Elevator apt, converted
419 DEGRAW STREET
BROOKLYN · BIN 3336100
💬 Discuss this project
1931Year Built
7Stories
D5Building Class
R6BZoning
76,334 sfGross Floor Area
90Units
LL97 CoveredRent Stabilized11 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, converted · Owner of record: 421 DEGRAW ST · 34,980 sf lot · 2.18 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHEEVER DEVELOPMENT1607/08/2026
421 DEGRAW STREET LLC303/22/2026
421 DEGRAW403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GAMILL ENGINEERING, P.C605/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING P C1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G.N.T. MECHANICAL LLCPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GAMILL ENGINEERING, P.C.1773505/08/2025
Building Lifecycle
All (109)Filed (6)Permit Issued (4)Signed Off (2)Facade (FISP) (9)Violation (60)Inspection (6)Special Inspection (22)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2025
Signed off — Alteration
Filing for gas piping in conjunction with boiler applications, install two hot water storage tanks, and associated piping.
B01035021-S1
06/11/2025
Signed off — Alteration
Filing for gas piping in conjunction with boiler applications, install two hot water storage tanks, and associated piping.
B01035021-I1
05/27/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/08/2025
Filed — Alteration
Filing for gas piping in conjunction with boiler applications, install two hot water storage tanks, and associated piping.
B01035021-P3
05/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GAMILL
05/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
JACK GAMILL
05/08/2025
Special inspection requirement — Heating Systems
JACK GAMILL
05/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
JACK GAMILL
05/08/2025
Special inspection requirement — Maintenance information
JACK GAMILL
05/08/2025
Special inspection requirement — Permanent certificate
JACK GAMILL
05/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
JACK GAMILL
05/06/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/05/2025
Special inspection requirement — Maintenance information
JACK GAMILL
05/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
JACK GAMILL
05/05/2025
Special inspection requirement — Permanent certificate
JACK GAMILL
05/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
JACK GAMILL
05/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GAMILL
05/05/2025
Special inspection requirement — Heating Systems
JACK GAMILL
04/21/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/14/2025
Filed — Alteration
Filing for gas piping in conjunction with boiler applications, install two hot water storage tanks, and associated piping.
B01035021-P2
04/01/2025
Permit issued — Boiler Equipment
B01035021-S1-BE
04/01/2025
Permit issued — Plumbing
B01035021-I1-PL
01/28/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/08/2024
Filed — Alteration
Filing for gas piping in conjunction with boiler applications, install two hot water storage tanks, and associated piping.
B01035021-P1
05/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/02/2024
Permit issued — Boiler Equipment
B01035021-S1-BE
05/01/2024
Permit issued — Plumbing
B01035021-I1-PL
04/17/2024
Filed — Alteration
Filing for gas piping in conjunction with boiler applications, install two hot water storage tanks, and associated piping.
B01035021-S1
04/17/2024
Filed — Alteration
Filing for gas piping in conjunction with boiler applications, install two hot water storage tanks, and associated piping.
B01035021-I1
04/17/2024
Filed — Alteration
Filing for gas piping in conjunction with boiler applications, install two hot water storage tanks, and associated piping.
B01035021-S3
04/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
JACK GAMILL
04/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GAMILL
04/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GAMILL
04/15/2024
Special inspection requirement — Permanent certificate
JACK GAMILL
04/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GAMILL
04/15/2024
Special inspection requirement — Heating Systems
JACK GAMILL
04/15/2024
Special inspection requirement — Maintenance information
JACK GAMILL
07/21/2023
Violation issued (HPD, closed)
C
07/21/2023
Violation issued (HPD, closed)
B
07/21/2023
Violation issued (HPD, closed)
B
12/15/2021
Violation issued (ECB, closed)
Construction
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/18/2021
Violation issued (ECB, closed)
Construction
10/27/2020
Cycle 9 facade report submitted
10/07/2020
Cycle 9 facade report signed — SAFE
10/06/2020
Cycle 9 facade inspection completed
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/22/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/05/2017
Cycle 8 facade report signed — SWARMP
06/19/2017
Violation issued (HPD, closed)
A
02/21/2017
Cycle 8 facade report submitted
02/16/2017
Cycle 8 facade inspection completed
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offG.N.T. MECHANICAL LLC04/01/2025
DOB NOWPlumbingSigned-offG.N.T. MECHANICAL LLC04/01/2025
DOB NOWBoiler EquipmentSigned-offG.N.T. MECHANICAL LLC05/02/2024
DOB NOWPlumbingSigned-offG.N.T. MECHANICAL LLC05/01/2024
BISOTISSUEDGUAYACOS CORP10/17/2020
BISBLISSUEDG.N.T. MECHANICAL, LLC10/16/2006
BISBLISSUEDG.N.T. MECHANICAL, LLC11/29/2005
BIS—ISSUED421 DEGRAW LLC08/17/1999
BIS—ISSUED421 DEGRAW LLC05/05/1999
BISPLISSUEDBAY RIDGE MECHANICAL CORP12/14/1998
BIS—ISSUED421 DEGRAW LLC05/21/1998
1 project · most recent 05/08/2025
Gas
FiledStatusContractorScope
05/08/2025Signed-offG.N.T. MECHANICAL LLCGas
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2025Pass-Final Boiler Equipment InspectionPassView ↗
04/21/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/28/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
05/08/2025HVAC-R and service water piping design and insulationJACK GAMILLenergy_progress
05/08/2025Tenant Protection Plan ComplianceJACK GAMILLspecial
05/08/2025Heating SystemsJACK GAMILLspecial
05/08/2025HVAC-R and service water heating system controlsJACK GAMILLenergy_progress
05/08/2025Maintenance informationJACK GAMILLenergy_progress
05/08/2025Permanent certificateJACK GAMILLenergy_progress
05/08/2025HVAC-R and service water heating equipmentJACK GAMILLenergy_progress
05/05/2025Tenant Protection Plan Compliance—special
05/05/2025Maintenance informationJACK GAMILLenergy_progress
05/05/2025HVAC-R and service water heating system controlsJACK GAMILLenergy_progress
05/05/2025Permanent certificateJACK GAMILLenergy_progress
05/05/2025HVAC-R and service water heating equipmentJACK GAMILLenergy_progress
05/05/2025HVAC-R and service water piping design and insulationJACK GAMILLenergy_progress
05/05/2025Heating SystemsJACK GAMILLspecial
05/07/2024Tenant Protection Plan Compliance—special
04/17/2024Tenant Protection Plan ComplianceJACK GAMILLspecial
04/15/2024HVAC-R and service water piping design and insulationJACK GAMILLenergy_progress
04/15/2024HVAC-R and service water heating system controlsJACK GAMILLenergy_progress
04/15/2024Permanent certificateJACK GAMILLenergy_progress
04/15/2024HVAC-R and service water heating equipmentJACK GAMILLenergy_progress
04/15/2024Heating SystemsJACK GAMILLspecial
04/15/2024Maintenance informationJACK GAMILLenergy_progress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B01035021-S3Request digital key ↗
08/25/2026B01035021-S1Request digital key ↗
08/25/2026B01035021-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
05/12/2020340728430Open ↗
▸BISWORK PERMIT APPLICATION1
10/17/2020340728430Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026B01035021-P1Open ↗
08/25/2026B01035021-S1Open ↗
08/25/2026B01035021-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01035021-S1Open ↗
09/01/2026B01035021-S1Open ↗
08/23/2026B01035021-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B01035021-S1Open ↗
08/23/2026B01035021-P3Open ↗
08/23/2026B01035021-S3Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/12/2020340728430Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/12/2020340728430Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/12/2020340728430Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
05/12/2020340728430Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026B01035021-I1Open ↗
08/25/2026B01035021-P3Open ↗
08/25/2026B01035021-P2Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B01035021-S1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/05/2020340728430Open ↗
10/17/2020340728430Open ↗
05/12/2020340728430Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/04/2020340728430Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
12/04/2020340728430Open ↗
11/05/2020340728430Open ↗
10/23/2020340728430Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
05/12/2020340728430Open ↗