← Back
Two family brick
417 5 STREET
BROOKLYN · BIN 3021322
💬 Discuss this project
1901Year Built
2Stories
B1Building Class
R6BZoning
2,112 sfGross Floor Area
2Units
Two family brick · 1,667 sf lot · 1.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof1p · 1 filing · 14 docs
Bulkhead5p · 1 filing · 14 docs
Floor 34p · 2 filings · 17 docs
Floor 27p · 4 filings · 20 docs
Floor 15p · 2 filings · 17 docs
Cellar6p · 4 filings · 20 docs
Basement3p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
198 SHEFA1003/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WITHDRAWN108/07/2024
CONSULTING ENGINEER407/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NAPHTALI DEUTSCH ARCHITECTURE303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONSULTING ENGINEER5093108/07/2024
Building Lifecycle
All (48)Filed (5)Objection (21)Special Inspection (22)
09/19/2024
Objection resolved — Addressed
08/30/2024
Objection resolved — Addressed
08/30/2024
Objection resolved — Addressed
08/29/2024
Objection resolved — Addressed
08/29/2024
Objection resolved — Addressed
08/29/2024
Objection resolved — Addressed
08/29/2024
Objection resolved — Addressed
08/29/2024
Objection resolved — Addressed
08/29/2024
Objection resolved — Addressed
08/29/2024
Objection resolved — Addressed
08/19/2024
Objection raised — Scope
08/19/2024
Objection raised — Scope
08/19/2024
Objection raised — Inspections
08/19/2024
Objection raised — Structural
08/19/2024
Objection raised — Other
08/19/2024
Objection raised — Scope
08/19/2024
Objection raised — Scope
08/19/2024
Objection raised — Fire_Protection
08/19/2024
Objection raised — Other
08/14/2024
Objection raised — Other
08/14/2024
Objection raised — Other
08/07/2024
Filed — Alteration CO
RENOVATE & ENLARGE EXISTING 2- FAMILY RESIDENCE AT THE CELLAR, BASEMENT, FIRST & SECOND FLOORS, ROOF & FACADE & TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01081973-I1
07/31/2024
Filed — Alteration
Plumbing and gas work at the cellar, first, second, & third floors only.
B01081971-I1
07/31/2024
Special inspection requirement — Structural Cold-Formed Steel
John Natoli
07/30/2024
Filed — Alteration
Installation of temporary 8'-0" wood fence to be removed only after all work is completed.
B01081966-I1
07/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Natoli
07/30/2024
Special inspection requirement — Structural Steel - Details
John Natoli
07/30/2024
Special inspection requirement — Structural Steel - High Strength Bolting
John Natoli
07/30/2024
Special inspection requirement — Structural Steel - Welding
John Natoli
07/30/2024
Special inspection requirement — Subgrade Inspections
John Natoli
07/30/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
John Natoli
07/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Natoli
07/30/2024
Special inspection requirement — Energy Code Compliance Inspections
John Natoli
07/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
John Natoli
07/30/2024
Special inspection requirement — Concrete - Cast-In-Place
John Natoli
07/30/2024
Special inspection requirement — Permanent certificate
John Natoli
07/30/2024
Special inspection requirement — Maintenance information
John Natoli
07/30/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
John Natoli
07/30/2024
Special inspection requirement — Fenestration areas
John Natoli
07/30/2024
Special inspection requirement — Air barrier - visual inspection
John Natoli
07/30/2024
Special inspection requirement — Insulation placement and R values
John Natoli
07/30/2024
Special inspection requirement — Fenestration air leakage
John Natoli
07/30/2024
Special inspection requirement — Interior lighting power
John Natoli
07/30/2024
Special inspection requirement — Protection of exposed foundation insulation
John Natoli
07/18/2024
Filed — Alteration
B01081959-I1
07/18/2024
Filed — Alteration
CAP & REMOVE (1) BOILER & (1) HOT WATERHEATER AT CELLAR. CAP & REMOVE (1) SINK, (1) TUB, (1) SHOWER, (2) TOILETS & (1) GAS RANGE AT BASEMENT. CAP & REMOVE (1) TOILET & (1) LAVATORY AT FIRST FLOOR. CAP & REMOVE (1) TOILET, (1) LAVATORY, (1) TUB, cont'd
B01081961-I1
07/16/2024
Special inspection requirement — Final
John Natoli
07/16/2024
Special inspection requirement — Footing and Foundation
John Natoli
Nothing on file for this building.
2 projects · most recent 07/31/2024
Gas Water/Sanitary
FiledStatusContractorScope
07/31/2024——Gas, Water/Sanitary
07/18/2024——Gas, Water/Sanitary
1 project · most recent 08/07/2024
Steel
FiledStatusContractorScope
08/07/2024——Steel
1 project · most recent 07/30/2024
Fence
FiledStatusContractorScope
07/30/2024——Fence
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
07/31/2024Structural Cold-Formed SteelJohn Natolispecial
07/30/2024Fire-Resistant Penetrations and JointsJohn Natolispecial
07/30/2024Structural Steel - DetailsJohn Natolispecial
07/30/2024Structural Steel - High Strength BoltingJohn Natolispecial
07/30/2024Structural Steel - WeldingJohn Natolispecial
07/30/2024Subgrade InspectionsJohn Natolispecial
07/30/2024Subsurface Investigations (Borings/Test Pits)John Natolispecial
07/30/2024Structural Stability – Alterations of existing buildingsJohn Natolispecial
07/30/2024Energy Code Compliance InspectionsJohn Natoliprogress
07/30/2024Fire-Resistance Rated ConstructionJohn Natoliprogress
07/30/2024Concrete - Cast-In-PlaceJohn Natolispecial
07/30/2024Permanent certificateJohn Natolienergy_progress
07/30/2024Maintenance informationJohn Natolienergy_progress
07/30/2024Fenestration and door U-factor and product ratingsJohn Natolienergy_progress
07/30/2024Fenestration areasJohn Natolienergy_progress
07/30/2024Air barrier - visual inspectionJohn Natolienergy_progress
07/30/2024Insulation placement and R valuesJohn Natolienergy_progress
07/30/2024Fenestration air leakageJohn Natolienergy_progress
07/30/2024Interior lighting powerJohn Natolienergy_progress
07/30/2024Protection of exposed foundation insulationJohn Natolienergy_progress
07/16/2024FinalJohn Natoliprogress
07/16/2024Footing and FoundationJohn Natoliprogress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026B01081961-I1Request digital key ↗
08/24/2026B01081959-I1Request digital key ↗
08/24/2026B01081966-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01081973-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026B01081959-I1Open ↗
08/24/2026B01081971-I1Open ↗
08/13/2026B01081961-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B01081973-I1Open ↗
08/26/2026B01081973-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B01081973-I1Open ↗
08/26/2026B01081973-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/13/2026B01081973-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01081973-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B01081959-I1Open ↗
08/24/2026B01081971-I1Open ↗
08/13/2026B01081961-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification1
08/13/2026B01081973-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01081973-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01081973-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01081973-I1Open ↗