Two family converted from one family
4148 EDSON AVENUE
BRONX · Wakefield-Woodlawn · BIN 2069013
💬 Discuss this project
1940Year Built
1.5Stories
B3Building Class
R4-1Zoning
1,996 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · 2,500 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC107/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/23/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
04/14/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01259145-I1
08/01/2025
Permit issued — Solar
X01259145-I1-SL
07/23/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01259145-I1
07/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/21/2025
Special inspection requirement — Final
Walid Abdulla
07/21/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
09/20/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/01/2025
BISOTISSUEDPRO CUSTOM SOLAR LLC05/01/2023
BISPLISSUEDROCK E SMALL PLBG&HTG INC02/05/2007
BIS—ISSUEDCOBALT ENGINEERING09/12/2006
BIS—ISSUEDCOBALT ENGINEERING06/15/2006
1 project · most recent 07/23/2025
FiledStatusContractorScope
07/23/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/21/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/21/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/21/2025Energy Code Compliance InspectionsWalid Abdullaprogress
07/21/2025FinalWalid Abdullaprogress
07/21/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026X01259145-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
07/09/2025240347228Open ↗
04/26/2023240347228Open ↗
▸BISWORK PERMIT APPLICATION1
05/01/2023240347228Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026X01259145-I1Open ↗
08/28/2026X01259145-I1Open ↗
08/28/2026X01259145-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026X01259145-I1Open ↗
08/28/2026X01259145-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/26/2023240347228Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/26/2023240347228Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/26/2023240347228Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026X01259145-I1Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
04/28/2023240347228Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/26/2023240347228Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026X01259145-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/26/2023240347228Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/26/2023240347228Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
04/26/2023240347228Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/26/2023240347228Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01259145-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/26/2023240347228Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
04/26/2023240347228Open ↗