← Back
Two family frame
418 BEACH 38 STREET
QUEENS · BIN 4817810
💬 Discuss this project
2024Year Built
2Stories
B2Building Class
R4Zoning
2,400 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 3,000 sf lot · 0.8 FAR built · Flood zone AE
Locations of Work
StructuralGeneral
Floor 312p · 1 filing · 20 docs
Floor 211p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar1p · 1 filing · 12 docs
1 job · most recent 05/08/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/08/2024Permit IssuedV.A BUILDERS CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Comfort Aire MCG3036PB4P 3 tons · Split System ×4
Heating
Navien NCB-150E 60,000 BTU · Boiler ×4
Ventilation
Panasonic FV-05VQ5 50 CFM · Exhaust Fan ×8
FV-15VQ5 150 CFM · Exhaust Fan ×4
2 jobs · most recent 04/03/2025
General Wiring
FiledStatusContractorScope
04/03/2025CompleteSUNRUN SOLAR ELECTL CORP—
07/21/2024CompleteSKY ELECTRIC LLCGeneral Wiring
1 job · most recent 05/08/2024
Steel Concrete Wood
FiledStatusContractorScope
05/08/2024Permit IssuedV.A BUILDERS CORPSteel, Concrete, Wood
Building Lifecycle
All (89)Filed (9)Permit Issued (5)Signed Off (4)Violation (2)Inspection (11)Objection (28)Special Inspection (30)
04/03/2025
Filed — Alteration
Q01196899-I1
02/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/06/2024
Signed off — Alteration
PROPOSED CURB CUT IN CONJUNCTION WTH NB JOB # Q00885166
Q00899344-I1
09/04/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/23/2024
Signed off — Alteration
Q00899342-I1
08/22/2024
Signed off — Alteration
INSTALLATION OF METAL SLEEVE AND FIVE FEET OF SIX INCHES DIAMETER XHCI PIPING IN CELLAR THROUGH FOUNDATION WALL IN CONJUNCTION WITH NB APPLICATION # Q00885166
Q01023312-I1
08/22/2024
Signed off — Alteration
FILING TO AMEND THE PLUMBING PLAN IN CONJUNCTION WITH NEW BUILDING APPLICATION # Q00885166
Q00899330-I1
06/05/2024
Filed — Alteration
FILING TO AMEND THE PLUMBING PLAN IN CONJUNCTION WITH NEW BUILDING APPLICATION # Q00885166
Q00899330-P2
06/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
06/04/2024
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
06/04/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
06/04/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Interior lighting power
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Electric vehicle service equipment requirements
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Subgrade Inspections
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Masonry
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Concrete - Cast-In-Place
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Structural Cold-Formed Steel
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
05/23/2024
Special inspection requirement — Structural Steel - Details
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Mechanical Systems
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Heating Systems
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Footing and Foundation
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Structural Wood Frame
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Final
JAN PEREZ
05/23/2024
Special inspection requirement — Energy Code Compliance Inspections
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Preliminary
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Lowest Floor Elevation
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Fenestration areas
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Metering
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Air barrier — testing
PIROOZ SOLTANIZADEH
05/23/2024
Special inspection requirement — Fenestration air leakage
PIROOZ SOLTANIZADEH
05/08/2024
Filed — New Building
Proposed new three-story two-family frame building
Q00885166-P1
05/08/2024
Filed — Alteration
FILING TO AMEND THE PLUMBING PLAN IN CONJUNCTION WITH NEW BUILDING APPLICATION # Q00885166
Q00899330-P1
04/26/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/09/2024
Permit issued — Plumbing
Q01023312-I1-PL
04/09/2024
Permit issued — Curb Cut
Q00899344-I1-CC
03/20/2024
Filed — Alteration
INSTALLATION OF METAL SLEEVE AND FIVE FEET OF SIX INCHES DIAMETER XHCI PIPING IN CELLAR THROUGH FOUNDATION WALL IN CONJUNCTION WITH NB APPLICATION # Q00885166
Q01023312-I1
02/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/15/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/15/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/08/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/01/2024
Permit issued — Plumbing
Q00899330-I1-PL
01/29/2024
Permit issued — Foundation
Q00885166-I1-GC-CX
12/18/2023
Permit issued — Construction Fence
Q00899342-I1-FN
10/04/2023
Objection resolved — Addressed
10/04/2023
Objection resolved — Addressed
10/04/2023
Objection resolved — Addressed
08/24/2023
Objection resolved — Addressed
08/23/2023
Objection resolved — Addressed
Latest 60 of 89 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED DEVELOPERS2207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/13/2025$970K—— → —$404/sf building
07/18/2023$135K—Private party → MARTIN 26 LLC— not available
01/09/2018$65K—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/03/2025
PIROOZ ENGINEERING, P.C.806/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
V.A BUILDERS CORPGeneral Contractor907/08/2026
PIROOZ SOLTANIZADEHElectrical203/21/2026
SAMY MOUNASElectrical103/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
W.R. PLBG AND HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/03/2025
IP CONCRETE TESTING AND I6252306/05/2024
PIROOZ ENGINEERING P.C7177506/05/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP04/09/2024
DOB NOWCurb CutSigned-offV.A BUILDERS CORP04/09/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR02/01/2024
DOB NOWFoundationPermit IssuedV.A BUILDERS CORP01/29/2024
DOB NOWConstruction FenceSigned-offV.A BUILDERS CORP12/18/2023
BIS—ISSUEDLEEWOOD EDGEMERE, L.L.C.03/28/2003
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
02/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/04/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/26/2024Pass-Final PL - UndergroundPassView ↗
04/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/15/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/15/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/15/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/08/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
06/04/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
06/04/2024Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
06/04/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
06/04/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
05/23/2024Fenestration and door U-factor and product ratingsPIROOZ SOLTANIZADEHenergy_progress
05/23/2024HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
05/23/2024Interior lighting powerPIROOZ SOLTANIZADEHenergy_progress
05/23/2024Electric vehicle service equipment requirementsPIROOZ SOLTANIZADEHenergy_progress
05/23/2024HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
05/23/2024Subgrade InspectionsPIROOZ SOLTANIZADEHspecial
05/23/2024MasonryPIROOZ SOLTANIZADEHspecial
05/23/2024Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
05/23/2024Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
05/23/2024Structural Cold-Formed SteelPIROOZ SOLTANIZADEHspecial
05/23/2024Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
05/23/2024Structural Steel - DetailsPIROOZ SOLTANIZADEHspecial
05/23/2024Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
05/23/2024Mechanical SystemsPIROOZ SOLTANIZADEHspecial
05/23/2024Heating SystemsPIROOZ SOLTANIZADEHspecial
05/23/2024Footing and FoundationPIROOZ SOLTANIZADEHprogress
05/23/2024Structural Wood FramePIROOZ SOLTANIZADEHprogress
05/23/2024Fire-Resistance Rated ConstructionPIROOZ SOLTANIZADEHprogress
05/23/2024FinalJAN PEREZprogress
05/23/2024Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
05/23/2024PreliminaryPIROOZ SOLTANIZADEHprogress
Latest 25 of 40.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026Q00899342-I1Request digital key ↗
08/24/2026Q00899344-I1Request digital key ↗
08/23/2026Q01023312-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation1
09/27/2023440800144Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/24/2023440800144Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
12/06/2024440800144Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00885166-I1Open ↗
08/13/2026Q00885166-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q00885166-P1Open ↗
08/13/2026Q00885166-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00885166-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026Q00899342-I1Open ↗
08/24/2026Q00899344-I1Open ↗
08/23/2026Q01023312-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00885166-I1Open ↗
09/01/2026Q00885166-I1Open ↗
09/01/2026Q00885166-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00885166-I1Open ↗
09/01/2026Q00885166-I1Open ↗
08/25/2026Q00899330-P1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/24/2023440800144Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/24/2023440800144Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00885166-P1Open ↗
08/13/2026Q00885166-I1Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00885166-P1Open ↗
08/13/2026Q00885166-I1Open ↗
▸BISSTREET TREES SITE PLAN1
10/20/2024440800144Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/27/2023440800144Open ↗
▸BISSTREET TREE CHECKLIST1
09/27/2023440800144Open ↗
▸BISSTREET TREE SIGNOFF1
10/20/2024440800144Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00885166-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00885166-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00885166-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT2
08/13/2026Q00885166-P1Open ↗
08/13/2026Q00885166-I1Open ↗
▸BISBPP: SIDEWALK CONCRETE STRENGTH REPORT1
10/21/2024440800144Open ↗
▸BISBPP: FIELD INSPECTION1
10/21/2024440800144Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00885166-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00885166-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/06/2024440800144Open ↗
▸BISCURB CUT (CC) SIGNOFF1
10/20/2024440800144Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/20/2026Q01196899-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
10/21/2024440800144Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
08/24/2023440800144Open ↗
▸BISADDITIONAL INFORMATION1
09/27/2023440800144Open ↗
▸Other Documents15
▸DOB NOWProperty Ownership Certification2
08/22/2026Q00885166-I1Open ↗
08/22/2026Q00885166-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00885166-I1Open ↗
08/13/2026Q00885166-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00885166-I1Open ↗
08/13/2026Q00885166-P1Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
09/27/2023440800144Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
10/21/2024440800144Open ↗
▸BISNYS DEC TIDAL WETLANDS MAP1
09/27/2023440800144Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
10/21/2024440800144Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/27/2023440800144Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
10/21/2024440800144Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q00885166-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00885166-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00885166-I1Open ↗