← Back
Primarily 3 family with 1 store or office
416 BAY RIDGE AVENUE
BROOKLYN · Bay Ridge · BIN 3145730
💬 Discuss this project
1931Year Built
3Stories
S3Building Class
R5BZoning
3,300 sfGross Floor Area
4Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: BAY RIDGE ONE LLC · 1,928 sf lot · 1.71 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Cellar5p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BASIC GROUPS CORP1103/22/2026
BAY RIDGE ONE LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/25/2021$998K—Private party → BAY RIDGE ONE LLC$302/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASIC GROUPS CORP309/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIPESTYLISTS, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY ACOM ENGINEERING PLLC7061309/03/2021
Building Lifecycle
All (31)Filed (3)Permit Issued (2)Signed Off (2)Violation (19)Inspection (5)
08/08/2026
Violation issued (HPD, open)
A
08/08/2026
Violation issued (HPD, open)
A
08/08/2026
Violation issued (HPD, open)
A
08/08/2026
Violation issued (HPD, open)
A
08/08/2026
Violation issued (HPD, open)
A
08/08/2026
Violation issued (HPD, open)
A
08/08/2026
Violation issued (HPD, open)
C
08/08/2026
Violation issued (HPD, open)
A
05/29/2026
Violation issued (HPD, closed)
C
11/19/2025
Violation issued (HPD, closed)
I
06/06/2025
Violation issued (HPD, closed)
A
04/08/2024
Violation issued (HPD, closed)
A
11/21/2023
Violation issued (HPD, closed)
I
03/21/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
A
10/21/2021
Signed off — Alteration
NSTALL 3 NEW BOILERS IN THE 3 STORY EXISTING BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00588810-I1
10/13/2021
Signed off — Alteration
INSTALL 3 NEW BOILERS AND 4 NEW H.W.H. IN THE 3 STORY EXISTING BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00556229-I1
09/28/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/17/2021
Permit issued — Boiler Equipment
B00588810-I1-BE
09/03/2021
Filed — Alteration
NSTALL 3 NEW BOILERS IN THE 3 STORY EXISTING BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00588810-I1
08/31/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/31/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/30/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/25/2021
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/17/2021
Filed — Alteration
INSTALL 3 NEW BOILERS AND 4 NEW H.W.H. IN THE 3 STORY EXISTING BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00556229-P1
07/19/2021
Permit issued — Plumbing
B00556229-I1-PL
07/12/2021
Filed — Alteration
INSTALL 3 NEW BOILERS AND 4 NEW H.W.H. IN THE 3 STORY EXISTING BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00556229-I1
04/07/2021
Violation issued (HPD, closed)
A
05/17/2018
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offT & T PLUMBING INC09/17/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC07/19/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/28/2021Pass-Final Boiler Equipment InspectionPassView ↗
08/31/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/31/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/25/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
09/03/2021Fire-Resistant Penetrations and JointsYING JIANGspecial
09/03/2021Heating SystemsYING JIANGspecial
09/03/2021Permanent certificateYING JIANGenergy_progress
09/03/2021HVAC-R and service water heating equipmentYING JIANGenergy_progress
09/03/2021Maintenance informationYING JIANGenergy_progress
09/03/2021HVAC-R and service water heating system controlsYING JIANGenergy_progress
08/19/2021Fire-Resistant Penetrations and JointsYING JIANGspecial
08/19/2021Energy Code Compliance InspectionsYING JIANGprogress
08/19/2021HVAC-R and service water heating system controlsYING JIANGenergy_progress
08/19/2021HVAC-R and service water piping design and insulationYING JIANGenergy_progress
08/19/2021HVAC-R and service water heating equipmentYING JIANGenergy_progress
08/17/2021Fire-Resistant Penetrations and JointsYING JIANGspecial
08/17/2021Energy Code Compliance InspectionsYING JIANGprogress
08/17/2021HVAC-R and service water piping design and insulationYING JIANGenergy_progress
08/17/2021HVAC-R and service water heating equipmentYING JIANGenergy_progress
08/17/2021HVAC-R and service water heating system controlsYING JIANGenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/01/2026B00556229-P1Request digital key ↗
09/01/2026B00556229-I1Request digital key ↗
09/01/2026B00588810-I1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026B00588810-I1Open ↗
08/25/2026B00556229-P1Open ↗
08/25/2026B00556229-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00556229-I1Open ↗
09/01/2026B00556229-P1Open ↗
09/01/2026B00588810-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026B00588810-I1Open ↗
08/25/2026B00556229-P1Open ↗
08/25/2026B00556229-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00556229-I1Open ↗
09/01/2026B00556229-P1Open ↗
09/01/2026B00588810-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00588810-I1Open ↗
08/13/2026B00556229-I1Open ↗