1925Year Built
2Stories
A1Building Class
R3AZoning
1,231 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/19/2021$600K—415 QUINCY LLC → Private party$487/sf building
03/16/2021$385K—— → —$313/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHANDA ENGINEERING CONSULTANT PC610/10/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL PRO PLBG & HTG INCPlumbing607/08/2026
DAVID CONSTRUCTING NY, INGeneral Contractor407/08/2026
A.C. MORGAN ELECTRICElectrical203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHANDA ENG. CONSULTANT PC6842510/10/2023
Building Lifecycle
All (50)Filed (6)Permit Issued (3)Signed Off (3)Inspection (7)Objection (10)Special Inspection (21)
01/08/2024
Signed off — Alteration
Rear side horizontal extension cellar, 1st & 2nd floor. Install one stand shower in cellar. Install laundry washer, dryer and sink in cellar. Relocate existing kitchen & bathroom in 1st & 2nd floor. Install new 3-fixture bathroom at 1st floor.
X00707967-I1
10/18/2023
Signed off — Alteration
Rear side horizontal extension cellar, 1st & 2nd floor. Install one stand shower in cellar. Install laundry washer, dryer and sink in cellar. Relocate existing kitchen & bathroom in 1st & 2nd floor. Install new 3-fixture bathroom at 1st floor.
X00707967-S1
10/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
10/10/2023
Filed — Alteration
Rear side horizontal extension cellar, 1st & 2nd floor. Install one stand shower in cellar. Install laundry washer, dryer and sink in cellar. Relocate existing kitchen & bathroom in 1st & 2nd floor. Install new 3-fixture bathroom at 1st floor.
X00707967-P3
10/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
08/08/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/01/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/24/2023
Special inspection requirement — Concrete - Cast-In-Place
KARTIK CHANDA
07/24/2023
Special inspection requirement — Final
KARTIK CHANDA
07/24/2023
Special inspection requirement — Lowest Floor Elevation
KARTIK CHANDA
07/24/2023
Special inspection requirement — Footing and Foundation
KARTIK CHANDA
07/24/2023
Special inspection requirement — Air barrier - visual inspection
KARTIK CHANDA
07/24/2023
Special inspection requirement — Insulation placement and R values
KARTIK CHANDA
07/24/2023
Special inspection requirement — Interior lighting power
KARTIK CHANDA
07/24/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
KARTIK CHANDA
07/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
07/22/2023
Filed — Alteration
Rear side horizontal extension cellar, 1st & 2nd floor. Install one stand shower in cellar. Install laundry washer, dryer and sink in cellar. Relocate existing kitchen & bathroom in 1st & 2nd floor. Install new 3-fixture bathroom at 1st floor.
X00707967-P2
07/22/2023
Special inspection requirement — Air barrier - visual inspection
KARTIK CHANDA
07/22/2023
Special inspection requirement — Concrete - Cast-In-Place
KARTIK CHANDA
07/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
07/22/2023
Special inspection requirement — Final
KARTIK CHANDA
07/22/2023
Special inspection requirement — Footing and Foundation
KARTIK CHANDA
07/22/2023
Special inspection requirement — Lowest Floor Elevation
07/22/2023
Special inspection requirement — Insulation placement and R values
KARTIK CHANDA
07/22/2023
Special inspection requirement — Interior lighting power
KARTIK CHANDA
07/22/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
KARTIK CHANDA
07/21/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
05/15/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/06/2023
Filed — Alteration
Rear side horizontal extension cellar, 1st & 2nd floor. Install one stand shower in cellar. Install laundry washer, dryer and sink in cellar. Relocate existing kitchen & bathroom in 1st & 2nd floor. Install new 3-fixture bathroom at 1st floor.
X00707967-P1
05/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
02/11/2023
Signed off — Alteration
X00762895-I1
01/09/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/09/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/13/2022
Permit issued — Plumbing
X00707967-S1-PL
08/11/2022
Permit issued — Foundation
X00707967-I1-GC-CX
07/21/2022
Permit issued — Construction Fence
X00762895-I1-FN
07/08/2022
Objection raised — Cost
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Admin
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Admin
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Admin
07/08/2022
Objection resolved — Addressed
07/08/2022
Objection raised — Energy
07/08/2022
Objection resolved — Addressed
07/02/2022
Filed — Alteration
Rear side horizontal extension cellar, 1st & 2nd floor. Install one stand shower in cellar. Install laundry washer, dryer and sink in cellar. Relocate existing kitchen & bathroom in 1st & 2nd floor. Install new 3-fixture bathroom at 1st floor.
X00707967-S1
06/22/2022
Filed — Alteration
X00762895-I1
04/01/2022
Filed — Alteration
Rear side horizontal extension cellar, 1st & 2nd floor. Install one stand shower in cellar. Install laundry washer, dryer and sink in cellar. Relocate existing kitchen & bathroom in 1st & 2nd floor. Install new 3-fixture bathroom at 1st floor.
X00707967-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC10/13/2022
DOB NOWFoundationSigned-offDAVID CONSTRUCTING NY, IN08/11/2022
DOB NOWConstruction FenceSigned-offDAVID CONSTRUCTING NY, IN07/21/2022
BISOTISSUEDCENTURION SOLAR ENERGY09/16/2022
2 projects · most recent 07/06/2023
General Wiring
FiledStatusContractorScope
07/06/2023CompleteA.C. MORGAN ELECTRICGeneral Wiring
09/30/2022CompleteBERGER QUALITY ELEC'L CON—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/08/2023Pass-Final General Construction Non-Directive 14PassView ↗
08/01/2023Fail-Final General Construction Non-Directive 14FailView ↗
07/21/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
05/15/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/09/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/09/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
10/11/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
10/10/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
07/24/2023Concrete - Cast-In-PlaceKARTIK CHANDAspecial
07/24/2023FinalKARTIK CHANDAprogress
07/24/2023Lowest Floor ElevationKARTIK CHANDAprogress
07/24/2023Footing and FoundationKARTIK CHANDAprogress
07/24/2023Air barrier - visual inspectionKARTIK CHANDAenergy_progress
07/24/2023Insulation placement and R valuesKARTIK CHANDAenergy_progress
07/24/2023Interior lighting powerKARTIK CHANDAenergy_progress
07/24/2023Fenestration and door U-factor and product ratingsKARTIK CHANDAenergy_progress
07/24/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
07/22/2023Air barrier - visual inspectionKARTIK CHANDAenergy_progress
07/22/2023Concrete - Cast-In-PlaceKARTIK CHANDAspecial
07/22/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
07/22/2023FinalKARTIK CHANDAprogress
07/22/2023Footing and FoundationKARTIK CHANDAprogress
07/22/2023Lowest Floor Elevation—progress
07/22/2023Insulation placement and R valuesKARTIK CHANDAenergy_progress
07/22/2023Interior lighting powerKARTIK CHANDAenergy_progress
07/22/2023Fenestration and door U-factor and product ratingsKARTIK CHANDAenergy_progress
05/06/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026X00707967-P3Request digital key ↗
08/24/2026X00707967-P2Request digital key ↗
08/24/2026X00707967-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/14/2022240336329Open ↗
▸BISWORK PERMIT APPLICATION1
09/16/2022240336329Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWRestrictive Declaration/Easement 13
08/24/2026X00707967-P1Open ↗
08/15/2026X00707967-S1Open ↗
08/13/2026X00707967-P3Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/24/2026X00707967-I1Open ↗
08/13/2026X00707967-P2Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
09/14/2022240336329Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature13
08/31/2026X00707967-P2Open ↗
08/31/2026X00707967-P2Open ↗
08/31/2026X00707967-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026X00707967-P3Open ↗
08/31/2026X00707967-P2Open ↗
08/31/2026X00707967-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026X00707967-I1Open ↗
08/24/2026X00707967-P1Open ↗
08/24/2026X00707967-S1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/14/2022240336329Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/14/2022240336329Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/14/2022240336329Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
09/14/2022240336329Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026X00707967-P1Open ↗
08/24/2026X00707967-I1Open ↗
08/15/2026X00707967-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/14/2022240336329Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/18/2023240336329Open ↗
09/14/2022240336329Open ↗
09/14/2022240336329Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/14/2022240336329Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/18/2023240336329Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/14/2022240336329Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
01/18/2023240336329Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00707967-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/18/2023240336329Open ↗
01/18/2023240336329Open ↗
09/14/2022240336329Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/20/2023240336329Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/18/2023240336329Open ↗
09/14/2022240336329Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/14/2022240336329Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/24/2026X00707967-I1Open ↗
08/13/2026X00707967-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/24/2026X00707967-I1Open ↗
08/13/2026X00707967-P2Open ↗
▸DOB NOWPlot Diagram2
08/24/2026X00707967-I1Open ↗
08/13/2026X00707967-P2Open ↗
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
09/14/2022240336329Open ↗
▸BISTax Abatement Miscellaneous1
01/20/2023240336329Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/14/2022240336329Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00707967-I1Open ↗