One family attached or semi-detached
4160A PAULDING AVENUE
BRONX · BIN 2065299
💬 Discuss this project
1940Year Built
2Stories
A5Building Class
R4Zoning
1,408 sfGross Floor Area
1Units
One family attached or semi-detached · 1,360 sf lot · 1.04 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/14/2023$400K—Private party → Private party$284/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR201/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISLAND ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281201/21/2026
Building Lifecycle
All (18)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (14)
08/28/2026
Signed off — Alteration
Installation of solar panels, rooftop, grid tied, railed, 6 modules, 2.58 KW
X01329428-I1
01/26/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
01/26/2026
Special inspection requirement — Post-installed Anchors
Mina Makar
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
01/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
01/26/2026
Special inspection requirement — Adhesive-Based Solar Pedestal Bonding Systems
Mina Makar
01/26/2026
Special inspection requirement — Final
Mina Makar
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
01/21/2026
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 6 modules, 2.58 KW
X01329428-P1
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
01/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
01/21/2026
Special inspection requirement — Adhesive-Based Solar Pedestal Bonding Systems
Mina Makar
01/21/2026
Special inspection requirement — Post-installed Anchors
Mina Makar
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
01/21/2026
Special inspection requirement — Final
Mina Makar
01/21/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
12/09/2025
Permit issued — Solar
X01329428-I1-SL
12/05/2025
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 6 modules, 2.58 KW
X01329428-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR12/09/2025
2 projects · most recent 12/22/2025
General Wiring
FiledStatusContractorScope
12/22/2025CompleteISLAND ELECTRIC CORP—
12/11/2025Permit IssuedNELSON & TOM MAINT INC DBGeneral Wiring
1 project · most recent 01/21/2026
FiledStatusContractorScope
01/21/2026Signed-offMOMENTUM SOLAR24 panels, 10.32 kw, 106 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/26/2026Air barrier - visual inspectionMina Makarenergy_progress
01/26/2026Post-installed AnchorsMina Makarspecial
01/26/2026Fire-Resistant Penetrations and JointsMina Makarspecial
01/26/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
01/26/2026Adhesive-Based Solar Pedestal Bonding SystemsMina Makarspecial
01/26/2026FinalMina Makarprogress
01/26/2026Energy Code Compliance InspectionsMina Makarprogress
01/21/2026Fire-Resistant Penetrations and JointsMina Makarspecial
01/21/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
01/21/2026Adhesive-Based Solar Pedestal Bonding SystemsMina Makarspecial
01/21/2026Post-installed AnchorsMina Makarspecial
01/21/2026Energy Code Compliance InspectionsMina Makarprogress
01/21/2026FinalMina Makarprogress
01/21/2026Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026X01329428-I1Request digital key ↗
08/17/2026X01329428-P1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026X01329428-P1Open ↗
09/01/2026X01329428-P1Open ↗
08/30/2026X01329428-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X01329428-P1Open ↗
09/01/2026X01329428-P1Open ↗
09/01/2026X01329428-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026X01329428-I1Open ↗
08/17/2026X01329428-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026X01329428-P1Open ↗
08/17/2026X01329428-I1Open ↗