4140 BROADWAY
MANHATTAN · BIN 1063557
💬 Discuss this project
1930Year Built
7Stories
M1Building Class
C8-3Zoning
113,373 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸
Church, synagogue, chapel · 30,475 sf lot · 3.72 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingLandscapeGeneral
Roof1p · 1 filing · 13 docs
Floor 21p · 3 filings · 9 docs
Floor 13p · 2 filings · 9 docs
Mezzanine5p · 6 filings · 20 docs
Cellar1p · 4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNK ENTERPRISES NY1507/31/2026
UNITED PALACE OF SPIRITUAL ARTS1807/08/2026
PHOENIX SUTTON STR INC1903/22/2026
UNITED CHURCH103/22/2026
46-54 WADSWORTH LLC103/22/2026
CHRIST UNITED CHURCH I103/22/2026
UNITED CHRISTIAN CHURCH103/22/2026
INTERSYSTEMS203/21/2026
UNITED EVANGELISTIC ASSOCIATION103/21/2026
MASTER FIRE PREVENTION SYSTEMS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
DIRECT ACCESS EXPEDITING, INC.203/21/2026
GEORGE E BERGER ASS403/21/2026
GILMAN CONSULTANT603/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor1003/21/2026
CESAR QUERYElectrical803/21/2026
MNK ENTERPRISES NY INCGeneral Contractor707/08/2026
PRESERV BLD RESTOR MGT INGeneral Contractor507/08/2026
PARK CONTRACTING GROUPGeneral Contractor407/31/2026
C.Q. ELECTR'L CONTRG CORPElectrical303/22/2026
LANE REFRIGERATION CO.,INGeneral Contractor203/21/2026
YORKE CONSTRUCTION CORPGeneral Contractor203/21/2026
KING HOIST & SCAFFOLDINGGeneral Contractor107/08/2026
CITY/SUBURBAN PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JMV CONSULTING ENGINEERIN804205/28/2025
CHRISTIAN L. MARTOS ENGIN5965212/01/2021
STRUCT. ENGINEERING INTEG4174108/04/2021
KAMEN TALL ARCHITECTS P.C3606103/09/2021
SOCOTEC ENGINEERING4983201/14/2021
Building Lifecycle
All (166)Filed (29)Permit Issued (18)Signed Off (9)Violation (60)Objection (38)Special Inspection (12)
07/30/2026
Permit issued — Sidewalk Shed
M00989819-I1-SH
06/09/2026
Filed — No Work
M01413718-I1
04/08/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/09/2026
Objection raised — Inspections
03/09/2026
Objection raised — Plumbing
03/09/2026
Objection raised — Plumbing
03/06/2026
Filed — No Work
M01366971-I1
02/25/2026
Filed — Alteration
REMOVAL OF WATER HEATER AND ASSOCIATED GAS PIPING IN CELLAR AND REMOVAL OF GAS FIRED KITCHEN EQUIPMENT AND ASSOCIATED GAS PIPING ON THE FIRST FLOOR. CUT PIPING BACK TO GAS METER. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01309650-I1
12/08/2025
Filed — No Work
M01330506-I1
09/09/2025
Filed — No Work
M01283576-I1
07/28/2025
Permit issued — Sidewalk Shed
M00989819-I1-SH
06/12/2025
Objection resolved — Addressed
06/05/2025
Objection raised — Scope
06/04/2025
Filed — No Work
M01234731-I1
05/29/2025
Signed off — Alteration
INSTALL HVAC SYSTEM ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01051167-I1
05/29/2025
Special inspection requirement — Mechanical Systems
Joseph Vuto
05/29/2025
Special inspection requirement — Final
Joseph Vuto
05/28/2025
Filed — Alteration
INSTALL HVAC SYSTEM ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01051167-P1
05/28/2025
Special inspection requirement — Mechanical Systems
Joseph Vuto
05/28/2025
Special inspection requirement — Final
Joseph Vuto
03/12/2025
Objection resolved — Addressed
03/12/2025
Objection resolved — Addressed
03/06/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00989819-I1
03/05/2025
Objection raised — Scope
03/05/2025
Objection raised — Fire_Protection
03/03/2025
Filed — No Work
M01188289-I1
01/14/2025
Permit issued — Sidewalk Shed
M00989819-I1-SH
09/17/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01070094-I1
07/26/2024
Permit issued — Mechanical Systems
M01051167-I1-MS
07/15/2024
Filed — Alteration
INSTALL HVAC SYSTEM ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01051167-I1
07/01/2024
Permit issued — Supported Scaffold
M01070094-I1-SF
06/29/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01070094-I1
03/13/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00989819-P1
03/11/2024
Filed — No Work
M01017893-I1
03/11/2024
Objection raised — Admin
03/11/2024
Objection resolved — Addressed
03/11/2024
Objection raised — Admin
03/11/2024
Objection resolved — Addressed
02/05/2024
Signed off — Alteration
Filing herewith for Plumbing work as per plans. Installation and modifications of plumbing fixtures and associated piping. No change, to use egress or occupancy.
M00399923-I1
01/29/2024
Signed off — Alteration
M00399905-I1
01/19/2024
Permit issued — Sidewalk Shed
M00989819-I1-SH
01/17/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00989819-I1
12/04/2023
Filed — No Work
M00970947-I1
08/09/2023
Objection resolved — Addressed
08/04/2023
Objection resolved — Addressed
07/21/2023
Objection resolved — Addressed
07/20/2023
Objection raised — Structural
07/20/2023
Objection raised — Admin
07/20/2023
Objection raised — Admin
07/19/2023
Filed — No Work
M00906505-I1
03/15/2023
Signed off — Alteration
M00470651-S1
07/28/2022
Filed — No Work
M00781674-I1
06/27/2022
Signed off — Alteration
M00470651-I1
06/24/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00427427-I1
06/08/2022
Signed off — Alteration
M00566562-I1
04/26/2022
Permit issued — General Construction
M00470651-I1-GC
12/09/2021
Permit issued — Structural
M00470651-S1-ST
12/01/2021
Filed — Alteration
M00470651-S1
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP07/30/2026
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP07/28/2025
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES NY INC01/14/2025
DOB NOWMechanical SystemsSigned-offLANE REFRIGERATION CO.,IN07/26/2024
DOB NOWSupported ScaffoldSigned-offMNK ENTERPRISES NY INC07/01/2024
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES NY INC01/19/2024
DOB NOWGeneral ConstructionSigned-offPRESERV BLD RESTOR MGT IN04/26/2022
DOB NOWStructuralSigned-offPRESERV BLD RESTOR MGT IN12/09/2021
DOB NOWStructuralPermit IssuedPRESERV BLD RESTOR MGT IN12/01/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/15/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/15/2021
DOB NOWStructuralSigned-offPHOENIX SUTTON STR INC08/20/2021
DOB NOWSupported ScaffoldPermit IssuedKING HOIST & SCAFFOLDING06/07/2021
DOB NOWGeneral ConstructionSigned-offPRESERV BLD RESTOR MGT IN04/16/2021
DOB NOWMechanical SystemsPermit IssuedYORKE CONSTRUCTION CORP03/12/2021
DOB NOWPlumbingSigned-offCITY/SUBURBAN PLBG CORP02/25/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/16/2020
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC11/16/2020
BIS—ISSUEDBERNARDO J ARIAS,R.A.10/21/2024
BIS—ISSUEDBERNARDO J. ARIAS, R.A.10/18/2023
BIS—ISSUEDBERNARDO J ARIAS REGISTER ARCHIT10/17/2022
BISOTISSUEDYORKE CONSTRUCTION CORP01/05/2022
BIS—ISSUEDBERNARDO J ARIAS,R.A.10/14/2021
BISOTISSUEDYORKE CONSTRUCTION CORP07/22/2021
BISOTISSUEDYORKE CONSTRUCTION CORP07/22/2021
BISOTISSUEDYORKE CONSTRUCTION CORP04/12/2021
BISOTISSUEDYORKE CONSTRUCTION CORP04/12/2021
BIS—ISSUEDBERNARDO J. ARIAS ARCHITECT10/20/2020
BIS—ISSUEDBERNARDO J, ARIAS, ARCHITECCT10/22/2019
BISMHISSUEDACS ENVIRONMENTAL & CONST08/28/2018
BIS—ISSUEDN/A10/23/2017
BISBLISSUEDS.J. FUEL CO., INC10/22/2015
BISOTISSUEDBOUBACAR SOW10/30/2013
BISPLISSUEDPRIME PIPING & HEATING IN07/25/2013
BISOTISSUEDBOUBACAR SOW05/07/2013
BISFPISSUEDMASTER FIRE SYSTEMS, INC11/30/2012
BISPLISSUED21 PLUMBING & HEATING INC06/20/2012
BISOTISSUEDPHILLIP BETTON06/11/2012
BISOTISSUEDBETTER LIVING ENT. INC02/03/2012
BISEQISSUEDINTERSYSTEMS CORPORATION12/24/2009
+ 8 more permits on file
1 project · most recent 02/25/2026
Gas
FiledStatusContractorScope
02/25/2026——Gas
16 projects · most recent 05/25/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
05/25/2026Permit IssuedALLIANCE ELEVATOR COMPANY—
05/04/2026Permit IssuedC.Q. ELECTR'L CONTRG CORPGeneral Wiring
11/26/2025CompleteC.Q. ELECTR'L CONTRG CORPGeneral Wiring
11/08/2025CompleteC.Q. ELECTR'L CONTRG CORPGeneral Wiring
11/07/2025CompleteC.Q. ELECTR'L CONTRG CORPGeneral Wiring
10/19/2025CompleteC.Q. ELECTR'L CONTRG CORPGeneral Wiring
10/19/2025CompleteC.Q. ELECTR'L CONTRG CORPGeneral Wiring
09/15/2025CompleteC.Q. ELECTR'L CONTRG CORPGeneral Wiring
09/15/2025CompleteC.Q. ELECTR'L CONTRG CORPGeneral Wiring
08/17/2025CancelledC.Q. ELECTR'L CONTRG CORPGeneral Wiring
01/17/2024Permit IssuedRICHARD NEU—
06/14/2021CompleteTEAM ELECTRIC, INCGeneral Wiring
11/17/2020CompleteELPO ELECTRICAL CONTG INC—
07/31/2019CompleteC.Q. ELECTR'L CONTRG CORP3 meters, 3 new_meters
07/24/2019CompleteC.Q. ELECTR'L CONTRG CORPHVAC Wiring
2 projects · most recent 03/13/2024
Sidewalk Shed Scaffold
FiledStatusContractorScope
03/13/2024Permit IssuedPARK CONTRACTING GROUPSidewalk Shed
06/07/2021Permit IssuedKING HOIST & SCAFFOLDINGScaffold
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
05/29/2025Mechanical SystemsJoseph Vutospecial
05/29/2025FinalJoseph Vutoprogress
05/28/2025Mechanical SystemsJoseph Vutospecial
05/28/2025FinalJoseph Vutoprogress
06/17/2021FinalSunil Saigalprogress
06/17/2021Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
06/17/2021Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
06/16/2021Fire-Resistant Penetrations and Joints—special
06/04/2021Post-installed Anchors—special
02/15/2021MasonryScott Kamenspecial
02/15/2021Energy Code Compliance InspectionsScott Kamenprogress
02/15/2021FinalScott Kamenprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
United PalaceOtherFloor 1, Mezzanine
Project M01366971 No Work · TA Certificate of Operation Issued · 03/06/2026
Project M01330506 No Work · TA Certificate of Operation Issued · 12/08/2025
Project M01283576 No Work · TA Certificate of Operation Issued · 09/09/2025
Project M01188289 No Work · TA Certificate of Operation Issued · 03/03/2025
United Palace Of Spiritual ArtsOtherFloor 1, Mezzanine
Project M00399923 Alteration · LOC Issued · 01/14/2021
Project M00399905 Alteration · LOC Issued · 01/13/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 327 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch - Temporary Place of Assembly11
09/03/2026M00535277-I1Request digital key ↗
09/02/2026M00781674-I1Request digital key ↗
08/29/2026M00906505-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch10
09/04/2026M00470651-S1Request digital key ↗
09/03/2026M00535078-I1Request digital key ↗
09/03/2026M00566562-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/03/2026M00427427-I1Request digital key ↗
09/03/2026M00427427-P2Request digital key ↗
09/03/2026M00427427-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/03/2026M00427427-I1Request digital key ↗
09/03/2026M00427427-P1Request digital key ↗
09/03/2026M00427427-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00399923-I1Request digital key ↗
08/15/2026M00399923-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00399905-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00470651-I1Request digital key ↗
▸Applications & Permits71
▸BISPLAN / WORK APPROVAL APPLICATION38
08/18/2025121587498Open ↗
06/23/2025121587498Open ↗
08/29/2024103985519Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION21
10/21/2024121587498Open ↗
10/19/2023121587498Open ↗
10/18/2022121587498Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWLPC Approval/Permit8
08/13/2026M00399923-I1Open ↗
08/13/2026M00470651-I1Open ↗
08/13/2026M00470651-S1Open ↗
Showing 3 of 8 on file for this type
▸BISPLACE OF ASSEMBLY3
12/09/2015121587504Open ↗
09/17/2013121587504Open ↗
03/10/2009110460625Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
04/08/2021140971054Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
07/07/2025121587498Open ↗
▸Seals & Professional Certifications59
▸DOB NOWDPL-1: Design Professional Seal & Signature28
09/04/2026M00399905-I1Open ↗
09/04/2026M00399923-I1Open ↗
09/04/2026M00399923-P1Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
12/07/2020140971054Open ↗
04/16/2018123439056Open ↗
04/16/2018123439056Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026M00470651-I1Open ↗
09/01/2026M00399923-I1Open ↗
09/01/2026M00399923-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026M00470651-I1Open ↗
09/02/2026M00470651-I1Open ↗
08/28/2026M01051167-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
12/08/2009120220091Open ↗
04/09/2009110316113Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
12/08/2009120220091Open ↗
04/09/2009110316113Open ↗
Showing 2 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/13/2020140971054Open ↗
▸Trade Schedules & Equipment18
▸BISSELF-CERT PLUMBING NOTICE4
07/10/2014110444635Open ↗
03/31/2014110444635Open ↗
10/07/2013110444635Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
03/05/2009110444635Open ↗
03/05/2009110444635Open ↗
Showing 2 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
09/06/2024123439056Open ↗
09/01/2011110362982Open ↗
08/17/2011110362982Open ↗
▸BISEQUIPMENT USE PERMITS2
09/06/2024123439056Open ↗
09/01/2011110362982Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/25/2013110444635Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/11/2014110444635Open ↗
▸BISSPRINKLER SYSTEMS1
06/12/2024110444635Open ↗
▸BISFIRE ALARM TEST1
06/12/2024110444635Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/15/2015122457108Open ↗
▸BISSTANDPIPE SYSTEMS1
06/12/2024110444635Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
04/16/2018123439056Open ↗
10/15/2015122457108Open ↗
09/11/2013121587498Open ↗
▸BISST-1 Street Tree Checklist1
04/09/2009110316113Open ↗
▸BISSTREET TREE SIGNOFF1
07/08/2025121587498Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/04/2026M00399905-I1Open ↗
09/04/2026M00399923-P1Open ↗
09/04/2026M00399923-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
03/12/2021140971054Open ↗
01/15/2021140971054Open ↗
04/16/2018123439056Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
12/08/2009120220091Open ↗
04/09/2009110316113Open ↗
03/10/2009110460625Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
01/30/2009110444635Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS INSPECTION REPORT1
04/09/2009110316113Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
09/11/2013121587498Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/24/2021140971054Open ↗
11/13/2020140971054Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/06/2015122457108Open ↗
▸BISEMERGENCY LIGHTING - PA1
06/12/2024110444635Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/08/2024140971054Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/08/2024140971054Open ↗
▸BISLIGHTING CONTROLS1
01/08/2024140971054Open ↗
▸BISINTERIOR LIGHTING POWER1
01/08/2024140971054Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00399905-I1Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY14
09/10/2024123439056Open ↗
06/11/2024110444635Open ↗
06/11/2024110444635Open ↗
Showing 3 of 14 on file for this type
▸BISSTRUCTURAL STEEL - DETAILS2
01/08/2024140971054Open ↗
01/08/2024140971054Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/08/2024140971054Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/08/2024140971054Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/08/2024140971054Open ↗
▸Approvals, Objections & Sign-offs50
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
09/04/2026M00399905-I1Open ↗
09/04/2026M00399923-P1Open ↗
09/04/2026M00399923-I1Open ↗
Showing 3 of 26 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
09/11/2013121587498Open ↗
08/02/2013121728675Open ↗
12/08/2009120220091Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
05/19/2016121587498Open ↗
05/04/2016121587498Open ↗
01/28/2016121587498Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
09/10/2024123439056Open ↗
06/12/2024110444635Open ↗
05/31/2024100849290Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL2
06/12/2024110444635Open ↗
01/08/2024140971054Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/14/2018123439056Open ↗
05/01/2013120220091Open ↗
▸BISLANDMARKS SIGNOFF2
05/20/2024123439056Open ↗
01/09/2024140971054Open ↗
▸BISLANDMARKS APPROVAL1
03/24/2021140971054Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT9
05/14/2024110444635Open ↗
12/07/2020140971054Open ↗
11/13/2020140971054Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
07/07/2025121587498Open ↗
05/14/2024123439056Open ↗
05/14/2024110444635Open ↗
Showing 3 of 4 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
10/19/2023121587498Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION10
09/05/2025121587498Open ↗
01/24/2024140971054Open ↗
03/24/2021140971054Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET9
12/07/2020140971054Open ↗
12/07/2018123589394Open ↗
04/16/2018123439056Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM3
10/14/2021121587498Open ↗
10/21/2020121587498Open ↗
05/13/2020121728675Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/13/2020140971054Open ↗
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
01/24/2024140971054Open ↗
10/15/2015122457108Open ↗
09/11/2013121587498Open ↗
▸BISPlot Diagram2
04/09/2009110316113Open ↗
04/28/2015121587498Open ↗
▸BISSupporting Document: Fee Exempt1
08/05/2025121587498Open ↗