DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
ECB09/27/2024FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 30000816416Y0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT.1RCNY 103-01(D)(1)REQUIRES THAT AN ANNUAL INSPECTION REPORT FORNothing owed — awaiting certificate of correction
ECB10/28/2014B101,50A. 50A-NO WORK PERMIT FILED WITH DOB FOR THE CROWN GAS FIRED HW BOILER.Nothing owed — awaiting certificate of correction
ECB10/28/2014B154,4A,19B,36,5A,50A,50B,50C,50D. 50A-NO EMERGENCE FUEL CUT OFF SWITCH OUTSIDE OF BOILER ROOM DOOR; 50B-RELOCATE SAFETY RELIEF VALVE AND PIPE AND PIPE UP RIGHT; 50C-FUSEABLE LINK FIRE DAMPER WITH FRESH AIR INTNothing owed — awaiting certificate of correction