← Back
BuildNYC
Three families
415 2ND STREET
BROOKLYN · Park Slope · BIN 3020836
💬 Discuss this project
1901Year Built
2Stories
C0Building Class
R6BZoning
2,854 sfGross Floor Area
3Units
Rent Stabilized0 Active Violations
Three families · 1,800 sf lot · 1.59 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Cellar to 2nd floor proposed work and demolitionUnder Construction2p · 1 filing · 14 docs
Floor 1Cellar to 2nd floor proposed work and demolitionUnder Construction2p · 1 filing · 14 docs
CellarCellar to 2nd floor proposed work and demolitionUnder Construction7p · 1 filing · 14 docs
Sub-BasementCellar to 2nd floor proposed work and demolitionUnder Construction2p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VKW Design410/04/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/18/2026$2.9M—Private party → Private party$999/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VKW Design209/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cube Build GroupsGeneral Contractor109/25/2026
American Standard P&H CororpPlumbing109/30/2026
Building Lifecycle
All (41)Filed (2)Permit Issued (2)Violation (21)Special Inspection (16)
09/29/2026
Permit issued — Plumbing
B01462804-S1-PL
09/24/2026
Permit issued — General Construction
B01462804-I1-GC-CX
09/21/2026
Filed — Alteration
INTERIOR RENOVATION OF AN EXISTING THREE FAMILY DWELLING. GENERAL CONSTRUCTION/MECHANICAL WORK ON THE CELLAR, BASEMENT, FIRST AND SECOND FLOORS AS PER PLANS. NO CHANGES TO EGRESS, USE OR OCCUPANCY.
B01462804-S1
09/21/2026
Filed — Alteration
INTERIOR RENOVATION OF AN EXISTING THREE FAMILY DWELLING. GENERAL CONSTRUCTION/MECHANICAL WORK ON THE CELLAR, BASEMENT, FIRST AND SECOND FLOORS AS PER PLANS. NO CHANGES TO EGRESS, USE OR OCCUPANCY.
B01462804-I1
09/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yuxuan Liu
09/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Yuxuan Liu
09/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
Yuxuan Liu
09/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Yuxuan Liu
09/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yuxuan Liu
09/21/2026
Special inspection requirement — Mechanical Systems
Yuxuan Liu
09/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Yuxuan Liu
09/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
Yuxuan Liu
09/21/2026
Special inspection requirement — Final
Yuxuan Liu
09/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
Yuxuan Liu
09/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
Yuxuan Liu
09/21/2026
Special inspection requirement — Fenestration air leakage
Yuxuan Liu
09/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Yuxuan Liu
09/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Yuxuan Liu
09/21/2026
Special inspection requirement — Fenestration areas
Yuxuan Liu
09/21/2026
Special inspection requirement — Interior lighting power
Yuxuan Liu
04/30/2026
Violation issued (HPD, closed)
A
11/25/2025
Violation issued (HPD, closed)
C
11/25/2025
Violation issued (HPD, closed)
C
11/25/2025
Violation issued (HPD, closed)
A
06/05/2025
Violation issued (HPD, closed)
A
04/03/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/17/2023
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
I
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
11/15/2017
Violation issued (HPD, closed)
I
11/01/2016
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
02/05/2015
Violation issued (HPD, closed)
I
05/30/2004
Violation issued (HPD, closed)
B
04/30/2003
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAmerican Standard P&H Cororp09/29/2026
DOB NOWGeneral ConstructionPermit IssuedCube Build Groups09/24/2026
1 project · most recent 09/21/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/21/2026Permit IssuedCube Build GroupsHeating and Air Conditioning Systems
Heat / Cool
1 project · most recent 09/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/21/2026Permit IssuedAmerican Standard P&HGas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
09/21/2026Fire-Resistant Penetrations and JointsYuxuan Liuspecial
09/21/2026Energy Code Compliance InspectionsYuxuan Liuprogress
09/21/2026HVAC-R and service water heating equipmentYuxuan Liuenergy_progress
09/21/2026HVAC-R and service water piping design and insulationYuxuan Liuenergy_progress
09/21/2026Fire-Resistant Penetrations and JointsYuxuan Liuspecial
09/21/2026Mechanical SystemsYuxuan Liuspecial
09/21/2026Energy Code Compliance InspectionsYuxuan Liuprogress
09/21/2026Fire-Resistance Rated ConstructionYuxuan Liuprogress
09/21/2026FinalYuxuan Liuprogress
09/21/2026HVAC-R and service water heating equipmentYuxuan Liuenergy_progress
09/21/2026HVAC-R and service water heating system controlsYuxuan Liuenergy_progress
09/21/2026Fenestration air leakageYuxuan Liuenergy_progress
09/21/2026HVAC-R and service water piping design and insulationYuxuan Liuenergy_progress
09/21/2026Fenestration and door U-factor and product ratingsYuxuan Liuenergy_progress
09/21/2026Fenestration areasYuxuan Liuenergy_progress
09/21/2026Interior lighting powerYuxuan Liuenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
10/04/2026B01462804-S1Request digital key ↗
10/04/2026B01462804-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/26/2026B01462804-S1Open ↗
09/26/2026B01462804-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/26/2026B01462804-S1Open ↗
09/26/2026B01462804-I1Open ↗