← Back
Primarily 2 family with 1 store or office
415 KNICKERBOCKER AVENUE
BROOKLYN · BIN 3074799
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
C4-3Zoning
5,400 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 415 KNICKERBOCKER INC. · 2,500 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingGeneralOther
Roof4p · 2 filings · 14 docs
Bulkhead1p · 1 filing · 3 docs
Floor 31 filing
Floor 21p · 2 filings · 3 docs
Floor 11p · 1 filing · 3 docs
Cellar1p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
6 MURRAY3707/08/2026
415 KNCIKERBOCKER INC103/22/2026
OWNER OF 415 KNICKERBOCKE203/22/2026
13 SOUTH FOURTH503/21/2026
J&J PITKIN AVENUE REALTY LLC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB201/17/2025
FREEFORM DEFORM LLC801/04/2023
KCE CONSULTING ENGINEERING PLLC104/28/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FREEFORM DEFORM1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOLDEN SAW CONSTRUCTION CGeneral Contractor603/21/2026
SHEFF HVAC INCGeneral Contractor303/21/2026
ALJER PLBG & HTG CORPPlumbing107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
CAPE PLUMBING INCPlumbing107/08/2026
TRIPLE CROWN PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MCHENERY TESTING LAB9181301/17/2025
Building Lifecycle
All (48)Filed (11)Permit Issued (8)Signed Off (1)Violation (11)Inspection (8)Special Inspection (9)
04/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/05/2026
Violation issued (FDNY_NOV, closed)
03/05/2026
Violation issued (FDNY_NOV, closed)
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/22/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/14/2025
Permit issued — Plumbing
B01163502-I1-PL
02/10/2025
Permit issued — Mechanical Systems
B01163492-I1-MS
01/17/2025
Filed — Alteration
B01163492-I1
01/17/2025
Filed — Alteration
HEREWITH FILING TO INSTALL NEW HVAC UNIT ON EXISTING DUNNAGE BEAM @ ROOF. NO CHANGE OF USE, EGRESS OR OCCUPANCY THIS APPLICATION.
B01163502-I1
01/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TREVOR O. FLOWERS
01/07/2025
Special inspection requirement — Mechanical Systems
TREVOR O. FLOWERS
01/07/2025
Special inspection requirement — Energy Code Compliance Inspections
TREVOR O. FLOWERS
01/07/2025
Special inspection requirement — Final
TREVOR O. FLOWERS
01/07/2025
Special inspection requirement — Ventilation and air distribution system
TREVOR O. FLOWERS
01/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
TREVOR O. FLOWERS
01/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
TREVOR O. FLOWERS
01/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
TREVOR O. FLOWERS
09/06/2024
Violation issued (FDNY_NOV, closed)
01/24/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/05/2023
Signed off — Alteration
Replacing wood siding on front facade with stucco.
B00646312-I1
01/04/2023
Filed — Alteration
new ADA bathroom and non residential sinks and floor drains.
B00581979-P2
10/03/2022
Filed — Alteration
Replacing wood siding on front facade with stucco.
B00646312-S1
09/22/2022
Special inspection requirement — Final
Paul Jennings
08/01/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/21/2022
Filed — Alteration
new ADA bathroom and non residential sinks and floor drains.
B00581979-P1
07/07/2022
Permit issued — General Construction
B00646312-I1-GC
07/05/2022
Permit issued — Plumbing
B00581979-I1-PL
06/27/2022
Permit issued — General Construction
B00646312-I1-GC
06/23/2022
Permit issued — General Construction
B00646312-I1-GC
12/20/2021
Filed — Alteration
Replacing wood siding on front facade with stucco.
B00646312-I1
12/08/2021
Filed — Alteration
new ADA bathroom and non residential sinks and floor drains.
B00581979-I1
06/30/2021
Permit issued — Plumbing
B28872841-I1-PL
09/09/2020
Filed — Alteration
Installation of New Bathroom and Kitchen fixtures
B00341421-P2
08/05/2020
Filed — Alteration
Installation of New Bathroom and Kitchen fixtures
B00341421-P1
06/16/2020
Permit issued — Plumbing
B00341421-I1-PL
05/29/2020
Filed — Alteration
Installation of New Bathroom and Kitchen fixtures
B00341421-I1
05/01/2020
Violation issued (ECB, closed)
Construction
04/28/2020
Filed — Alteration
B00341084-I1
02/15/2018
Violation issued (FDNY_NOV, closed)
02/11/2017
Violation issued (FDNY_NOV, closed)
04/07/2010
Violation issued (FDNY_NOV, closed)
05/09/2002
Violation issued (ECB, closed)
Construction
05/09/2002
Violation issued (ECB, closed)
Construction
05/08/2002
Violation issued (ECB, closed)
Construction
10/12/1995
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCAPE PLUMBING INC02/14/2025
DOB NOWMechanical SystemsPermit IssuedSHEFF HVAC INC02/10/2025
DOB NOWGeneral ConstructionSigned-offGOLDEN SAW CONSTRUCTION C07/07/2022
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC07/05/2022
DOB NOWGeneral ConstructionSigned-offGOLDEN SAW CONSTRUCTION C06/27/2022
DOB NOWGeneral ConstructionSigned-offGOLDEN SAW CONSTRUCTION C06/23/2022
DOB NOWPlumbingPermit IssuedALJER PLBG & HTG CORP06/30/2021
DOB NOWPlumbingSigned-offTRIPLE CROWN PLBG&HTG INC06/16/2020
BISOTRE-ISSUEDXINLI.CONSTRUCTION LLC03/09/2020
BISOTISSUEDPREFERRED HOUSING CORP11/21/2002
3 projects · most recent 01/17/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/17/2025Permit IssuedCAPE PLUMBING INCGas
01/04/2023Signed-offALL PRO PLBG & HTG INCGas, Water/Sanitary
09/09/2020Signed-offTRIPLE CROWN PLBG&HTG INCWater/Sanitary
3 projects · most recent 07/06/2022
General Wiring
FiledStatusContractorScope
07/06/2022CompleteL J ELEC'L SERV. INC.General Wiring
06/29/2021Permit IssuedL J ELEC'L SERV. INC.General Wiring
01/08/2021Permit IssuedROBERT CHIMENTIGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/22/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/24/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/01/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/01/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/07/2025Fire-Resistant Penetrations and JointsTREVOR O. FLOWERSspecial
01/07/2025Mechanical SystemsTREVOR O. FLOWERSspecial
01/07/2025Energy Code Compliance InspectionsTREVOR O. FLOWERSprogress
01/07/2025FinalTREVOR O. FLOWERSprogress
01/07/2025Ventilation and air distribution systemTREVOR O. FLOWERSenergy_progress
01/07/2025HVAC-R and service water heating equipmentTREVOR O. FLOWERSenergy_progress
01/07/2025HVAC-R and service water heating system controlsTREVOR O. FLOWERSenergy_progress
01/07/2025HVAC-R and service water piping design and insulationTREVOR O. FLOWERSenergy_progress
09/22/2022FinalPaul Jenningsprogress
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch7
08/31/2026B00581979-P2Request digital key ↗
08/31/2026B00581979-P1Request digital key ↗
08/31/2026B00581979-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00341421-I1Request digital key ↗
08/15/2026B00341421-P2Request digital key ↗
08/15/2026B00341421-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00341084-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION6
06/23/2022322029906Open ↗
06/13/2022322029906Open ↗
05/18/2022322029906Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION1
03/17/2020322029906Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/31/2026B00581979-P2Open ↗
08/31/2026B00581979-P1Open ↗
08/31/2026B00581979-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/05/2026B01163492-I1Open ↗
09/05/2026B01163492-I1Open ↗
09/05/2026B01163492-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/17/2020322029906Open ↗
09/07/2018321833441Open ↗
09/07/2018321833441Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/05/2026B01163492-I1Open ↗
09/05/2026B01163492-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/17/2020322029906Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/17/2020322029906Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/07/2018321833441Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
09/07/2018321833441Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/31/2026B00581979-I1Open ↗
08/31/2026B00581979-P2Open ↗
08/31/2026B00581979-P1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/17/2020322029906Open ↗
09/07/2018321833441Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/17/2020322029906Open ↗
09/07/2018321833441Open ↗
09/07/2018321833441Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/17/2020322029906Open ↗
09/07/2018321833441Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
06/23/2022322029906Open ↗
05/18/2022322029906Open ↗
10/25/2018321833441Open ↗
▸BISEFILING COVER SHEET2
01/17/2020322029906Open ↗
09/07/2018321833441Open ↗