← Back
Two stories - detached, small or mid-size
416 EAST 5 STREET
BROOKLYN · Kensington · BIN 3125418
💬 Discuss this project
1910Year Built
2.5Stories
A1Building Class
R5Zoning
2,188 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,000 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 1 filing · 14 docs
Attic4p · 1 filing · 14 docs
Floor 311p · 2 filings · 20 docs
Floor 217p · 3 filings · 20 docs
Floor 116p · 4 filings · 20 docs
Cellar11p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/19/2021$1.1M—— → —$514/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PROSPECT STUDIO ARCHITECTS PLLC703/22/2022
EJZ ENGINEERING110/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY LINE INTERIORS INCGeneral Contractor403/21/2026
GODFREY'S REFRIGERATIONGeneral Contractor203/21/2026
ETHOS PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EJZ ENGINEERING PLLC7852110/11/2021
AK CONSULTING SERVICES, I6198207/29/2021
Building Lifecycle
All (58)Filed (8)Permit Issued (4)Signed Off (3)Violation (4)Inspection (5)Objection (4)Special Inspection (30)
10/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/24/2023
Signed off — Alteration
B00609234-I1
06/10/2022
Signed off — Alteration
Propose to install new curb cut 10LF on existing concrete sidewalk for open parking space as per plan filed in conjunction with Alt-CO # .B00482964.I1.
B00559178-I1
06/08/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/25/2022
Signed off — Alteration
PROPOSE PLUMBING WORK FILED IN CONJUNCTION WITH ALT-CO B00482964 TO CONVERT EXISTING TWO-FAMILY TO ONE-FAMILY HOUSE.
B00517727-I1
03/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
SARAH PETROCELLI
03/28/2022
Special inspection requirement — Maintenance information
SARAH PETROCELLI
03/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SARAH PETROCELLI
03/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
SARAH PETROCELLI
03/28/2022
Special inspection requirement — Energy Code Compliance Inspections
SARAH PETROCELLI
03/22/2022
Filed — Alteration
PROPOSE PLUMBING WORK FILED IN CONJUNCTION WITH ALT-CO B00482964 TO CONVERT EXISTING TWO-FAMILY TO ONE-FAMILY HOUSE.
B00517727-P3
03/17/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/09/2022
Filed — Alteration
PROPOSE PLUMBING WORK FILED IN CONJUNCTION WITH ALT-CO B00482964 TO CONVERT EXISTING TWO-FAMILY TO ONE-FAMILY HOUSE.
B00517727-P2
01/14/2022
Filed — Alteration
PROPOSE PLUMBING WORK FILED IN CONJUNCTION WITH ALT-CO B00482964 TO CONVERT EXISTING TWO-FAMILY TO ONE-FAMILY HOUSE.
B00517727-P1
01/11/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SARAH PETROCELLI
01/11/2022
Special inspection requirement — Maintenance information
SARAH PETROCELLI
01/11/2022
Special inspection requirement — HVAC-R and service water heating system controls
SARAH PETROCELLI
01/11/2022
Special inspection requirement — HVAC-R and service water heating equipment
SARAH PETROCELLI
01/11/2022
Special inspection requirement — Energy Code Compliance Inspections
SARAH PETROCELLI
12/08/2021
Permit issued — Curb Cut
B00559178-I1-CC
11/04/2021
Permit issued — Mechanical Systems
B00609234-I1-MS
10/25/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/25/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/11/2021
Filed — Alteration
B00609234-I1
08/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
08/15/2021
Special inspection requirement — Fire-Resistance Rated Construction
SARAH PETROCELLI
08/15/2021
Special inspection requirement — Energy Code Compliance Inspections
SARAH PETROCELLI
08/15/2021
Special inspection requirement — Fenestration areas
SARAH PETROCELLI
08/15/2021
Special inspection requirement — Insulation placement and R values
SARAH PETROCELLI
08/15/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
SARAH PETROCELLI
08/15/2021
Special inspection requirement — Fenestration air leakage
SARAH PETROCELLI
08/15/2021
Special inspection requirement — Air barrier - visual inspection
SARAH PETROCELLI
08/15/2021
Special inspection requirement — Interior lighting power
SARAH PETROCELLI
08/15/2021
Special inspection requirement — Permanent certificate
SARAH PETROCELLI
08/05/2021
Objection resolved — Addressed
07/31/2021
Objection raised — Zoning
07/29/2021
Filed — Alteration CO
PROPOSE TO CONVERT EXISTING TWO-FAMILY TO ONE-FAMILY HOUSE W/ ONE OFF-STREET PARKING SPACE. GENERAL CONSTRUCTION WORKS AS PER PLANS. MECHANICAL, PLUMBING, CURB CUT WORKS FILED SEPARATELY. OBTAIN NEW C OF O.
B00482964-P1
07/28/2021
Special inspection requirement — Air barrier - visual inspection
SARAH PETROCELLI
07/28/2021
Special inspection requirement — Permanent certificate
SARAH PETROCELLI
07/28/2021
Special inspection requirement — Insulation placement and R values
SARAH PETROCELLI
07/28/2021
Special inspection requirement — Interior lighting power
SARAH PETROCELLI
07/28/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
SARAH PETROCELLI
07/28/2021
Special inspection requirement — Fenestration air leakage
SARAH PETROCELLI
07/28/2021
Special inspection requirement — Fenestration areas
SARAH PETROCELLI
07/28/2021
Special inspection requirement — Fire-Resistance Rated Construction
SARAH PETROCELLI
07/28/2021
Special inspection requirement — Energy Code Compliance Inspections
SARAH PETROCELLI
07/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
07/23/2021
Objection raised — Zoning
07/23/2021
Objection resolved — Addressed
07/21/2021
Permit issued — Plumbing
B00517727-I1-PL
07/19/2021
Filed — Alteration
Propose to install new curb cut 10LF on existing concrete sidewalk for open parking space as per plan filed in conjunction with Alt-CO # .B00482964.I1.
B00559178-I1
07/06/2021
Permit issued — General Construction
B00482964-I1-GC
05/10/2021
Filed — Alteration
PROPOSE PLUMBING WORK FILED IN CONJUNCTION WITH ALT-CO B00482964 TO CONVERT EXISTING TWO-FAMILY TO ONE-FAMILY HOUSE.
B00517727-I1
04/14/2021
Filed — Alteration CO
PROPOSE TO CONVERT EXISTING TWO-FAMILY TO ONE-FAMILY HOUSE W/ ONE OFF-STREET PARKING SPACE. GENERAL CONSTRUCTION WORKS AS PER PLANS. MECHANICAL, PLUMBING, CURB CUT WORKS FILED SEPARATELY. OBTAIN NEW C OF O.
B00482964-I1
04/23/2020
Violation issued (ECB, closed)
Zoning
02/28/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/28/2007
Violation issued (ECB, closed)
Zoning
02/28/2007
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offCITY LINE INTERIORS12/08/2021
DOB NOWMechanical SystemsSigned-offGODFREYS REFRIGERATION11/04/2021
DOB NOWPlumbingSigned-offETHOS PLUMBING CORP07/21/2021
DOB NOWGeneral ConstructionPermit IssuedCITY LINE INTERIORS07/06/2021
BISOTRE-ISSUEDEMPOWER CES LLC01/14/2022
2 projects · most recent 01/20/2023
General Wiring
FiledStatusContractorScope
01/20/2023CompleteNYCO ELECTRIC CORPGeneral Wiring
02/15/2022CompleteISLAND ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/08/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
03/17/2022Pass-Final CND-Occupancy InspectionPassView ↗
10/25/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/25/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
03/28/2022HVAC-R and service water heating equipmentSARAH PETROCELLIenergy_progress
03/28/2022Maintenance informationSARAH PETROCELLIenergy_progress
03/28/2022HVAC-R and service water piping design and insulationSARAH PETROCELLIenergy_progress
03/28/2022HVAC-R and service water heating system controlsSARAH PETROCELLIenergy_progress
03/28/2022Energy Code Compliance InspectionsSARAH PETROCELLIprogress
01/11/2022HVAC-R and service water piping design and insulationSARAH PETROCELLIenergy_progress
01/11/2022Maintenance informationSARAH PETROCELLIenergy_progress
01/11/2022HVAC-R and service water heating system controlsSARAH PETROCELLIenergy_progress
01/11/2022HVAC-R and service water heating equipmentSARAH PETROCELLIenergy_progress
01/11/2022Energy Code Compliance InspectionsSARAH PETROCELLIprogress
08/15/2021Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
08/15/2021Fire-Resistance Rated ConstructionSARAH PETROCELLIprogress
08/15/2021Energy Code Compliance InspectionsSARAH PETROCELLIprogress
08/15/2021Fenestration areasSARAH PETROCELLIenergy_progress
08/15/2021Insulation placement and R valuesSARAH PETROCELLIenergy_progress
08/15/2021Fenestration and door U-factor and product ratingsSARAH PETROCELLIenergy_progress
08/15/2021Fenestration air leakageSARAH PETROCELLIenergy_progress
08/15/2021Air barrier - visual inspectionSARAH PETROCELLIenergy_progress
08/15/2021Interior lighting powerSARAH PETROCELLIenergy_progress
08/15/2021Permanent certificateSARAH PETROCELLIenergy_progress
07/28/2021Air barrier - visual inspectionSARAH PETROCELLIenergy_progress
07/28/2021Permanent certificateSARAH PETROCELLIenergy_progress
07/28/2021Insulation placement and R valuesSARAH PETROCELLIenergy_progress
07/28/2021Interior lighting powerSARAH PETROCELLIenergy_progress
07/28/2021Fenestration and door U-factor and product ratingsSARAH PETROCELLIenergy_progress
Latest 25 of 30.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/01/2026B00482964-I1Request digital key ↗
09/01/2026B00609234-I1Request digital key ↗
08/30/2026B00517727-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
01/25/2024340832816Open ↗
08/10/2023340832816Open ↗
07/11/2023340832816Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
01/15/2022340832816Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00482964-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature20
08/28/2026B00482964-P1Open ↗
08/28/2026B00482964-P1Open ↗
08/28/2026B00482964-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00609234-I1Open ↗
08/13/2026B00517727-P1Open ↗
08/13/2026B00517727-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B00482964-P1Open ↗
08/26/2026B00482964-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/07/2022340832816Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/07/2022340832816Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/07/2022340832816Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/13/2026B00482964-I1Open ↗
08/13/2026B00482964-P1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
01/11/2022340832816Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00482964-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/01/2026B00609234-I1Open ↗
08/13/2026B00517727-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/07/2022340832816Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/15/2022340832816Open ↗
01/07/2022340832816Open ↗
01/07/2022340832816Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00517727-I1Open ↗
08/13/2026B00482964-I1Open ↗
08/13/2026B00609234-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/07/2022340832816Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/28/2024340832816Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
01/07/2022340832816Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
02/28/2024340832816Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/28/2024340832816Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/28/2024340832816Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/15/2022340832816Open ↗
01/07/2022340832816Open ↗
01/07/2022340832816Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/28/2024340832816Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/28/2024340832816Open ↗
▸Approvals, Objections & Sign-offs4
▸BISFINAL ELECTRICAL SIGNOFF1
06/04/2024340832816Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/02/2024340832816Open ↗
▸BISPTA4: TAX ABATEMENT ELIGIBILITY APPROVAL1
02/28/2024340832816Open ↗
▸BISFINAL1
02/28/2024340832816Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
01/07/2022340832816Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/28/2024340832816Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
06/04/2024340832816Open ↗
01/25/2024340832816Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/07/2022340832816Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/13/2026B00482964-I1Open ↗