← Back
BuildNYC
Two family frame
4187 RICHMOND AVENUE
STATEN ISLAND · BIN 5068053
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R3AZoning
1,965 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · 3,508 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Prop. Two - Family Residences7p · 1 filing · 20 docs
Floor 1Prop. Two - Family Residences11p · 2 filings · 20 docs
BasementProp. Two - Family Residences6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Belair Ridge Development1207/08/2026
SI NY Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect301/22/2024
William Montague Engineering105/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patricia L Gass603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Beyer ConstructionScaffold407/08/2026
Beyer ConstructionGeneral Contractor307/08/2026
Duo Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738103/08/2023
Building Lifecycle
06/19/2024
Signed off — New Building
TWO-FAMILY DETACHED RESIDENCE WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS & AN ACCESSORY DETACHED ONE CAR GARAGE FILED UNDER A SEPARATE APPLICATION.
S08010954-S2
06/19/2024
Signed off — New Building
TWO-FAMILY DETACHED RESIDENCE WITH ACCESSORY OFF-STREET PARKING FOR TWO CARS & AN ACCESSORY DETACHED ONE CAR GARAGE FILED UNDER A SEPARATE APPLICATION.
S08010954-S3
06/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/17/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/10/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
54 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBeyer Construction05/24/2024
DOB NOWConstruction FenceSigned-offBeyer Construction04/18/2024
DOB NOWPlumbingSigned-offDuo Plumbing & Heating09/22/2023
DOB NOWConstruction FenceSigned-offBeyer Construction09/12/2023
DOB NOWGeneral ConstructionPermit IssuedBeyer Construction05/31/2023
DOB NOWConstruction FenceSigned-offBeyer Construction05/31/2022
BIS—ISSUEDHusic06/23/2022
1 project · most recent 01/22/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/22/2024Signed-offDuo Plumbing & HeatingGas, Storm, Water/Sanitary
1 project · most recent 01/03/2024
General Wiring
FiledStatusContractorScope
01/03/2024CompleteLaser Lite Elect'lGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/17/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
06/10/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/26/2023Pass-Final PL - UndergroundPassView ↗
10/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
05/01/2023Meteringanthony santoroenergy_progress
09/28/2022Concrete - Cast-In-Placeanthony santorospecial
09/28/2022Fire-Resistant Penetrations and Jointsanthony santorospecial
09/28/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
09/28/2022Subgrade Inspectionsanthony santorospecial
09/28/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/28/2022Protection of exposed foundation insulationanthony santoroenergy_progress
09/28/2022Duct leakage testing, insulation and designanthony santoroenergy_progress
09/28/2022Ventilation and air distribution systemanthony santoroenergy_progress
09/28/2022Fenestration areasanthony santoroenergy_progress
09/28/2022Energy Code Compliance Inspectionsanthony santoroprogress
09/28/2022Fire-Resistance Rated Constructionanthony santoroprogress
09/28/2022Structural Wood Frameanthony santoroprogress
09/28/2022HVAC-R and service water heating equipmentanthony santoroenergy_progress
09/28/2022Electric vehicle service equipment requirementsanthony santoroenergy_progress
09/28/2022Interior lighting poweranthony santoroenergy_progress
09/28/2022HVAC-R and service water heating system controlsanthony santoroenergy_progress
09/28/2022Air barrier — testing anthony santoroenergy_progress
09/28/2022Fenestration air leakageanthony santoroenergy_progress
09/28/2022Maintenance informationanthony santoroenergy_progress
09/28/2022HVAC-R and service water piping design and insulationanthony santoroenergy_progress
09/28/2022Air barrier - visual inspectionanthony santoroenergy_progress
09/28/2022Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
09/28/2022Permanent certificateanthony santoroenergy_progress
09/28/2022Insulation placement and R valuesanthony santoroenergy_progress
Latest 25 of 28.
63 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account