← Back
BuildNYC
Two family frame
416 REVERE AVENUE
BRONX · BIN 2130770
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R4-1Zoning
2,550 sfGross Floor Area
2Units
0 Active Violations
Two family frame · 2,500 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof14p · 1 filing · 20 docs
Attic4p · 1 filing · 20 docs
Floor 215p · 1 filing · 20 docs
Floor 1Unit 1A74p · 1 filing · 20 docs
Cellar21p · 2 filings · 20 docs
Basement22p · 1 filing · 20 docs
Site & exterior76p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SR Equities1507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/29/2024$1.1M—PRIME STONE CAPITAL REVERE AVE LLC → Private party$431/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL Engineering808/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metro Design1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S.goolcharan ConstructionScaffold303/21/2026
Gerebuzza ConstructionGeneral Contractor203/21/2026
J&J DesignsGeneral Contractor107/08/2026
Superior Plumbing & HeatingPlumbing107/08/2026
W.R. Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781508/03/2023
Triangle Inspection & Tes7495308/03/2023
Building Lifecycle
07/27/2026
§ 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE KITCHEN LOCATED AT APT 1 LOWER LEVEL, 1st STORY, 1st APARTMENT FROM NORTH…
HPD violation · closed
10/26/2023
Signed off — New Building
FILED HEREWITH PLUMBING AND PLUMBING-SPRINKLER (LESS THAN 30 HEADS) WORK TYPES IN CONJUNCTION WITH DOB NOW N.B. APPLICATION # X00638964-I1 & GARAGE N.B. APPLICATION #X00753716-I1.
X00638964-S4
10/26/2023
Signed off — Alteration
FILING FOR STEEL SLEEVE AND FIVE FEET OF SIX INCH DIAMETER XHCI PIPING IN CELLAR THROUGH FOUNDATION WALL. FILING FOR DETENTION TANK, INSTALL SIX INCH DIAMETER XHCI "Y" CONNECTION WITH OVERFLOW. RELATED N.B.# X00638964-I1, PL# X00638964-S4, DEP#HCX-34/22-1
X00874319-I1
09/07/2023
Signed off — New Building
FILED HEREWITH PLUMBING AND PLUMBING-SPRINKLER (LESS THAN 30 HEADS) WORK TYPES IN CONJUNCTION WITH DOB NOW N.B. APPLICATION # X00638964-I1 & GARAGE N.B. APPLICATION #X00753716-I1.
X00638964-S3
09/01/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
69 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJ&J Designs07/26/2023
DOB NOWPlumbingSigned-offW.R. Plumbing and Heating05/17/2023
DOB NOWPlumbingSigned-offSuperior Plumbing & Heating01/27/2023
DOB NOWEarth WorkPermit IssuedGerebuzza Construction07/27/2022
DOB NOWConstruction FenceSigned-offS.goolcharan Construction04/08/2022
1 project · most recent 08/03/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
08/03/2023Signed-offJ&J DesignsAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 08/03/2023
Sprinkler System
FiledStatusContractorScope
08/03/2023——Sprinkler System
1 project · most recent 08/03/2023
Storm Water/Sanitary
FiledStatusContractorScope
08/03/2023Signed-offSuperior Plumbing & HeatingStorm, Water/Sanitary
1 project · most recent 06/29/2023
General Wiring
FiledStatusContractorScope
06/29/2023CompletePower Surge ElectricGeneral Wiring
1 project · most recent 08/03/2023
Steel Masonry Wood
FiledStatusContractorScope
08/03/2023Signed-offJ&J DesignsSteel, Masonry, Wood
1 project · most recent 08/03/2023
Fence
FiledStatusContractorScope
08/03/2023Signed-offJ&J DesignsFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/01/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
08/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/06/2023Pass-Final PL - UndergroundPassView ↗
02/10/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/10/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
08/07/2023Sprinkler SystemsCHRISTIAN LOZADAspecial
08/07/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
08/07/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/07/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
08/07/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/07/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
08/07/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
08/07/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
08/07/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
07/27/2023Structural Steel - High Strength BoltingCHRISTIAN LOZADAspecial
07/27/2023Subgrade InspectionsCHRISTIAN LOZADAspecial
07/27/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
07/27/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/27/2023FinalCHRISTIAN LOZADAprogress
07/27/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
07/27/2023Footing and FoundationCHRISTIAN LOZADAprogress
07/27/2023Structural Wood FrameCHRISTIAN LOZADAprogress
07/27/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
07/27/2023Fenestration air leakageCHRISTIAN LOZADAenergy_progress
07/27/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
07/27/2023Air barrier — testing CHRISTIAN LOZADAenergy_progress
07/27/2023Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
07/27/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
07/27/2023Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
07/27/2023Fenestration areasCHRISTIAN LOZADAenergy_progress
Latest 25 of 54.
78 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account