💬 Discuss this project
1998Year Built
7Stories
P7Building Class
PARKZoning
1,360,264 sfGross Floor Area
1Units
LL97 Covered5 Active Violations 0 unresolved · 5 paperwork only ▸
Museum · Owner of record: NYC Department of Cultural Affairs · 738,000 sf lot · 1.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAmerican Museum of Natural History (amnh)1p · 3 filings · 11 docs
Floor 7American Museum of Natural History (amnh)2p · 1 filing · 3 docs
Floor 6American Museum of Natural History (amnh)1 filing · 6 docs
Floor 5American Museum of Natural History (amnh)1p · 2 filings · 9 docs
Floor 4Gilder Center, American Museum of Natural History (amnh)10p · 6 filings · 20 docs
Floor 3American Museum of Natural History (amnh), Gilder Center18p · 12 filings · 20 docs
Floor 2American Museum of Natural History (amnh)13p · 10 filings · 20 docs
Floor 1American Museum of Natural History (amnh), Gilder Center17p · 11 filings · 20 docs
CellarAnerura Museum1p · 2 filings · 12 docs
Sub-BasementAmerican Museum of Natural History (amnh)2p · 1 filing · 20 docs
Site & exteriorAmerican Museum of Natural History (amnh)28p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
American Museum of Natural History4807/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mbe Code Zoning5403/21/2026
A1 Expediting Service1603/21/2026
Sol Building Consulting Services203/21/2026
Dseny Engineering Services203/21/2026
Howard I Shapiro Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Safway AtlanticScaffold2307/08/2026
PJP InstallersScaffold1307/08/2026
Long Island ConcreteScaffold603/21/2026
Tishman InteriorsGeneral Contractor307/08/2026
E-J Electric Installation CoElectrical103/22/2026
Fresh Meadow Mechanicalspecialty_contractor107/08/2026
Pace PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service843712/28/2021
Building Lifecycle
All (228)Filed (42)Permit Issued (31)Signed Off (12)Violation (50)Inspection (3)Objection (66)Special Inspection (24)
06/04/2024
Signed off — Alteration
TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M00855603-I1
03/28/2024
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
03/25/2024
Objection resolved — Addressed
03/15/2024
Objection raised — Admin
03/14/2024
Filed — No Work
M00795205-P3
03/11/2024
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
02/07/2024
Filed — No Work
M00795205-P2
02/05/2024
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
10/27/2023
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER DWG DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE TO BE INSTALLED ON SW / RDWY. DOT PERMITS BY OTHERS
M00216351-I1
10/27/2023
Signed off — Alteration
PE-35 SHAFT HOIST; INSTALLATION OF SINGLE 5000 LBS CAPACITY MATERIAL ONLY HOIST DURING NB CONST, FILED SEPARATELY. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00589892-I1
10/03/2023
Signed off — Alteration
M00637206-I1
09/26/2023
Signed off — Alteration
Installation of temporary restrooms & office to be used during construction on the 1st, 3rd & 4th floors as per plans. Also, to remedy NYC Buildings summons number 35506096J. No change in use, egress or occupancy.
M00637289-I1
09/07/2023
Signed off — Alteration
SUPPORTED SCAFFOLD FOR ACCESS TO WORK
M00596181-I1
08/22/2023
Filed — No Work
M00920106-I1
07/12/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL BE INSTALLED ON RDWY. DOT PERMITS BY OTHERS
M00237690-I1
07/06/2023
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
06/26/2023
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
06/15/2023
Filed — No Work
M00692188-P1
06/15/2023
Filed — No Work
M08003611-P1
06/15/2023
Filed — No Work
M00692177-P1
05/01/2023
Filed — No Work
M00795205-P1
05/01/2023
Filed — No Work
M00692236-P1
04/28/2023
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
04/28/2023
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
04/28/2023
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
04/19/2023
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
04/19/2023
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
04/17/2023
Signed off — Alteration
M00605796-I1
04/14/2023
Filed — No Work
M00859120-I1
04/14/2023
Filed — No Work
M00859098-I1
04/14/2023
Filed — No Work
M00859113-I1
04/14/2023
Objection raised — Scope
04/14/2023
Objection resolved — Addressed
04/14/2023
Objection raised — Other
04/14/2023
Objection resolved — Addressed
04/14/2023
Objection raised — Other
04/14/2023
Objection resolved — Addressed
04/14/2023
Objection raised — Other
04/14/2023
Objection resolved — Addressed
04/14/2023
Objection raised — Other
04/14/2023
Objection resolved — Addressed
04/14/2023
Objection raised — Scope
04/14/2023
Objection resolved — Addressed
04/07/2023
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER DWG DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE TO BE INSTALLED ON SW / RDWY. DOT PERMITS BY OTHERS
M00216351-P3
04/06/2023
Filed — Alteration
TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M00855603-I1
04/06/2023
Permit issued — Protection and Mechanical Methods
M00855603-I1-PMM
03/30/2023
Signed off — Alteration
M00649024-I1
02/13/2023
Objection raised — Admin
02/13/2023
Objection resolved — Addressed
02/13/2023
Objection raised — Structural
02/13/2023
Objection resolved — Addressed
02/13/2023
Objection raised — Scope
02/13/2023
Objection resolved — Addressed
02/10/2023
Filed — No Work
M00823019-I1
02/10/2023
Filed — No Work
M00823095-I1
02/10/2023
Filed — No Work
M00823044-I1
02/10/2023
Filed — No Work
M00823032-I1
02/10/2023
Filed — No Work
M00822980-I1
02/10/2023
Filed — No Work
M00811358-I1
02/08/2023
Signed off — Alteration
INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION FILED SEPARATELY. HOISTS SHALL COMPLY WITH CH#33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY.
M00448302-I1
Latest 60 of 228 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offSafway Atlantic04/06/2023
DOB NOWProtection and Mechanical MethodsSigned-offPJP Installers12/27/2022
DOB NOWSupported ScaffoldSigned-offPJP Installers12/27/2022
DOB NOWConstruction FenceSigned-offSafway Atlantic10/05/2022
DOB NOWSidewalk ShedSigned-offSafway Atlantic10/05/2022
DOB NOWProtection and Mechanical MethodsSigned-offSafway Atlantic09/26/2022
DOB NOWBoiler EquipmentSigned-offS.J. Fuel Co05/31/2022
DOB NOWGeneral ConstructionSigned-offTishman Interiors05/10/2022
DOB NOWSupported ScaffoldSigned-offLong Island Concrete02/16/2022
DOB NOWSupported ScaffoldSigned-offLong Island Concrete02/15/2022
DOB NOWSupported ScaffoldSigned-offPJP Installers01/24/2022
DOB NOWProtection and Mechanical MethodsSigned-offPJP Installers01/24/2022
DOB NOWPlumbingSigned-offPace Plumbing01/07/2022
DOB NOWGeneral ConstructionSigned-offTishman Interiors12/29/2021
DOB NOWConstruction FenceSigned-offSafway Atlantic10/01/2021
DOB NOWSidewalk ShedSigned-offSafway Atlantic10/01/2021
DOB NOWSupported ScaffoldSigned-offPJP Installers09/24/2021
DOB NOWProtection and Mechanical MethodsSigned-offSafway Atlantic09/09/2021
DOB NOWSupported ScaffoldSigned-offLong Island Concrete08/17/2021
DOB NOWMechanical SystemsSigned-offFresh Meadow Mechanical08/11/2021
DOB NOWProtection and Mechanical MethodsSigned-offPJP Installers03/19/2021
DOB NOWProtection and Mechanical MethodsSigned-offPJP Installers01/28/2021
DOB NOWConstruction FenceSigned-offSafway Atlantic12/21/2020
DOB NOWSidewalk ShedSigned-offSafway Atlantic12/21/2020
DOB NOWConstruction FenceSigned-offSafway Atlantic09/21/2020
DOB NOWSidewalk ShedSigned-offSafway Atlantic09/21/2020
DOB NOWConstruction FenceSigned-offSafway Atlantic12/18/2019
DOB NOWSidewalk ShedSigned-offSafway Atlantic12/17/2019
DOB NOWSidewalk ShedSigned-offSafway Atlantic10/11/2019
DOB NOWConstruction FenceSigned-offSafway Atlantic09/23/2019
DOB NOWConstruction FenceSigned-offSafway Atlantic08/27/2019
BIS—ISSUEDTishman Construction09/27/2023
BIS—ISSUEDTishman Construction09/25/2023
BISEQISSUEDTishman Construction09/12/2023
BISPLISSUEDPace Plumbing01/20/2023
BIS—ISSUEDTishman Construction12/21/2022
BIS—ISSUEDTishman Construction09/27/2022
BISEQISSUEDTishman Construction09/27/2022
BIS—ISSUEDTishman Construction09/27/2022
BIS—ISSUEDTishman Construction08/18/2022
+ 24 more permits on file
5 projects · most recent 10/30/2023
General Wiring Lighting
FiledStatusContractorScope
10/30/2023CompleteE-J Electric Installation CoGeneral Wiring
07/05/2022CompleteE-J Electric Installation CoGeneral Wiring, Lighting
08/26/2021CancelledE-J Electric Installation CoGeneral Wiring
01/06/2021CompleteE-J Electric Installation Co—
10/09/2019CompleteStar-Delta Electric—
1 project · most recent 04/21/2021
Scaffold
FiledStatusContractorScope
04/21/2021——Scaffold
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/13/2022Pass-Final Boiler Equipment InspectionPassView ↗
09/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
03/28/2024Public Assembly Emergency LightingJOHN MCMONAGLEprogress
03/11/2024Public Assembly Emergency LightingJOHN MCMONAGLEprogress
02/05/2024Public Assembly Emergency LightingJOHN MCMONAGLEprogress
07/06/2023Public Assembly Emergency LightingJOHN MCMONAGLEprogress
06/26/2023Public Assembly Emergency LightingJOHN MCMONAGLEprogress
04/28/2023Public Assembly Emergency LightingJOHN MCMONAGLEprogress
04/28/2023Public Assembly Emergency LightingJOHN MCMONAGLEprogress
04/28/2023Public Assembly Emergency LightingJOHN MCMONAGLEprogress
04/19/2023Public Assembly Emergency LightingJOHN MCMONAGLEprogress
04/19/2023Public Assembly Emergency LightingJOHN MCMONAGLEprogress
01/28/2022Mechanical SystemsSTEPHEN WOODCHEKEspecial
01/28/2022High-Pressure Steam Piping (Welding)STEPHEN WOODCHEKEspecial
01/28/2022FinalSTEPHEN WOODCHEKEprogress
12/16/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsJOHN MCMONAGLEspecial
11/24/2021FinalSalvatore Croceprogress
11/24/2021Fire-Resistance Rated ConstructionSalvatore Croceprogress
10/18/2021Mechanical SystemsSTEPHEN WOODCHEKEspecial
10/18/2021High-Pressure Steam Piping (Welding)STEPHEN WOODCHEKEspecial
10/18/2021FinalSTEPHEN WOODCHEKEprogress
03/23/2021Post-installed AnchorsJOHN MCMONAGLEspecial
02/18/2021Post-installed AnchorsJOHN MCMONAGLEspecial
07/28/2020FinalSTEPHEN WOODCHEKEprogress
07/28/2020High-Pressure Steam Piping (Welding)STEPHEN WOODCHEKEspecial
07/28/2020Mechanical SystemsSTEPHEN WOODCHEKEspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
American Museum of Natural History (amnh)Arts / Culture / EntertainmentSub-basement, Floors 1–6, Roof
Project M00855603 Alteration · LOC Issued · 04/06/2023
Project M00728264 Alteration · Objections · 06/12/2022
Project M00702482 Alteration · LL 158-2017-Denied · 03/29/2022
Project M00605796 Alteration · LOC Issued · 11/16/2021
Project M00596181 Alteration · LOC Issued · 09/23/2021
Project M00589892 Alteration · LOC Issued · 09/08/2021
Project M00489315 Alteration · LOC Issued · 06/28/2021
Project M00469535 Alteration · QA Failed · 04/21/2021
Project M00448302 Alteration · LOC Issued · 01/27/2021
Project M00361546 Alteration · LOC Issued · 07/27/2020
Project M00237690 Alteration · LOC Issued · 10/10/2019
Project M00216351 Alteration · LOC Issued · 08/26/2019
Anerura MuseumArts / Culture / EntertainmentCellar
Project M00649024 Alteration · LOC Issued · 12/22/2021
Gilder CenterArts / Culture / EntertainmentFloors 1, 3, 4
Project M00637206 Alteration · LOC Issued · 12/14/2021
Project M00637289 Alteration · LOC Issued · 12/14/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 539 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch - Place of Assembly12
09/01/2026M00692236-P1Request digital key ↗
09/01/2026M08003611-P1Request digital key ↗
09/01/2026M08003611-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch10
09/03/2026M00589892-I1Request digital key ↗
09/03/2026M00596181-I1Request digital key ↗
09/03/2026M00605796-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly10
08/31/2026M00811358-I1Request digital key ↗
08/31/2026M00823032-I1Request digital key ↗
08/31/2026M00822980-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence4
09/05/2026M00216351-P1Request digital key ↗
09/05/2026M00216351-I1Request digital key ↗
09/05/2026M00216351-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/04/2026M00361546-I1Request digital key ↗
08/15/2026M00361546-P1Request digital key ↗
08/15/2026M00361546-P3Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00237690-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/03/2026M00469535-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Protection of Mechanical Methods1
09/04/2026M00448302-I1Request digital key ↗
▸Applications & Permits92
▸BISPLAN / WORK APPROVAL APPLICATION56
12/21/2023121204017Open ↗
11/20/2023140994707Open ↗
11/14/2023121204017Open ↗
Showing 3 of 56 on file for this type
▸BISWORK PERMIT APPLICATION25
09/26/2023121204017Open ↗
09/19/2023121204017Open ↗
12/21/2022121204017Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWLPC Approval/Permit6
09/04/2026M00361546-I1Open ↗
09/04/2026M00361546-P1Open ↗
08/15/2026M00637289-I1Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation5
03/04/2024140748350Open ↗
07/26/2023140748350Open ↗
Showing 2 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
02/25/2022121204017Open ↗
▸Seals & Professional Certifications77
▸DOB NOWDPL-1: Design Professional Seal & Signature42
09/05/2026M00216351-I1Open ↗
09/05/2026M00237690-I1Open ↗
09/04/2026M00361546-I1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
10/03/2026M00692236-P1Open ↗
09/23/2026M00795205-P2Open ↗
09/02/2026M08003611-P1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026M00649024-I1Open ↗
09/02/2026M00361546-P1Open ↗
08/31/2026M00469535-I1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment46
▸BISEQUIPMENT USE PERMITS17
04/04/2023121204017Open ↗
04/04/2023121204017Open ↗
04/04/2023121204017Open ↗
Showing 3 of 17 on file for this type
▸BISSCHEDULE B - PLUMBING13
11/14/2023121204017Open ↗
08/17/2023121204017Open ↗
08/08/2023140830821Open ↗
Showing 3 of 13 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
04/04/2023121204017Open ↗
04/04/2023121204017Open ↗
04/04/2023121204017Open ↗
Showing 3 of 4 on file for this type
▸BISSTANDPIPE SYSTEMS3
02/14/2023123862873Open ↗
02/06/2023140830821Open ↗
02/06/2023140830821Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA3
06/04/2024121204017Open ↗
01/17/2024123806195Open ↗
Showing 2 of 3 on file for this type
▸BISSPRINKLER SYSTEMS2
02/06/2023140830821Open ↗
02/06/2023140830821Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/17/2023121204017Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
01/29/2024121204017Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
02/17/2023121204017Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/04/2026M00361546-P1Open ↗
09/04/2026M00361546-I1Open ↗
08/13/2026M00361546-P3Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* DUCT LEAKAGE TESTING1
02/17/2023121204017Open ↗
▸BISNYCECC EXEMPTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/17/2023121204017Open ↗
▸BISFENESTRATION AREAS1
02/17/2023121204017Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/20/2024121204017Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/17/2023121204017Open ↗
▸Inspections & Test Reports35
▸BISTECHNICAL REPORT: RESPONSIBILITY17
01/12/2023123862873Open ↗
01/12/2023123862873Open ↗
08/10/2021121204017Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX7
08/13/2021121204017Open ↗
Showing 1 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
02/07/2023121204017Open ↗
02/07/2023121204017Open ↗
Showing 2 of 3 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/15/2022121204017Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/29/2023121204017Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/29/2023121204017Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/11/2022121204017Open ↗
▸BISPOST-INSTALLED ANCHORS1
03/11/2022121204017Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/11/2022121204017Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
11/17/2022121204017Open ↗
▸Approvals, Objections & Sign-offs89
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter37
09/05/2026M00237690-I1Open ↗
09/04/2026M00361546-I1Open ↗
09/04/2026M00361546-P1Open ↗
Showing 3 of 37 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE14
11/13/2023121204017Open ↗
11/06/2023121204017Open ↗
04/26/2023121204017Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
02/07/2023121204017Open ↗
12/09/2022121204017Open ↗
12/09/2022121204017Open ↗
Showing 3 of 10 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION6
11/18/2021123862873Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)5
09/05/2026M00216351-I1Open ↗
09/05/2026M00216351-P2Open ↗
09/05/2026M00237690-I1Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
01/26/2024123806195Open ↗
12/14/2023140994707Open ↗
12/07/2023140830821Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER4
07/01/2021121204017Open ↗
07/01/2021121204017Open ↗
Showing 2 of 4 on file for this type
▸BISLANDMARKS SIGNOFF3
06/14/2024121204017Open ↗
03/04/2024140748350Open ↗
12/14/2023140994707Open ↗
▸BISLANDMARKS APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
09/03/2026M00469535-I1Open ↗
08/15/2026M00637289-I1Open ↗
▸BISOTCR APPROVAL1
03/29/2023121204017Open ↗
▸BISFINAL1
12/14/2023140994707Open ↗
▸Cost, Insurance & Ownership11
▸BISPROJECT-SPECIFIC GL INSURANCE5
09/26/2023121204017Open ↗
09/19/2023121204017Open ↗
12/21/2022121204017Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT4
01/12/2023123862873Open ↗
Showing 1 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/26/2024123806195Open ↗
12/07/2023140830821Open ↗
▸Filing & Intake Forms57
▸BISADDITIONAL INFORMATION35
02/01/2024121204017Open ↗
12/04/2023140830821Open ↗
11/15/2023121204017Open ↗
Showing 3 of 35 on file for this type
▸BISBOROUGH INTAKE FORM12
08/19/2022121204017Open ↗
01/04/2022121204017Open ↗
01/03/2022121204017Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
02/01/2022121204017Open ↗
Showing 1 of 12 on file for this type
▸DOB NOWProof of Historic Building3
08/15/2026M00637289-I1Open ↗
08/13/2026M00637206-I1Open ↗
08/13/2026M00649024-I1Open ↗
▸BISSupporting Document: Fee Exempt2
11/20/2023140994707Open ↗
09/26/2023121204017Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/04/2024140748350Open ↗
▸BISVESTIBULES1
02/17/2023121204017Open ↗
▸BISMAINTENANCE INFORMATION1
02/17/2023121204017Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
03/04/2024140748350Open ↗
▸DOB NOWPro Cert Restriction Exception (LL158/17)1
09/02/2026M00702482-I1Open ↗