Office with commercial, 1-6 stories
414 WILLIS AVENUE
BRONX · BIN 2000491
💬 Discuss this project
1931Year Built
2Stories
O5Building Class
R6Zoning
3,251 sfGross Floor Area
3Units
4 Open Violations ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: BALAJI REALTY CORP · 1,635 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 3 docs
Floor 2Under Construction16p · 2 filings · 20 docs
Floor 1Under Construction15p · 2 filings · 20 docs
CellarUnder Construction9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BALAJI REALTY2107/08/2026
DFE CONTRACTOR203/22/2026
RELIABLE ENTERPRISES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT509/30/2025
MJE PROFESSIONAL SERVICES108/21/2025
ALBERT MUNOZ107/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J SIBAJA KITCHEN VENTILATION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DFE CONTRACTOR LLCGeneral Contractor607/08/2026
JUST PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM ENGINEERING SERVICES P7975509/30/2025
Building Lifecycle
All (61)Filed (7)Permit Issued (5)Violation (8)Inspection (7)Objection (4)Special Inspection (30)
05/18/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/18/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/02/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/31/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/27/2026
Violation issued (ECB, open)
Construction
02/23/2026
Permit issued — Plumbing
X00915504-S1-PL
02/10/2026
Permit issued — Mechanical Systems
X01255737-I1-MS
02/06/2026
Permit issued — Construction Fence
X00915504-S2-FN
11/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Albert Munoz
11/07/2025
Special inspection requirement — Maintenance information
Albert Munoz
11/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Albert Munoz
11/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Albert Munoz
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
11/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Albert Munoz
10/28/2025
Objection resolved — Addressed
10/23/2025
Objection raised — Other
10/21/2025
Permit issued — Structural
X00915504-I1-GC-CX
10/10/2025
Objection resolved — Addressed
10/07/2025
Objection raised — Other
09/30/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR RENOVATION OF MIXED-USE BUILDING AND NEW CO. PROPOSED STRUCTURAL WORK AND NEW TENANT SEPARATION AT FIRST FLOOR, AND NEW RESIDENTIAL UNIT AT SECOND FLOOR. NO CHANGE IN BULK.
X00915504-P6
09/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Albert Munoz
09/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Albert Munoz
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
09/08/2025
Special inspection requirement — Maintenance information
Albert Munoz
09/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Albert Munoz
09/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Albert Munoz
08/21/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01275478-I1
07/17/2025
Filed — Alteration
X01255737-I1
06/26/2025
Violation issued (ECB, closed)
Construction
06/06/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR RENOVATION OF MIXED-USE BUILDING AND NEW CO. PROPOSED STRUCTURAL WORK AND NEW TENANT SEPARATION AT FIRST FLOOR, AND NEW RESIDENTIAL UNIT AT SECOND FLOOR. NO CHANGE IN BULK.
X00915504-S1
05/29/2025
Violation issued (ECB, open)
Construction
05/28/2025
Violation issued (ECB, closed)
Construction
03/26/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR RENOVATION OF MIXED-USE BUILDING AND NEW CO. PROPOSED STRUCTURAL WORK AND NEW TENANT SEPARATION AT FIRST FLOOR, AND NEW RESIDENTIAL UNIT AT SECOND FLOOR. NO CHANGE IN BULK.
X00915504-S2
02/28/2025
Permit issued — Foundation
X00915504-I1-GC-CX
02/25/2025
Special inspection requirement — Post-installed Anchors
Albert Munoz
02/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Albert Munoz
02/25/2025
Special inspection requirement — Structural Cold-Formed Steel
Albert Munoz
02/25/2025
Special inspection requirement — Ventilation and air distribution system
Albert Munoz
02/25/2025
Special inspection requirement — Interior lighting power
Albert Munoz
02/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Albert Munoz
02/25/2025
Special inspection requirement — Concrete - Cast-In-Place
Albert Munoz
02/25/2025
Special inspection requirement — Lighting controls
Albert Munoz
02/25/2025
Special inspection requirement — Final
Albert Munoz
02/25/2025
Special inspection requirement — Structural Steel - Details
Albert Munoz
02/25/2025
Special inspection requirement — Footing and Foundation
Albert Munoz
02/25/2025
Special inspection requirement — Insulation placement and R values
Albert Munoz
02/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
Albert Munoz
02/25/2025
Special inspection requirement — Fenestration air leakage
Albert Munoz
02/25/2025
Special inspection requirement — Masonry
Albert Munoz
02/25/2025
Special inspection requirement — Air barrier — testing
Albert Munoz
02/25/2025
Special inspection requirement — Metering
Albert Munoz
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Albert Munoz
02/14/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR RENOVATION OF MIXED-USE BUILDING AND NEW CO. PROPOSED STRUCTURAL WORK AND NEW TENANT SEPARATION AT FIRST FLOOR, AND NEW RESIDENTIAL UNIT AT SECOND FLOOR. NO CHANGE IN BULK.
X00915504-P1
08/10/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR RENOVATION OF MIXED-USE BUILDING AND NEW CO. PROPOSED STRUCTURAL WORK AND NEW TENANT SEPARATION AT FIRST FLOOR, AND NEW RESIDENTIAL UNIT AT SECOND FLOOR. NO CHANGE IN BULK.
X00915504-I1
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMOHAMED ABDELRAZEK02/23/2026
DOB NOWMechanical SystemsPermit IssuedDFE CONTRACTOR LLC02/10/2026
DOB NOWConstruction FencePermit IssuedDFE CONTRACTOR LLC02/06/2026
DOB NOWStructuralPermit IssuedDFE CONTRACTOR LLC10/21/2025
DOB NOWFoundationPermit IssuedDFE CONTRACTOR LLC02/28/2025
1 project · most recent 09/30/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/30/2025Permit IssuedJUST PLBG & HTG INCGas, Water/Sanitary
2 projects · most recent 08/22/2025
General Wiring
FiledStatusContractorScope
08/22/2025Permit IssuedRICHARD NEU—
05/05/2025Permit IssuedWCK ELECTRIC CORP.General Wiring
1 project · most recent 09/30/2025
Steel Concrete Masonry Wood
FiledStatusContractorScope
09/30/2025Permit IssuedJUST PLBG & HTG INCSteel, Concrete, Masonry, Wood
1 project · most recent 08/21/2025
Sidewalk Shed
FiledStatusContractorScope
08/21/2025——Sidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/02/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/31/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
11/07/2025Fire-Resistant Penetrations and JointsAlbert Munozspecial
11/07/2025Energy Code Compliance InspectionsAlbert Munozprogress
11/07/2025HVAC-R and service water piping design and insulationAlbert Munozenergy_progress
11/07/2025HVAC-R and service water heating system controlsAlbert Munozenergy_progress
11/07/2025Maintenance informationAlbert Munozenergy_progress
11/07/2025HVAC-R and service water heating equipmentAlbert Munozenergy_progress
09/08/2025Energy Code Compliance InspectionsAlbert Munozprogress
09/08/2025Fire-Resistant Penetrations and JointsAlbert Munozspecial
09/08/2025HVAC-R and service water heating system controlsAlbert Munozenergy_progress
09/08/2025HVAC-R and service water heating equipmentAlbert Munozenergy_progress
09/08/2025HVAC-R and service water piping design and insulationAlbert Munozenergy_progress
09/08/2025Maintenance informationAlbert Munozenergy_progress
02/25/2025Fire-Resistance Rated ConstructionAlbert Munozprogress
02/25/2025Footing and FoundationAlbert Munozprogress
02/25/2025FinalAlbert Munozprogress
02/25/2025Lighting controlsAlbert Munozenergy_progress
02/25/2025Interior lighting powerAlbert Munozenergy_progress
02/25/2025Insulation placement and R valuesAlbert Munozenergy_progress
02/25/2025Ventilation and air distribution systemAlbert Munozenergy_progress
02/25/2025Fenestration air leakageAlbert Munozenergy_progress
02/25/2025Fenestration and door U-factor and product ratingsAlbert Munozenergy_progress
02/25/2025Air barrier — testing Albert Munozenergy_progress
02/25/2025MeteringAlbert Munozenergy_progress
02/25/2025Maintenance informationAlbert Munozenergy_progress
02/25/2025Permanent certificateAlbert Munozenergy_progress
Latest 25 of 70.
▾Documents — 127 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026X00915504-S1Request digital key ↗
08/20/2026X00915504-P1Request digital key ↗
08/20/2026X00915504-P5Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/20/2026X00915504-I1Open ↗
▸Seals & Professional Certifications105
▸DOB NOWProgress Inspector Seal & Signature64
09/01/2026X00915504-P6Open ↗
09/01/2026X00915504-P6Open ↗
09/01/2026X00915504-P6Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/01/2026X00915504-P6Open ↗
09/01/2026X00915504-I1Open ↗
09/01/2026X00915504-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026X00915504-S1Open ↗
08/20/2026X00915504-S2Open ↗
08/20/2026X00915504-P1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/20/2026X00915504-I1Open ↗
08/20/2026X00915504-S1Open ↗
08/20/2026X00915504-S2Open ↗
Showing 3 of 7 on file for this type
▸Other Documents6
▸DOB NOWSite Survey: Initial3
08/20/2026X00915504-I1Open ↗
08/13/2026X00915504-P1Open ↗
08/13/2026X00915504-P5Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026X00915504-P1Open ↗
08/20/2026X00915504-P5Open ↗
08/20/2026X00915504-I1Open ↗