← Back
Condo, residential unit, 1-3 unit building (orig. class 1)
418 WEST 144 STREET
MANHATTAN · Hamilton Heights-Sugar Hill · BIN 1060960
💬 Discuss this project
1897Year Built
4Stories
R6Building Class
R6AZoning
2,913 sfGross Floor Area
2Units
0 Open Violations
Condo, residential unit, 1-3 unit building (orig. class 1) · 1,280 sf lot · 2.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Roof9p · 1 filing · 20 docs
Floor 410p · 2 filings · 20 docs
Floor 310p · 2 filings · 20 docs
Floor 23p · 1 filing · 4 docs
Floor 1
Cellar9p · 1 filing · 20 docs
Site & exterior6p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS504/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP102/15/2025
DD DESIGN GROUP INC.709/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMA DESIGNS LLC203/21/2026
DD DESIGN GROUP1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALTER J.GRANDE P & H INCPlumbing307/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor204/09/2026
R.A. SOMERBY INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IRVING B. PRUS6993709/06/2023
Building Lifecycle
All (42)Filed (8)Permit Issued (6)Signed Off (2)Violation (3)Inspection (3)Objection (4)Special Inspection (16)
02/18/2025
Permit issued — Sidewalk Shed
M01178941-I1-SF
02/18/2025
Permit issued — Sidewalk Shed
M01178941-I1-SH
02/15/2025
Filed — Alteration
M01178941-I1
01/26/2024
Signed off — Alteration
M00481832-I1
01/23/2024
Signed off — Alteration
3rd floor: Replace cooking oven, replace sink, dishwasher in Kitchen.... 4th floor: Replace lavatory, toilet, washer + new shower in existing bath room..H.V.A.C on roof Construction application # M00481832
M00481835-I1
09/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IRVING PRUS
09/20/2023
Special inspection requirement — Energy Code Compliance Inspections
IRVING PRUS
09/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
IRVING PRUS
09/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
IRVING PRUS
09/13/2023
Objection raised — Other
09/13/2023
Objection resolved — Addressed
09/06/2023
Filed — Alteration
3rd floor: Replace cooking oven, replace sink, dishwasher in Kitchen.... 4th floor: Replace lavatory, toilet, washer + new shower in existing bath room..H.V.A.C on roof Construction application # M00481832
M00481835-P5
09/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
IRVING PRUS
09/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IRVING PRUS
09/06/2023
Special inspection requirement — Energy Code Compliance Inspections
IRVING PRUS
09/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
IRVING PRUS
06/27/2023
Filed — Alteration
3rd floor: Replace cooking oven, replace sink, dishwasher in Kitchen.... 4th floor: Replace lavatory, toilet, washer + new shower in existing bath room..H.V.A.C on roof Construction application # M00481832
M00481835-P4
06/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
IRVING PRUS
06/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IRVING PRUS
06/27/2023
Special inspection requirement — Energy Code Compliance Inspections
IRVING PRUS
06/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
IRVING PRUS
06/01/2023
Filed — Alteration
3rd floor: Replace cooking oven, replace sink, dishwasher in Kitchen.... 4th floor: Replace lavatory, toilet, washer + new shower in existing bath room..H.V.A.C on roof Construction application # M00481832
M00481835-P3
11/29/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Admin
09/09/2022
Filed — Alteration
3rd floor: Replace cooking oven, replace sink, dishwasher in Kitchen.... 4th floor: Replace lavatory, toilet, washer + new shower in existing bath room..H.V.A.C on roof Construction application # M00481832
M00481835-P2
09/01/2022
Permit issued — Plumbing
M00481835-I1-PL
03/07/2022
Filed — Alteration
3rd floor: Replace cooking oven, replace sink, dishwasher in Kitchen.... 4th floor: Replace lavatory, toilet, washer + new shower in existing bath room..H.V.A.C on roof Construction application # M00481832
M00481835-P1
03/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
IRVING PRUS
03/07/2022
Special inspection requirement — Energy Code Compliance Inspections
IRVING PRUS
03/07/2022
Special inspection requirement — HVAC-R and service water heating equipment
IRVING PRUS
03/07/2022
Special inspection requirement — HVAC-R and service water heating system controls
IRVING PRUS
09/23/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/17/2021
Permit issued — Plumbing
M00481835-I1-PL
07/14/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/14/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/29/2021
Permit issued — Plumbing
M00481835-I1-PL
06/16/2021
Permit issued — General Construction
M00481832-I1-GC
03/14/2021
Filed — Alteration
M00481832-I1
03/14/2021
Filed — Alteration
3rd floor: Replace cooking oven, replace sink, dishwasher in Kitchen.... 4th floor: Replace lavatory, toilet, washer + new shower in existing bath room..H.V.A.C on roof Construction application # M00481832
M00481835-I1
06/28/2006
Violation issued (ECB, closed)
Plumbing
09/11/1987
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/11/1987
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS02/18/2025
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS02/18/2025
DOB NOWPlumbingSigned-offWALTER J.GRANDE P & H INC09/01/2022
DOB NOWPlumbingSigned-offWALTER J.GRANDE P & H INC09/17/2021
DOB NOWPlumbingSigned-offWALTER J.GRANDE P & H INC06/29/2021
DOB NOWGeneral ConstructionSigned-offRA SOMERBY06/16/2021
BISPLISSUEDROCCO FANELLI03/22/2004
BIS—ISSUEDFOOTPRINT BUILDERS CORP03/17/2004
1 project · most recent 02/17/2025
FiledStatusContractorScope
02/17/2025Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/23/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/14/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/14/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
09/20/2023Fire-Resistant Penetrations and JointsIRVING PRUSspecial
09/20/2023Energy Code Compliance InspectionsIRVING PRUSprogress
09/20/2023HVAC-R and service water heating system controlsIRVING PRUSenergy_progress
09/20/2023HVAC-R and service water heating equipmentIRVING PRUSenergy_progress
09/06/2023HVAC-R and service water heating equipmentIRVING PRUSenergy_progress
09/06/2023Fire-Resistant Penetrations and JointsIRVING PRUSspecial
09/06/2023Energy Code Compliance InspectionsIRVING PRUSprogress
09/06/2023HVAC-R and service water heating system controlsIRVING PRUSenergy_progress
06/27/2023HVAC-R and service water heating system controlsIRVING PRUSenergy_progress
06/27/2023Fire-Resistant Penetrations and JointsIRVING PRUSspecial
06/27/2023Energy Code Compliance InspectionsIRVING PRUSprogress
06/27/2023HVAC-R and service water heating equipmentIRVING PRUSenergy_progress
03/07/2022Fire-Resistant Penetrations and JointsIRVING PRUSspecial
03/07/2022Energy Code Compliance InspectionsIRVING PRUSprogress
03/07/2022HVAC-R and service water heating equipmentIRVING PRUSenergy_progress
03/07/2022HVAC-R and service water heating system controlsIRVING PRUSenergy_progress
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/04/2026M00481832-I1Request digital key ↗
09/04/2026M00481835-P1Request digital key ↗
09/04/2026M00481835-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
09/04/2026M00481835-I1Open ↗
09/04/2026M00481835-P4Open ↗
09/04/2026M00481835-P3Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026M00481835-P4Open ↗
09/01/2026M00481835-P4Open ↗
09/01/2026M00481835-P4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/04/2026M00481832-I1Open ↗
09/04/2026M00481835-P2Open ↗
09/04/2026M00481835-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00481835-P4Open ↗
08/26/2026M00481835-P5Open ↗
08/25/2026M00481835-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/04/2026M00481832-I1Open ↗
09/04/2026M00481835-P1Open ↗
09/04/2026M00481835-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00481835-I1Open ↗
08/13/2026M00481832-I1Open ↗