← Back
Elevator cooperative
Grand Sutton
418 EAST 59 STREET · BIN 1072003
💬 Discuss this project
1988Year Built
36Stories
D4Building Class
R10Zoning
129,255 sfGross Floor Area
76Units
LL97 CoveredRent Stabilized15 Open Violations 12 unresolved · 3 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: 418 EAST 59TH ST OWNERS CORP · 8,741 sf lot · 14.79 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 2 docs
Floor 55p · 1 filing · 16 docs
Floor 4
Floor 3
Floor 2Under Construction2p · 1 filing · 12 docs
Floor 1Under Construction2p · 1 filing · 12 docs
BasementUnder Construction2p · 1 filing · 12 docs
Sub-BasementUnder Construction2p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
418 EAST 59TH STREET OWNERS1103/22/2026
418 EAST 59TH STREET103/22/2026
418 E 59 OWNERS CORP103/22/2026
J OUVINA GROUP203/22/2026
RY MANAGEMENT103/21/2026
WW CORINA REALTY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RODNEY LEON ARCHITECTS PLLC307/06/2026
ROCK ARCH ENG CORP107/06/2026
BICALURO ASSOCIATES PC104/21/2026
CHRISTOPHER TEETER311/22/2023
ROYAL ENGINEERING, P.C110/03/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHRISTOPHER TEETER RA603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KNOCKOUT RENOVATIONS SVCSGeneral Contractor409/16/2026
LOSMAN PLBG AND HTG INCPlumbing207/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
LIQUID PLBG & HTNG SCS INPlumbing203/22/2026
AVELLINO, LOUISElectrical103/21/2026
DICKSON, CHARDElectrical103/21/2026
PRUDENT ELECTRIC INCElectrical103/22/2026
ROBERT MARCHISOTTOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAK DESIGN INC.7699107/06/2026
ROCK ARCH ENG CORP7831107/06/2026
ASSURE PROFESSIONAL ENGIN6962311/22/2023
Building Lifecycle
All (96)Filed (9)Permit Issued (5)Signed Off (1)Facade (FISP) (12)Violation (42)Inspection (2)Special Inspection (25)
09/15/2026
Permit issued — General Construction
M01381428-I1-GC
07/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/09/2026
Special inspection requirement — Final
07/06/2026
Filed — Alteration
Facade/Balcony curb, topside and underside repairs, sealant replacement as per plans filed. No change in use egress or occupancy
M01420643-I1
07/06/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING KITCHENS PER PLANS FOR APT. THA. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01381428-P1
07/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/02/2026
Special inspection requirement — Final
04/21/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING KITCHENS PER PLANS FOR APT. THA. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01381428-S3
04/20/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING KITCHENS PER PLANS FOR APT. THA. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01381428-S1
04/20/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING KITCHENS PER PLANS FOR APT. THA. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01381428-I1
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
04/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/06/2026
Special inspection requirement — Maintenance information
04/06/2026
Special inspection requirement — Shutoff dampers
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/01/2026
Special inspection requirement — Mechanical Systems
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/01/2026
Special inspection requirement — Final
11/22/2024
Violation issued (HPD, closed)
I
08/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/2024
Permit issued — General Construction
M00879954-I1-GC
01/31/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/27/2023
Special inspection requirement — Interior lighting power
Christopher Teeter
11/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
11/27/2023
Special inspection requirement — Final
ROMAN MARDAREWICH
11/27/2023
Special inspection requirement — Lighting controls
Christopher Teeter
11/27/2023
Special inspection requirement — Lighting in dwelling units
Christopher Teeter
11/22/2023
Filed — Alteration
INTERIOR RENOVATION AS INDICATED ON THE DRAWINGS.
M00879954-P1
11/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
11/15/2023
Special inspection requirement — Lighting in dwelling units
Christopher Teeter
11/15/2023
Special inspection requirement — Interior lighting power
Christopher Teeter
11/15/2023
Special inspection requirement — Lighting controls
Christopher Teeter
11/15/2023
Special inspection requirement — Final
ROMAN MARDAREWICH
11/13/2023
Permit issued — General Construction
M00879954-I1-GC
11/03/2023
Permit issued — Plumbing
M00879954-S1-PL
10/18/2023
Filed — Alteration
INTERIOR RENOVATION AS INDICATED ON THE DRAWINGS.
M00879954-S1
08/29/2023
Filed — Alteration
INTERIOR RENOVATION AS INDICATED ON THE DRAWINGS.
M00879954-I1
07/23/2023
Cycle 9 facade report signed — SWARMP
04/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/2023
Cycle 9 facade report submitted
02/06/2023
Cycle 9 facade inspection completed
12/25/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/11/2020
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00236274-I1
10/11/2019
Permit issued — Sidewalk Shed
M00236274-I1-SH
10/03/2019
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00236274-I1
09/27/2019
Special inspection requirement — Final
Victor Suben
05/15/2019
Violation issued (ECB, open)
Zoning
10/05/2018
Violation issued (HPD, closed)
I
02/26/2018
Violation issued (ECB, open)
Zoning
02/16/2018
Violation issued (ECB, open)
Construction
02/07/2018
Cycle 8 facade report submitted
01/30/2018
Cycle 8 facade inspection completed
01/25/2018
Cycle 8 facade report signed — SAFE
05/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/02/2015
Cycle 7 facade report submitted
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKNOCKOUT RENOVATIONS SVCS09/15/2026
DOB NOWGeneral ConstructionPermit IssuedKNOCKOUT RENOVATIONS SVCS05/17/2024
DOB NOWGeneral ConstructionPermit IssuedKNOCKOUT RENOVATIONS SVCS11/13/2023
DOB NOWPlumbingPermit IssuedLOSMAN PLBG AND HTG INC11/03/2023
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC10/11/2019
BISPLISSUEDORION PLUMBING & HTG CORP04/13/2016
BISOTISSUEDWELEDON DESIGN INC03/09/2016
BISEQISSUEDEVEREST SCAFFOLDING INC06/15/2010
BISOTISSUEDFOUR SEASONS04/04/2002
BISPLISSUEDNEPTUNE MECHANICAL INC08/06/1999
BISOTISSUEDELJIN CONSTRUC OF NEW YORK07/01/1999
BISEQISSUEDBRIDGEMASTER OF NY INC07/06/1993
1 project · most recent 07/06/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/06/2026Permit IssuedKNOCKOUT RENOVATIONS SVCSHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NLHZ 48,000 BTU · Condensing Unit ×1
PUZ-AK36NLHZ 36,000 BTU · Condensing Unit ×1
2 projects · most recent 07/06/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/06/2026——Gas, Water/Sanitary
11/22/2023Permit IssuedLOSMAN PLBG AND HTG INCGas, Water/Sanitary
4 projects · most recent 08/10/2026
General Wiring
FiledStatusContractorScope
08/10/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
04/11/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
09/27/2023CompletePRUDENT ELECTRIC INC—
09/27/2019CompleteBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
07/09/2026Fire-Resistance Rated Construction—progress
07/09/2026Final—progress
07/02/2026Fire-Resistance Rated Construction—progress
07/02/2026Final—progress
04/06/2026HVAC-R and service water piping design and insulation—energy_progress
04/06/2026Tenant Protection Plan Compliance—special
04/06/2026Energy Code Compliance Inspections—progress
04/06/2026HVAC-R and service water heating system controls—energy_progress
04/06/2026Maintenance information—energy_progress
04/06/2026Shutoff dampers—energy_progress
04/06/2026HVAC-R and service water heating equipment—energy_progress
04/01/2026Mechanical Systems—special
04/01/2026Fire-Resistant Penetrations and Joints—special
04/01/2026Final—progress
11/27/2023Interior lighting powerChristopher Teeterenergy_progress
11/27/2023Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
11/27/2023FinalROMAN MARDAREWICHprogress
11/27/2023Lighting controlsChristopher Teeterenergy_progress
11/27/2023Lighting in dwelling unitsChristopher Teeterenergy_progress
11/15/2023Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
11/15/2023Lighting in dwelling unitsChristopher Teeterenergy_progress
11/15/2023Interior lighting powerChristopher Teeterenergy_progress
11/15/2023Lighting controlsChristopher Teeterenergy_progress
11/15/2023FinalROMAN MARDAREWICHprogress
09/27/2019FinalVictor Subenprogress
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/28/2026M00879954-P1Request digital key ↗
08/28/2026M00879954-I1Request digital key ↗
08/28/2026M00879954-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00236274-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
04/21/2016122692247Open ↗
03/21/2016122692247Open ↗
06/16/2010120383129Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
02/26/2016122692247Open ↗
06/17/2010120383129Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026M00879954-I1Open ↗
08/28/2026M00879954-S1Open ↗
08/28/2026M00879954-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/31/2026M00236274-I1Open ↗
08/31/2026M00879954-P1Open ↗
08/31/2026M00879954-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/26/2016122692247Open ↗
06/17/2010120383129Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/04/2017122692247Open ↗
02/26/2016122692247Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026M00879954-P1Open ↗
08/27/2026M00879954-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/17/2010120383129Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/26/2016122692247Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/26/2016122692247Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026M00236274-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026M01381428-S3Open ↗
08/17/2026M01381428-S1Open ↗
08/17/2026M01381428-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/21/2016122692247Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/17/2010120383129Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/04/2017122692247Open ↗
02/26/2016122692247Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/04/2017122692247Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
02/26/2016122692247Open ↗
06/17/2010120383129Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/04/2017122692247Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/04/2017122692247Open ↗
02/26/2016122692247Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
02/26/2016122692247Open ↗
06/17/2010120383129Open ↗
▸BISADDITIONAL INFORMATION1
09/02/2016122692247Open ↗