING LETTER1
02/10/2021140824874Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT14
01/28/2022123741424Open ↗
12/10/2020140824874Open ↗
09/09/2020123741424Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
03/02/2021140790687Open ↗
12/11/2020123486691Open ↗
12/10/2020140824874Open ↗
▸Filing & Intake Forms29
▸BISADDITIONAL INFORMATION11
05/08/2020140790687Open ↗
03/25/2020123741424Open ↗
02/14/2019140536659Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM7
03/11/2019140536659Open ↗
02/12/2019140774384Open ↗
12/11/2018140790687Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
08/07/2020140935246Open ↗
01/17/2019140824874Open ↗
08/20/2018140790687Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET5
05/27/2020123486691Open ↗
05/27/2020123486691Open ↗
05/22/2020123486691Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸DOB NOWCalculations2
08/13/2026M01235534-I1Open ↗
08/13/2026M00976413-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01235534-I1Open ↗
08/13/2026M00976413-I1Open ↗