← Back
BuildNYC
Two family frame
418 BEACH 44TH STREET
QUEENS · BIN 4818062
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R4-1Zoning
1,380 sfGross Floor Area
2Units
2 Active Violations ▸
Two family frame · Owner of record: 418 Beach 44th Street · 2,169 sf lot · 0.64 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAUDENO VACCHIO solar system installation4p · 1 filing · 15 docs
Floor 31p · 1 filing · 3 docs
Floor 237p · 2 filings · 20 docs
Floor 156p · 2 filings · 20 docs
Site & exteriorProposed 8' high solid plywood construction fence39p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CDR Properties4410/04/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/31/2023$75K—CDR Properties → 418 BEACH 44TH STREET LLC$54/sf building
07/16/2019$75K—ROCKAWAY HOUSING GROUP CORP. → CDR Properties— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Arnold Montag Architect AM/PM Desi1010/02/2026
PR306/16/2025
Engineering Consulting Services101/20/2023
Sideris Kefalas Engineers109/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arnold Montag Architect AM PM Desi603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ocean ContractingGeneral Contractor407/08/2026
Water Works PipingPlumbing407/08/2026
Arnold Montag Architect AM PM DGeneral Contractor203/22/2026
Ocean ContractingScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Engineering Consulting SE20501210/02/2026
Building Lifecycle
All (127)Filed (14)Permit Issued (9)Signed Off (6)Inspection (10)Objection (58)Special Inspection (30)
10/02/2026
Filed — New Building
Detached two family dwelling. two story with cellar (ground floor)
Q00516089-P6
04/02/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PAUL MARINO
04/02/2026
Special inspection requirement — Air barrier — testing
PAUL MARINO
04/02/2026
Special inspection requirement — Air barrier - visual inspection
PAUL MARINO
04/02/2026
Special inspection requirement — Concrete - Cast-In-Place
PAUL MARINO
04/02/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
PAUL MARINO
04/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PAUL MARINO
04/02/2026
Special inspection requirement — Metering
PAUL MARINO
04/02/2026
Special inspection requirement — Insulation placement and R values
PAUL MARINO
04/02/2026
Special inspection requirement — Fenestration air leakage
PAUL MARINO
04/02/2026
Special inspection requirement — Fenestration areas
PAUL MARINO
04/02/2026
Special inspection requirement — Subgrade Inspections
PAUL MARINO
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
04/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
04/02/2026
Special inspection requirement — Lowest Floor Elevation
PAUL MARINO
04/02/2026
Special inspection requirement — Permanent certificate
PAUL MARINO
04/02/2026
Special inspection requirement — Maintenance information
PAUL MARINO
04/02/2026
Special inspection requirement — Interior lighting power
PAUL MARINO
04/02/2026
Special inspection requirement — Electric vehicle service equipment requirements
PAUL MARINO
04/02/2026
Special inspection requirement — Protection of exposed foundation insulation
PAUL MARINO
04/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
12/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/22/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
PAUL MARINO
10/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
10/22/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PAUL MARINO
10/22/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PAUL MARINO
10/22/2025
Special inspection requirement — Lowest Floor Elevation
PAUL MARINO
10/22/2025
Special inspection requirement — Subgrade Inspections
PAUL MARINO
10/22/2025
Special inspection requirement — Concrete - Cast-In-Place
PAUL MARINO
10/22/2025
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
10/01/2025
Filed — New Building
Detached two family dwelling. two story with cellar (ground floor)
Q00516089-P5
08/29/2025
Signed off — Alteration
Installing 4.0kw solar system.
Q01182757-I1
06/18/2025
Permit issued — Solar
Q01182757-I1-SL
06/16/2025
Filed — Alteration
Installing 4.0kw solar system.
Q01182757-P2
05/12/2025
Filed — Alteration
Installing 4.0kw solar system.
Q01182757-P1
04/09/2025
Filed — Alteration
Installing 4.0kw solar system.
Q01182757-I1
12/04/2024
Filed — New Building
Detached two family dwelling. two story with cellar (ground floor)
Q00516089-P4
10/15/2024
Signed off — New Building
Detached two family dwelling. two story with cellar (ground floor)
Q00516089-S1
10/10/2024
Signed off — New Building
Detached two family dwelling. two story with cellar (ground floor)
Q00516089-S4
09/17/2024
Signed off — New Building
Detached two family dwelling. two story with cellar (ground floor)
Q00516089-S2
09/10/2024
Signed off — Alteration
Q08006278-I1
09/04/2024
Signed off — Alteration
temp construction fence
Q00832537-I1
07/09/2024
Permit issued — Foundation
Q00516089-S4-FO
05/31/2024
Filed — New Building
Detached two family dwelling. two story with cellar (ground floor)
Q00516089-P3
04/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2024
Permit issued — Curb Cut
Q00516089-S1-CC
03/15/2024
Filed — New Building
Detached two family dwelling. two story with cellar (ground floor)
Q00516089-P1
01/22/2024
Permit issued — Plumbing
Q00516089-S2-PL
01/22/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
01/16/2024
Permit issued — Plumbing
Q08006278-I1-PL
12/26/2023
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
12/21/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
07/07/2023
Permit issued — Plumbing
Q08006278-I1-PL
07/07/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/07/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/07/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMG Builders/Anm Manage06/18/2025
DOB NOWFoundationSigned-offMG Builders/Anm Manage07/09/2024
DOB NOWCurb CutSigned-offMG Builders/Anm Manage04/01/2024
DOB NOWPlumbingSigned-offSuperior Piping & Mechanical01/22/2024
DOB NOWPlumbingSigned-offSuperior Piping & Mechanical01/16/2024
DOB NOWPlumbingSigned-offSuperior Piping & Mechanical07/07/2023
DOB NOWPlumbingSigned-offSuperior Piping & Mechanical07/03/2023
DOB NOWGeneral ConstructionPermit IssuedMG Builders/Anm Manage05/01/2023
DOB NOWConstruction FenceSigned-offMG Builders/Anm Manage04/03/2023
BISEQISSUEDThree Star Construction12/04/2008
BIS—ISSUEDThree Star Construction12/04/2008
1 project · most recent 10/02/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/02/2026Signed-offWater Works PipingGas, Storm, Water/Sanitary
3 projects · most recent 05/27/2025
General Wiring Lighting
FiledStatusContractorScope
05/27/2025CompleteSafeway Construction—
03/13/2024CompleteSafeway ConstructionGeneral Wiring
07/05/2023CompleteSafeway ConstructionGeneral Wiring, Lighting
1 project · most recent 10/02/2026
FiledStatusContractorScope
10/02/2026Signed-offOcean Contracting1 scope_items
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/22/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
12/26/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
12/21/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
07/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/07/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/07/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 141
DateRequirementInspectorRole
04/02/2026Fenestration areasPAUL MARINOenergy_progress
04/02/2026Air barrier — testing PAUL MARINOenergy_progress
04/02/2026Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
04/02/2026Electric vehicle service equipment requirementsPAUL MARINOenergy_progress
04/02/2026Air barrier - visual inspectionPAUL MARINOenergy_progress
04/02/2026Insulation placement and R valuesPAUL MARINOenergy_progress
04/02/2026Interior lighting powerPAUL MARINOenergy_progress
04/02/2026Maintenance informationPAUL MARINOenergy_progress
04/02/2026MeteringPAUL MARINOenergy_progress
04/02/2026Permanent certificatePAUL MARINOenergy_progress
04/02/2026Lowest Floor ElevationPAUL MARINOprogress
04/02/2026Fire-Resistance Rated ConstructionPAUL MARINOprogress
04/02/2026Energy Code Compliance InspectionsPAUL MARINOprogress
04/02/2026Subgrade InspectionsPAUL MARINOspecial
04/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPAUL MARINOspecial
04/02/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)PAUL MARINOspecial
04/02/2026Fire-Resistant Penetrations and JointsPAUL MARINOspecial
04/02/2026Excavations - Sheeting, Shoring, and BracingPAUL MARINOspecial
04/02/2026Concrete - Cast-In-PlacePAUL MARINOspecial
04/02/2026Fenestration air leakagePAUL MARINOenergy_progress
04/02/2026Protection of exposed foundation insulationPAUL MARINOenergy_progress
10/22/2025Energy Code Compliance InspectionsPAUL MARINOprogress
10/22/2025Fenestration areasPAUL MARINOenergy_progress
10/22/2025Fenestration air leakagePAUL MARINOenergy_progress
10/22/2025Air barrier - visual inspectionPAUL MARINOenergy_progress
Latest 25 of 141.
▾Documents — 262 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/25/2026Q08006278-I1Request digital key ↗
08/25/2026Q00516089-P2Request digital key ↗
08/25/2026Q00516089-S2Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION9
04/18/2025410060623Open ↗
03/17/2025410060623Open ↗
02/25/2025410060623Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION2
12/11/2008410060623Open ↗
12/04/2008410060623Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
12/09/2024440739710Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/06/2022440739710Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram6
08/25/2026Q00516089-P6Open ↗
08/13/2026Q00516089-I1Open ↗
08/13/2026Q00516089-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/25/2026Q00516089-P6Open ↗
08/13/2026Q00516089-I1Open ↗
08/13/2026Q00516089-P4Open ↗
Showing 3 of 4 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
03/21/2023440739710Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications164
▸DOB NOWProgress Inspector Seal & Signature98
09/01/2026Q01182757-I1Open ↗
09/01/2026Q01182757-I1Open ↗
09/01/2026Q01182757-I1Open ↗
Showing 3 of 98 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature40
09/01/2026Q01182757-I1Open ↗
08/30/2026Q00516089-I1Open ↗
08/30/2026Q00516089-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026Q00516089-P3Open ↗
08/25/2026Q00516089-P2Open ↗
08/25/2026Q00516089-S1Open ↗
Showing 3 of 15 on file for this type
▸BISPC FULL REPORT2
02/11/2008410060623Open ↗
01/25/2008410057637Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/11/2008410060623Open ↗
01/25/2008410057637Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/11/2008410060623Open ↗
01/25/2008410057637Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
02/11/2008410060623Open ↗
01/25/2008410057637Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
03/21/2023440739710Open ↗
10/06/2022440739710Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/06/2022440739710Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026Q00516089-P1Open ↗
08/13/2026Q00516089-I1Open ↗
08/13/2026Q00516089-P3Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist6
08/25/2026Q00516089-P3Open ↗
08/25/2026Q00516089-P1Open ↗
08/25/2026Q00516089-P6Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
03/21/2023440739710Open ↗
▸BISSTREET TREE CHECKLIST1
10/06/2022440739710Open ↗
▸BISSTREET TREE SIGNOFF1
11/15/2024440739710Open ↗
▸BISSTREET TREES SITE PLAN1
11/15/2024440739710Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00516089-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
02/11/2008410060623Open ↗
01/25/2008410057637Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports2
▸BISBPP: FIELD INSPECTION1
11/21/2024440739710Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00516089-S4Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS2
02/01/2008410060623Open ↗
01/25/2008410057637Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/18/2024410057637Open ↗
12/17/2024410057637Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
01/23/2020421910043Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/22/2024440739710Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01182757-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction2
11/22/2024440739710Open ↗
11/21/2024440739710Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET1
08/28/2022440739710Open ↗
▸BISADDITIONAL INFORMATION1
12/12/2008410060623Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/06/2022440739710Open ↗
▸BISEFILING COVER SHEET1
01/23/2020421910043Open ↗
▸Other Documents21
▸DOB NOWSite Survey: Initial6
08/25/2026Q00516089-P6Open ↗
08/13/2026Q00516089-P1Open ↗
08/13/2026Q00516089-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/25/2026Q00516089-P6Open ↗
Showing 1 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
11/22/2024440739710Open ↗
11/21/2024440739710Open ↗
03/21/2023440739710Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
11/21/2024440739710Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
11/21/2024440739710Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
11/21/2024440739710Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00516089-I1Open ↗
▸DOB NOWTR5H Test Report1
08/13/2026Q00516089-S4Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q00516089-I1Open ↗