416 EAST 76TH STREET
MANHATTAN · BIN 1045942
💬 Discuss this project
1940Year Built
4Stories
I5Building Class
R8BZoning
9,500 sfGross Floor Area
1Units
0 Active Violations
Health center, child center, clinic · 2,554 sf lot · 3.72 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 4Gracie Square Hospital, NewYork-Presbyterian11p · 3 filings · 18 docs
Floor 3
Floor 2NewYork-PresbyterianUnder Construction18p · 2 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York Presbyterian Hospital2207/08/2026
Arthur Vincent Co403/21/2026
Gracie Square Hospital103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cosentini Associates412/05/2025
Narofsky Architecture & Design212/05/2025
RLM Engineering207/07/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Expediting1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hellman Construction CoGeneral Contractor404/09/2026
Riehm PlumbingPlumbing207/08/2026
Riehm PlumbingFire Protection207/08/2026
H.M. Hughes CoGeneral Contractor207/08/2026
Sirina Fire ProtectionFire Protection107/08/2026
Harley Electric CoElectrical103/21/2026
ILG Mechanical ServicesFire Protection107/08/2026
Harley Electric CoElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Fenagh6942312/05/2025
Alan Margolin & Associates423303/30/2021
RLM Engineering6913207/07/2020
Building Lifecycle
All (75)Filed (8)Permit Issued (12)Signed Off (4)Violation (25)Inspection (2)Special Inspection (24)
07/15/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/07/2026
Permit issued — General Construction
M01308142-I1-GC
01/07/2026
Permit issued — Mechanical Systems
M01308142-S1-MS
12/10/2025
Permit issued — Sprinklers
M01308142-S2-EW-SP
12/08/2025
Permit issued — Mechanical Systems
M01308142-S1-MS
12/08/2025
Permit issued — General Construction
M01308142-I1-GC
12/05/2025
Filed — Alteration
GSH 2FL: MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS AT PARTIAL 2ND FL AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01308142-I1
12/05/2025
Filed — Alteration
GSH 2FL: MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS AT PARTIAL 2ND FL AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01308142-S2
12/05/2025
Filed — Alteration
GSH 2FL: MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS AT PARTIAL 2ND FL AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01308142-S1
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
12/05/2025
Special inspection requirement — Maintenance information
AILANTO DANIEL MINAWI
12/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
AILANTO DANIEL MINAWI
12/05/2025
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
12/03/2025
Special inspection requirement — Lighting controls
AILANTO DANIEL MINAWI
12/03/2025
Special inspection requirement — Interior lighting power
AILANTO DANIEL MINAWI
12/03/2025
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
12/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
AILANTO DANIEL MINAWI
10/28/2025
Special inspection requirement — Final
AILANTO DANIEL MINAWI
10/24/2025
Special inspection requirement — Sprinkler Systems
AILANTO DANIEL MINAWI
10/24/2025
Special inspection requirement — Mechanical Systems
AILANTO DANIEL MINAWI
10/24/2025
Special inspection requirement — Final
AILANTO DANIEL MINAWI
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
10/24/2025
Special inspection requirement — Post-installed Anchors
AILANTO DANIEL MINAWI
06/09/2022
Signed off — Alteration
M00490597-I1
06/08/2022
Signed off — Alteration
PLUMBING AND SPRINKLER MODIFICATIONS AT 4TH FLOOR
M00490591-I1
02/16/2022
Signed off — Alteration
MODIFICATIONS OF INTERIOR PARTITIONS AND FINISHES TO ACCOMODATE ALTERATIONS AT 4TH FLOOR
M00490586-I1
01/28/2022
Permit issued — Plumbing
M00490591-I1-EW-SP
01/27/2022
Permit issued — Plumbing
M00490591-I1-PL
04/05/2021
Permit issued — General Construction
M00490586-I1-GC
04/05/2021
Permit issued — Mechanical Systems
M00490597-I1-MS
04/05/2021
Permit issued — Sprinklers
M00490591-I1-EW-SP
04/02/2021
Permit issued — Sprinklers
M00490591-I1-PL
03/30/2021
Filed — Alteration
MODIFICATIONS OF INTERIOR PARTITIONS AND FINISHES TO ACCOMODATE ALTERATIONS AT 4TH FLOOR
M00490586-I1
03/25/2021
Filed — Alteration
M00490597-I1
03/25/2021
Filed — Alteration
PLUMBING AND SPRINKLER MODIFICATIONS AT 4TH FLOOR
M00490591-I1
03/24/2021
Special inspection requirement — Fire-Resistance Rated Construction
Young Suh
03/22/2021
Special inspection requirement — Final
Young Suh
03/22/2021
Special inspection requirement — Lighting controls
Young Suh
03/22/2021
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
03/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
03/22/2021
Special inspection requirement — Sprinkler Systems
Young Suh
03/22/2021
Special inspection requirement — Interior lighting power
Young Suh
02/18/2021
Signed off — Alteration
Modification to existing sprinkler system to include 7 new sprinkler heads with related branch piping and relocating 8 sprinkler heads on the 2nd. floor. No change in use, egress or occupancy.
M00356366-I1
07/09/2020
Special inspection requirement — Sprinkler Systems
Ronald Merhige
07/07/2020
Filed — Alteration
Modification to existing sprinkler system to include 7 new sprinkler heads with related branch piping and relocating 8 sprinkler heads on the 2nd. floor. No change in use, egress or occupancy.
M00356366-P1
07/02/2020
Special inspection requirement — Sprinkler Systems
Ronald Merhige
06/17/2020
Permit issued — Sprinklers
M00356366-I1-EW-SP
06/16/2020
Filed — Alteration
Modification to existing sprinkler system to include 7 new sprinkler heads with related branch piping and relocating 8 sprinkler heads on the 2nd. floor. No change in use, egress or occupancy.
M00356366-I1
10/29/2019
Violation issued (ECB, closed)
Elevators
09/10/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/29/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/20/2017
Violation issued (ECB, closed)
Unknown
09/23/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/02/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/24/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/06/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/30/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/31/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHellman Construction Co01/07/2026
DOB NOWMechanical SystemsPermit IssuedHellman Construction Co01/07/2026
DOB NOWSprinklersPermit IssuedSirina Fire Protection12/10/2025
DOB NOWMechanical SystemsPermit IssuedHellman Construction Co12/08/2025
DOB NOWGeneral ConstructionPermit IssuedHellman Construction Co12/08/2025
DOB NOWSprinklersSigned-offRiehm Plumbing01/28/2022
DOB NOWPlumbingSigned-offRiehm Plumbing01/27/2022
DOB NOWGeneral ConstructionSigned-offHM Hughes Co04/05/2021
DOB NOWMechanical SystemsSigned-offHM Hughes Co04/05/2021
DOB NOWSprinklersSigned-offRiehm Plumbing04/05/2021
DOB NOWPlumbingSigned-offRiehm Plumbing04/02/2021
DOB NOWSprinklersSigned-offILG Mechanical Services06/17/2020
BISOTISSUEDH.M. Hughes Co02/05/2021
BISOTISSUEDArthur Vincent Company12/07/2010
BISMHISSUEDWonder Works Construction08/27/1991
BISOTISSUEDWonder Works Construction08/27/1991
1 project · most recent 12/05/2025
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
12/05/2025Permit IssuedHellman Construction CoHeating Systems
Heating
Stelpro AB0501W & AB03019W 2,730 BTU · Baseboard ×2
1 project · most recent 12/05/2025
Sprinkler System
FiledStatusContractorScope
12/05/2025Permit IssuedSirina Fire ProtectionSprinkler System
1 project · most recent 12/05/2025
FiledStatusContractorScope
12/05/2025———
1 project · most recent 12/20/2025
General Wiring
FiledStatusContractorScope
12/20/2025CompleteHarley Electric CoGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
12/05/2025Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
12/05/2025Maintenance informationAILANTO DANIEL MINAWIenergy_progress
12/05/2025HVAC-R and service water piping design and insulationAILANTO DANIEL MINAWIenergy_progress
12/05/2025Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
12/03/2025Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
12/03/2025Lighting controlsAILANTO DANIEL MINAWIenergy_progress
12/03/2025Interior lighting powerAILANTO DANIEL MINAWIenergy_progress
12/03/2025Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
12/03/2025Fire-Resistance Rated ConstructionAILANTO DANIEL MINAWIprogress
10/28/2025FinalAILANTO DANIEL MINAWIprogress
10/24/2025Sprinkler SystemsAILANTO DANIEL MINAWIspecial
10/24/2025Mechanical SystemsAILANTO DANIEL MINAWIspecial
10/24/2025FinalAILANTO DANIEL MINAWIprogress
10/24/2025Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
10/24/2025Post-installed AnchorsAILANTO DANIEL MINAWIspecial
03/24/2021Fire-Resistance Rated ConstructionYoung Suhprogress
03/22/2021FinalYoung Suhprogress
03/22/2021Lighting controlsYoung Suhenergy_progress
03/22/2021Energy Code Compliance InspectionsYoung Suhprogress
03/22/2021Fire-Resistant Penetrations and JointsYoung Suhspecial
03/22/2021Sprinkler SystemsYoung Suhspecial
03/22/2021Interior lighting powerYoung Suhenergy_progress
07/09/2020Sprinkler SystemsRonald Merhigespecial
07/02/2020Sprinkler SystemsRonald Merhigespecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NewYork-PresbyterianMedical / HealthcareFloors 2, 4
Project M01308142 Alteration · Permit Entire · 12/05/2025
Project M00490597 Alteration · LOC Issued · 03/25/2021
Gracie Square HospitalMedical / HealthcareFloor 4
Project M00490586 Alteration · LOC Issued · 03/30/2021
Project M00490591 Alteration · LOC Issued · 03/25/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
09/04/2026M00490591-I1Request digital key ↗
09/04/2026M00490597-I1Request digital key ↗
09/03/2026M00490586-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/04/2026M00356366-I1Request digital key ↗
08/15/2026M00356366-P1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
10/14/2020140964142Open ↗
10/07/2010120489649Open ↗
09/24/2010120476234Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
02/05/2021140964142Open ↗
12/08/2010120489649Open ↗
09/24/2010120476234Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature11
10/08/2026M00490586-I1Open ↗
10/08/2026M00490586-I1Open ↗
09/23/2026M01308142-S1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
07/19/2011120489649Open ↗
07/15/2011120472425Open ↗
07/15/2011120476234Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
10/08/2026M00490586-I1Open ↗
09/23/2026M01308142-S2Open ↗
09/23/2026M01308142-S2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/04/2026M00356366-I1Open ↗
09/04/2026M00490591-I1Open ↗
09/04/2026M00490597-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
10/07/2010120489649Open ↗
09/23/2010120476234Open ↗
09/17/2010120472425Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
10/07/2010120489649Open ↗
09/23/2010120476234Open ↗
09/17/2010120472425Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/19/2020140964142Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/04/2026M00356366-I1Open ↗
09/04/2026M00490591-I1Open ↗
09/04/2026M00490597-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/20/2026M01308142-S2Open ↗
08/20/2026M01308142-S1Open ↗
08/20/2026M01308142-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/17/2010120472425Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/19/2020140964142Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/23/2010120476234Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
12/08/2010120489649Open ↗
▸Energy Compliance5
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00490586-I1Open ↗
08/13/2026M00490597-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/19/2020140964142Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/08/2022140964142Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/08/2022140964142Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/05/2021140964142Open ↗
10/19/2020140964142Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
09/04/2026M00356366-I1Open ↗
09/04/2026M00490591-I1Open ↗
09/04/2026M00490597-I1Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
04/11/2022140964142Open ↗
04/11/2022140964142Open ↗
07/19/2011120489649Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
10/07/2010120489649Open ↗
09/23/2010120476234Open ↗
09/17/2010120472425Open ↗
▸BISFINAL1
04/08/2022140964142Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
11/27/2020140964142Open ↗
07/19/2011120489649Open ↗
10/07/2010120489649Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/08/2022140964142Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
10/07/2010120489649Open ↗
09/23/2010120476234Open ↗
09/17/2010120472425Open ↗
▸BISADDITIONAL INFORMATION2
11/27/2020140964142Open ↗
09/22/2010120472425Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/19/2020140964142Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
07/15/2011120472425Open ↗
07/15/2011120476234Open ↗
11/16/2010120489649Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/19/2011120489649Open ↗