416 COLLEGE AVENUE
STATEN ISLAND · BIN 5011564
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R3XZoning
1,284 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,662 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRooftop solar photovoltaic system installation1p · 1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
James A Clancy211/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arc Design and Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ficazzola ConsultingGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
James A Clancy9176211/23/2025
Building Lifecycle
11/26/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01078693-I1
11/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
11/24/2025
Special inspection requirement — Final
James Clancy
11/24/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
11/24/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
13 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offFicazzola Consulting07/10/2025
DOB NOWSolarSigned-offFicazzola Consulting07/17/2024
1 project · most recent 07/12/2024
FiledStatusContractorScope
07/12/2024CompleteAmber Electl Contng—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/24/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
11/24/2025FinalJames Clancyprogress
11/24/2025Energy Code Compliance InspectionsJames Clancyprogress
11/24/2025Air barrier - visual inspectionJames Clancyenergy_progress
10/22/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
10/22/2025Energy Code Compliance InspectionsJames Clancyprogress
10/22/2025FinalJames Clancyprogress
10/22/2025Air barrier - visual inspectionJames Clancyenergy_progress
13 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account