← Back
Two family brick
4172 LACONIA AVENUE
BRONX · Eastchester-Edenwald-Baychester · BIN 2066112
💬 Discuss this project
1932Year Built
2Stories
B1Building Class
R5DZoning
1,462 sfGross Floor Area
2Units
Two family brick · 1,760 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
ElectricalGeneral
Roof6p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC304/09/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272404/09/2026
Building Lifecycle
All (19)Filed (3)Permit Issued (1)Signed Off (1)Special Inspection (14)
08/06/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01296925-I1
05/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/01/2026
Special inspection requirement — Final
Walid Abdulla
05/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/01/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/09/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01296925-P2
04/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
03/20/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
03/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/20/2026
Special inspection requirement — Final
Walid Abdulla
12/05/2025
Permit issued — Solar
X01296925-I1-SL
12/01/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01296925-P1
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/21/2025
Special inspection requirement — Final
Walid Abdulla
11/21/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/17/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01296925-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC12/05/2025
1 project · most recent 03/06/2026
FiledStatusContractorScope
03/06/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 04/09/2026
FiledStatusContractorScope
04/09/2026Signed-offSUNRUN INSTALLATION SVC14 panels, 5.74 kw, 168.18 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
05/01/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/01/2026FinalWalid Abdullaprogress
05/01/2026Energy Code Compliance InspectionsWalid Abdullaprogress
05/01/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
05/01/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/09/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
03/20/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
03/20/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/20/2026Energy Code Compliance InspectionsWalid Abdullaprogress
03/20/2026FinalWalid Abdullaprogress
11/21/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/21/2025FinalWalid Abdullaprogress
11/21/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
11/21/2025Energy Code Compliance InspectionsWalid Abdullaprogress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026X01296925-I1Request digital key ↗
08/17/2026X01296925-P2Request digital key ↗
08/17/2026X01296925-P1Request digital key ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026X01296925-I1Open ↗
09/01/2026X01296925-I1Open ↗
09/01/2026X01296925-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026X01296925-I1Open ↗
09/01/2026X01296925-I1Open ↗
09/01/2026X01296925-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026X01296925-P2Open ↗
08/13/2026X01296925-I1Open ↗
08/13/2026X01296925-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026X01296925-P2Open ↗
08/13/2026X01296925-P1Open ↗
08/13/2026X01296925-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026X01296925-I1Open ↗