← Back
Primarily 4 family with 1 store or office
415 ONDERDONK AVENUE
QUEENS · Ridgewood · BIN 4081238
💬 Discuss this project
1930Year Built
3Stories
S4Building Class
R6BZoning
5,900 sfGross Floor Area
5Units
Rent Stabilized18 Open Violations 17 unresolved · 1 paperwork only ▸
Primarily 4 family with 1 store or office · Owner of record: SENECA PARTNERS LLC · 2,563 sf lot · 2.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Floor 313p · 4 filings · 20 docs
Floor 213p · 4 filings · 20 docs
Floor 118p · 3 filings · 20 docs
Cellar27p · 3 filings · 20 docs
Site & exterior27p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SENECA PARTNERS5207/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMCON GROUP INCGeneral Contractor303/21/2026
NEPTUNE MECHANICAL INCGeneral Contractor307/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor207/08/2026
PASSEGGIO PLBG & HTG CORP.Plumbing207/08/2026
SERVE WELL P & H INCFire Protection107/08/2026
PASSEGGI'S PLUMBING & HEAGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DIPROPERZIO & MALLIA, LLP7517110/11/2022
PSI AGENCY INC.254708/18/2022
Building Lifecycle
All (129)Filed (17)Permit Issued (9)Signed Off (6)Violation (56)Inspection (13)Special Inspection (28)
05/07/2026
Violation issued (HPD, open)
A
04/02/2026
Signed off — Alteration
Plumbing and gas in association with application Q00621545. Replacement of fixtures.
Q00623249-I1
11/21/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/01/2025
Violation issued (ECB, open)
Boilers
06/12/2025
Violation issued (HPD, open)
A
01/07/2025
Signed off — Alteration
Removal of existing partitions and toilet to create new office space with accessible toilets and handicap entrance.
Q07997962-I1
01/07/2025
Signed off — Alteration
Removal of existing partitions and toilet to create new office space with accessible toilets and handicap entrance.
Q07997962-S1
12/02/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/16/2024
Violation issued (HPD, open)
A
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/29/2023
Violation issued (HPD, closed)
A
03/17/2023
Filed — Alteration
Removal of existing partitions and toilet to create new office space with accessible toilets and handicap entrance.
Q07997962-P2
03/03/2023
Filed — Alteration
Removal of existing partitions and toilet to create new office space with accessible toilets and handicap entrance.
Q07997962-P1
02/28/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/30/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/30/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/03/2023
Signed off — Alteration
HEREWITH FILING FOR HYDRAULICALLY CALCULATED SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED IN CONJUNCTION WITH ALT TYPE 1, DOB NOW # Q00526923.
Q00560865-I1
12/27/2022
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
12/21/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/20/2022
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
11/16/2022
Violation issued (HPD, closed)
I
11/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/09/2022
Permit issued — Plumbing
Q07997962-S1-PL
11/02/2022
Filed — Alteration
Removal of existing partitions and toilet to create new office space with accessible toilets and handicap entrance.
Q07997962-S1
10/14/2022
Permit issued — General Construction
Q07997962-I1-GC
10/11/2022
Filed — Alteration
Removal of existing partitions and toilet to create new office space with accessible toilets and handicap entrance.
Q07997962-I1
09/02/2022
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
09/02/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Michael Mallia
09/02/2022
Special inspection requirement — Interior lighting power
Michael Mallia
09/02/2022
Special inspection requirement — Insulation placement and R values
Michael Mallia
09/02/2022
Special inspection requirement — Lighting controls
Michael Mallia
09/02/2022
Special inspection requirement — Fenestration air leakage
Michael Mallia
09/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Mallia
09/02/2022
Special inspection requirement — Energy Code Compliance Inspections
Michael Mallia
09/02/2022
Special inspection requirement — Fire-Resistance Rated Construction
Michael Mallia
09/02/2022
Special inspection requirement — Final
Michael Mallia
08/30/2022
Signed off — Alteration
Reconfiguration of interior partitions, bathroom and kitchen in each of the existing four dwelling units. New windows and exterior EFIS siding.
Q00621545-I1
08/18/2022
Filed — Alteration
HEREWITH FILING FOR HYDRAULICALLY CALCULATED SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED IN CONJUNCTION WITH ALT TYPE 1, DOB NOW # Q00526923.
Q00560865-P2
08/17/2022
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
08/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
08/03/2022
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
07/18/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/13/2022
Signed off — Alteration
Q00566500-I1
06/03/2022
Violation issued (ECB, closed)
Site Safety
06/03/2022
Violation issued (ECB, closed)
Unknown
06/03/2022
Violation issued (ECB, closed)
Construction
05/26/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/16/2022
Filed — Alteration
Reconfiguration of interior partitions, bathroom and kitchen in each of the existing four dwelling units. New windows and exterior EFIS siding.
Q00621545-P2
05/16/2022
Special inspection requirement — Fenestration air leakage
Michael Mallia
05/16/2022
Special inspection requirement — Lighting in dwelling units
Michael Mallia
05/16/2022
Special inspection requirement — Insulation placement and R values
Michael Mallia
05/16/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Michael Mallia
05/16/2022
Special inspection requirement — Interior lighting power
Michael Mallia
05/16/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
MAURICIO ANDRADE
05/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
05/16/2022
Special inspection requirement — Masonry
MAURICIO ANDRADE
05/16/2022
Special inspection requirement — Structural Cold-Formed Steel
MAURICIO ANDRADE
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSAFEWAY PLUMBING & HEATIN11/09/2022
DOB NOWGeneral ConstructionSigned-offEMCON GROUP INC10/14/2022
DOB NOWMechanical SystemsSigned-offPASSEGGI'S PLUMBING & HEA02/14/2022
DOB NOWSprinklersSigned-offSERVE WELL P & H INC12/29/2021
DOB NOWPlumbingSigned-offSAFEWAY PLUMBING & HEATIN11/12/2021
DOB NOWGeneral ConstructionSigned-offNEPTUNE MECHANICAL INC11/10/2021
DOB NOWStructuralSigned-offNEPTUNE MECHANICAL INC11/10/2021
DOB NOWSupported ScaffoldPermit IssuedTRI BOROUGH SCAFFOLDING11/05/2021
DOB NOWSidewalk ShedPermit IssuedTRI BOROUGH SCAFFOLDING08/31/2021
BISOTISSUEDNORDEST SERVICES LLC01/21/2021
BISBLISSUEDKEW FOREST PLBG & HTG INC05/30/2003
BISPLISSUEDKEW FOREST PLBG & HTG INC05/30/2003
3 projects · most recent 03/18/2025
General Wiring
FiledStatusContractorScope
03/18/2025CompleteNASH ELECTRIC SERVICES IN—
02/25/2025Permit IssuedNORTHEAST ELECTRICAL CONTRACTINGGeneral Wiring
08/26/2021CompleteV. VASS ELECTRIC CORP—
2 projects · most recent 04/14/2022
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/14/2022Permit IssuedTRI BOROUGH SCAFFOLDING.&Scaffold
04/13/2022Permit IssuedTRI BOROUGH SCAFFOLDING.&Sidewalk Shed
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
02/28/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/27/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
12/21/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/20/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
11/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/02/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/03/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/18/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/26/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
09/02/2022Fenestration and door U-factor and product ratingsMichael Malliaenergy_progress
09/02/2022Interior lighting powerMichael Malliaenergy_progress
09/02/2022Insulation placement and R valuesMichael Malliaenergy_progress
09/02/2022Lighting controlsMichael Malliaenergy_progress
09/02/2022Fenestration air leakageMichael Malliaenergy_progress
09/02/2022Fire-Resistant Penetrations and JointsMichael Malliaspecial
09/02/2022Energy Code Compliance InspectionsMichael Malliaprogress
09/02/2022Fire-Resistance Rated ConstructionMichael Malliaprogress
09/02/2022FinalMichael Malliaprogress
08/17/2022Sprinkler SystemsMAURICIO ANDRADEspecial
08/17/2022Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/16/2022Fenestration air leakageMichael Malliaenergy_progress
05/16/2022Lighting in dwelling unitsMichael Malliaenergy_progress
05/16/2022Insulation placement and R valuesMichael Malliaenergy_progress
05/16/2022Fenestration and door U-factor and product ratingsMichael Malliaenergy_progress
05/16/2022Interior lighting powerMichael Malliaenergy_progress
05/16/2022Exterior Insulation and Finish Systems (EIFS)MAURICIO ANDRADEspecial
05/16/2022Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/16/2022MasonryMAURICIO ANDRADEspecial
05/16/2022Structural Cold-Formed SteelMAURICIO ANDRADEspecial
05/16/2022Structural Steel - DetailsMAURICIO ANDRADEspecial
05/16/2022Structural Steel - WeldingMAURICIO ANDRADEspecial
05/16/2022Energy Code Compliance InspectionsMichael Malliaprogress
05/16/2022FinalMichael Malliaprogress
05/16/2022Fire-Resistance Rated ConstructionMichael Malliaprogress
Latest 25 of 28.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/26/2026Q00566500-I1Request digital key ↗
08/26/2026Q00560865-I1Request digital key ↗
08/26/2026Q00560865-P2Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/02/2020440651527Open ↗
▸BISWORK PERMIT APPLICATION1
01/21/2021440651527Open ↗
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/26/2026Q00623249-I1Open ↗
08/26/2026Q00621545-P2Open ↗
08/26/2026Q00621545-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
08/31/2026Q00621545-P2Open ↗
08/31/2026Q00621545-P2Open ↗
08/31/2026Q00621545-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026Q00621545-P2Open ↗
08/31/2026Q00621545-P2Open ↗
08/31/2026Q00621545-P2Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/02/2020440651527Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/02/2020440651527Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/02/2020440651527Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
12/02/2020440651527Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/26/2026Q00623249-I1Open ↗
08/26/2026Q00621545-P1Open ↗
08/26/2026Q00621545-P2Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/02/2020440651527Open ↗
▸Energy Compliance6
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00566500-I1Open ↗
08/13/2026Q00621545-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/02/2020440651527Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/18/2021440651527Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/02/2020440651527Open ↗
▸BISNYCECC ANALYSIS1
12/02/2020440651527Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/02/2020440651527Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/12/2022440651527Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/18/2021440651527Open ↗
12/02/2020440651527Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/02/2020440651527Open ↗