Office with commercial, 7-19 stories
419 LAFAYETTE STREET
MANHATTAN · BIN 1008773
💬 Discuss this project
1894Year Built
8Stories
O6Building Class
M1-5/R9AZoning
57,729 sfGross Floor Area
6Units
LL97 Covered5 Open Violations 3 unresolved · 2 paperwork only ▸FISP: No Report Filed
Office with commercial, 7-19 stories · Owner of record: AKJO-26 DELAWARE LLC · 8,062 sf lot · 7.16 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Floor 87p · 4 filings · 20 docs
Floor 72p · 4 filings · 8 docs
Floor 61 filing · 2 docs
Floor 51 filing · 2 docs
Floor 41 filing · 2 docs
Floor 31 filing · 2 docs
Floor 21p · 2 filings · 5 docs
Floor 11 filing · 2 docs
Cellar3p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
460-26 BROOME STR2509/02/2026
AKJO-26 MANAGEMENT7307/08/2026
TOPLINE NYC CONTRACTING303/22/2026
AKJO-26 DELAWARE LLC103/22/2026
OWNER OF 419 LAFAYETTE ST203/22/2026
MICHAEL BAUM LLC AKJO-26 MANAGEM1503/21/2026
466-26 SOHO603/21/2026
MICHAEL BAUM LLC C O ICON REALTY203/21/2026
AKJO 419-26303/21/2026
419 LAFAYETTE STREET303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HN REPUBLIC2403/21/2026
BUILDING VIOLATION SOLUTIONS1403/21/2026
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
KUSHNER STUDIOS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RGJ CONSTRUCTION INCGeneral Contractor404/08/2026
WORLD HUB CONSTRUCTION INGeneral Contractor403/21/2026
TOPLINE NYC CONTRACTINGGeneral Contractor303/21/2026
PACIFIC PLBG&HTG CORPPlumbing307/08/2026
JAVIER VALERA ACEROElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EMTG CONSULTANTS4222211/24/2025
IP CONCRETE TESTING AND I6252405/16/2025
AZARK INC8507203/11/2025
RYAN SPECIAL ENGINEERING2018112/19/2022
Building Lifecycle
All (189)Filed (23)Permit Issued (9)Signed Off (8)Facade (FISP) (11)Violation (60)Inspection (9)Objection (52)Special Inspection (17)
08/18/2026
Objection raised — Scope
08/05/2026
Violation issued (ECB, open)
Construction
07/31/2026
Filed — Alteration
MINOR INTERIOR RENOVATION TO UPGRADE THE KITCHEN, ADD A BATHROOM AND DO MINOR PATIONS WORK, NO CHANGE OF OCCUPANCY OR MEANS OF EGRESS.
M01429357-I1
07/10/2026
Special inspection requirement — Final
05/07/2026
Signed off — Alteration
Interior renovation in Cellar to add two bathrooms, no change in Occupancy or egress
M01158345-I1
05/07/2026
Signed off — Alteration
Filing Plumbing application to add bathrooms in the Cellar
M01158372-I1
04/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/23/2026
Objection resolved — Addressed
03/06/2026
Objection resolved — Addressed
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahram Lotfi
03/06/2026
Special inspection requirement — Final
Shahram Lotfi
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahram Lotfi
03/04/2026
Objection resolved — Addressed
02/22/2026
Objection resolved — Addressed
02/18/2026
Objection raised — Other
02/18/2026
Objection raised — Other
02/17/2026
Filed — No Work
M01360237-I1
12/17/2025
Objection raised — Scope
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/15/2025
Objection raised — Other
12/15/2025
Objection raised — Other
12/15/2025
Objection raised — Other
12/10/2025
Objection raised — Cost
12/10/2025
Objection raised — Scope
12/09/2025
Filed — No Work
M01330124-I1
11/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/24/2025
Filed — Alteration
Interior renovation in Cellar to add two bathrooms, no change in Occupancy or egress
M01158345-P1
11/24/2025
Filed — Alteration
Filing Plumbing application to add bathrooms in the Cellar
M01158372-P1
11/21/2025
Filed — Alteration
M01315177-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/30/2025
Signed off — Alteration
INTERIOR RENOVATION A7TH FLOOR LEVEL TO ADD A BREAK ROOM WITH REMOVE PARTIONS, MOVING BATHROOM PLUMBING FIXTURES, NO CHANGE OF USE AND EXIT
M01208856-I1
10/30/2025
Signed off — Alteration
INTERIOR RENOVATION A7TH FLOOR LEVEL TO ADD A BREAK ROOM WITH REMOVE PARTIONS, NO CHANGE OF USE AND EXIT
M01205725-I1
10/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/15/2025
Permit issued — Plumbing
M01158372-I1-PL
08/22/2025
Signed off — Alteration
PLUMBING WORK INDICATED AS PER PLANS. NO CHANGE IN USE, OCCUNPANY OR EGRESS.
M08052079-I1
08/22/2025
Signed off — Alteration
ARCHITECTURAL MODIFICATIONS TO EXISTING ART STUDIO AS PERPLANS. MINOR CHANGE TO EGRESS, NO CHANGE TO USE OR OCCUPANCY.
M08049942-I1
08/21/2025
Objection resolved — Addressed
08/18/2025
Objection raised — Zoning
08/15/2025
Filed — No Work
M01272117-I1
08/14/2025
Objection resolved — Addressed
07/30/2025
Permit issued — General Construction
M01158345-I1-GC
07/29/2025
Permit issued — General Construction
M01205725-I1-GC
07/10/2025
Permit issued — Plumbing
M01208856-I1-PL
07/08/2025
Objection resolved — Addressed
07/08/2025
Objection resolved — Addressed
06/23/2025
Filed — Alteration
INTERIOR RENOVATION A7TH FLOOR LEVEL TO ADD A BREAK ROOM WITH REMOVE PARTIONS, MOVING BATHROOM PLUMBING FIXTURES, NO CHANGE OF USE AND EXIT
M01208856-I1
06/12/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
05/25/2025
Filed — Alteration
INTERIOR RENOVATION A7TH FLOOR LEVEL TO ADD A BREAK ROOM WITH REMOVE PARTIONS, NO CHANGE OF USE AND EXIT
M01205725-P1
05/16/2025
Filed — Alteration
ARCHITECTURAL MODIFICATIONS TO EXISTING ART STUDIO AS PERPLANS. MINOR CHANGE TO EGRESS, NO CHANGE TO USE OR OCCUPANCY.
M08049942-P2
05/16/2025
Objection resolved — Addressed
05/16/2025
Objection resolved — Addressed
Latest 60 of 189 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPACIFIC PLBG&HTG CORP09/15/2025
DOB NOWGeneral ConstructionSigned-offRGJ CONSTRUCTION INC07/30/2025
DOB NOWGeneral ConstructionSigned-offRGJ CONSTRUCTION INC07/29/2025
DOB NOWPlumbingSigned-offPACIFIC PLBG&HTG CORP07/10/2025
DOB NOWBoiler EquipmentSigned-offNEW YORK HEATING CORP05/07/2024
DOB NOWGeneral ConstructionSigned-offWORLD HUB CONSTRUCTION IN05/25/2023
DOB NOWGeneral ConstructionSigned-offWORLD HUB CONSTRUCTION IN03/07/2023
DOB NOWPlumbingSigned-offPACIFIC PLBG&HTG CORP02/21/2023
DOB NOWSupported ScaffoldPermit IssuedTOPLINE NYC CONTRACTING12/05/2019
BISOTISSUEDPREMIER CLEANING PRO SOL05/23/2019
BISPLISSUEDENA PLUMBING CORP05/23/2019
BISPLISSUEDENA PLUMBING CORP02/27/2019
BISMHISSUEDALLIED MECHANICAL COOLING01/03/2019
BISOTISSUEDHONGTAI CONSTRUCTION INC12/17/2018
BIS—ISSUEDA. BONADUCE, INC07/13/2018
BISPLISSUEDENA PLUMBING CORP02/21/2017
BISSPISSUEDONE-TWO-THREE STAGES CORP02/21/2017
BISOTISSUEDCOCO CONSTRUCTION INC02/13/2017
BISBLISSUEDALIENT PLBG & HTG INC08/11/2016
BISMHISSUEDWESBUILT CONSTRUCTION MAN03/21/2016
BISOTISSUEDWESBUILT CONSTRUCTION MAN03/21/2016
BISMHISSUEDWESBUILT CONSTRUCTION MAN03/21/2016
BISOTISSUEDWESBUILT CONSTRUCTION MAN03/18/2016
BISSPISSUEDUNIVERSAL FIRE SPR LLC03/18/2016
BISPLISSUEDMETROTECH MECHANICAL CORP03/09/2016
BIS—ISSUEDFRAMEMASTERS INC03/09/2016
BISOTISSUEDWESBUILT CONSTRUCTION MAN03/08/2016
BISMHISSUEDWESBUILT CONSTRUCTION MAN03/08/2016
BISPLISSUEDBEDROCK PLBG. & HTG., INC02/09/2016
BISMHISSUEDVANGUARD CONSTRUCTION AND02/02/2016
BISOTISSUEDVANGUARD CONSTRUCTION AND02/02/2016
BISPLISSUEDSHAW MECHANICAL INC01/11/2016
BISSPISSUEDCASE PLUMBING LLC09/01/2015
BISPLISSUED24 SEVEN PLUMBING INC08/21/2015
BISMHISSUEDWESBUILT CONSTRUCTION MAN08/14/2015
BISOTISSUEDWESBUILT CONSTRUCTION MAN08/14/2015
BISOTISSUEDONE-TWO-THREE STAGES CORP07/16/2015
BISPLISSUEDENA PLUMBING CORP07/16/2015
BISBLISSUEDALIENT PLBG & HTG INC11/12/2014
BISPLISSUEDENA PLUMBING CORP09/22/2014
+ 19 more permits on file
1 project · most recent 04/30/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/30/2025——Heating and Air Conditioning Systems
Heat / Cool
Lg ARUN060GSS4 64,000 BTU · Vrf Outdoor ×1
1 project · most recent 11/24/2025
Water/Sanitary
FiledStatusContractorScope
11/24/2025Signed-offPACIFIC PLBG&HTG CORPWater/Sanitary
2 projects · most recent 09/17/2019
General Wiring
FiledStatusContractorScope
09/17/2019CompleteM.C. ELECTRICAL NY INCGeneral Wiring
03/27/2019Permit IssuedA & S ELECTRIC INC.General Wiring
1 project · most recent 12/02/2019
Scaffold
FiledStatusContractorScope
12/02/2019Permit IssuedTOPLINE NYC CONTRACTINGScaffold
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/30/2024Pass-Final Boiler Equipment InspectionPassView ↗
06/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
07/10/2026Final—progress
03/06/2026Fire-Resistant Penetrations and JointsShahram Lotfispecial
03/06/2026FinalShahram Lotfiprogress
03/06/2026Energy Code Compliance InspectionsShahram Lotfiprogress
05/14/2025Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
05/14/2025FinalALLEN AZARKIANprogress
05/14/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
03/19/2025Fire-Resistant Penetrations and JointsALLEN AZARKIANspecial
11/14/2024Fire-Resistant Penetrations and JointsALLEN AZARKIANspecial
11/13/2024Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
11/13/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
06/12/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
06/12/2023FinalNAVEEN KUMARprogress
06/12/2023Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
05/30/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
05/30/2023FinalNAVEEN KUMARprogress
05/30/2023Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
▾Documents — 709 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch15
09/02/2026M00684544-I1Request digital key ↗
09/02/2026M00684544-P1Request digital key ↗
08/27/2026M01041254-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly4
08/26/2026M01113593-I1Request digital key ↗
08/22/2026M01272117-I1Request digital key ↗
08/14/2026M01360237-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00267663-I1Request digital key ↗
▸Applications & Permits146
▸BISPLAN / WORK APPROVAL APPLICATION81
02/25/2025123678056Open ↗
02/25/2025122465554Open ↗
08/26/2024123591087Open ↗
Showing 3 of 81 on file for this type
▸BISWORK PERMIT APPLICATION49
05/23/2019123678056Open ↗
05/23/2019123678056Open ↗
03/15/2019123591087Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWLPC Approval/Permit15
09/02/2026M00684544-I1Open ↗
08/20/2026M01158372-I1Open ↗
08/13/2026M01158393-I1Open ↗
Showing 3 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/08/2018122022060Open ↗
▸Seals & Professional Certifications147
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION64
02/14/2019123678056Open ↗
12/17/2018123591087Open ↗
11/20/2018122022060Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/02/2026M00684544-I1Open ↗
08/26/2026M01113593-I1Open ↗
08/24/2026M08049942-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST19
02/14/2019123678056Open ↗
12/17/2018123591087Open ↗
Showing 2 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT19
02/14/2019123678056Open ↗
12/17/2018123591087Open ↗
02/10/2017140585622Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026M01158345-I1Open ↗
09/01/2026M01158345-I1Open ↗
09/01/2026M08049942-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/28/2026M08052079-P1Open ↗
09/01/2026M01158345-I1Open ↗
09/01/2026M08049942-P2Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
02/10/2017140585622Open ↗
02/03/2017140586293Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
02/10/2017140585622Open ↗
02/03/2017140586293Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment82
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE28
02/14/2019123678056Open ↗
12/17/2018123591087Open ↗
Showing 2 of 28 on file for this type
▸BISSELF-CERT PLUMBING NOTICE17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISEQUIPMENT USE PERMITS12
12/01/2016122683060Open ↗
07/29/2016122566268Open ↗
07/29/2016122566268Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
12/01/2016122683060Open ↗
12/01/2016122683060Open ↗
07/29/2016122566268Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING6
02/10/2017140585622Open ↗
Showing 1 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
03/16/2020122689929Open ↗
03/28/2017122677790Open ↗
03/27/2017122677790Open ↗
Showing 3 of 4 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/25/2018122022060Open ↗
▸Environmental & Asbestos41
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
08/05/2021122079552Open ↗
02/10/2017140585622Open ↗
02/03/2017140586293Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/02/2026M00684544-I1Open ↗
08/24/2026M08049942-P2Open ↗
08/24/2026M08049942-P1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance45
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS23
02/14/2019123678056Open ↗
12/17/2018123591087Open ↗
12/08/2016122683060Open ↗
Showing 3 of 23 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
03/15/2022140586293Open ↗
03/15/2022121826462Open ↗
07/08/2021122079552Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
03/15/2022121826462Open ↗
02/14/2022121826462Open ↗
02/14/2022121826462Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
02/10/2017140585622Open ↗
02/03/2017140586293Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
01/02/2019122022060Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY24
04/12/2022121826462Open ↗
04/12/2022121826462Open ↗
04/12/2022121826462Open ↗
Showing 3 of 24 on file for this type
▸BISSTRUCTURAL STEEL - WELDING1
04/12/2022121826462Open ↗
▸Approvals, Objections & Sign-offs63
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
05/17/2022103030131Open ↗
04/05/2022140586293Open ↗
03/21/2022121830386Open ↗
Showing 3 of 31 on file for this type
▸BISLANDMARKS APPROVAL15
04/23/2018122022060Open ↗
02/10/2017140585622Open ↗
02/03/2017140586293Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
02/14/2019123678056Open ↗
12/17/2018123591087Open ↗
Showing 2 of 5 on file for this type
▸BISLANDMARKS SIGNOFF4
03/21/2022121830386Open ↗
03/14/2022103030131Open ↗
09/23/2021104020220Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
01/15/2019122022060Open ↗
Showing 1 of 3 on file for this type
▸BISFINAL2
07/20/2022122465554Open ↗
03/02/2022121830386Open ↗
▸Cost, Insurance & Ownership57
▸BISCOST AFFIDAVIT53
03/15/2022121826462Open ↗
03/15/2022103030131Open ↗
02/14/2022121826462Open ↗
Showing 3 of 53 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
07/21/2022122465554Open ↗
04/12/2022121826462Open ↗
03/02/2022121830386Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
02/13/2017140586293Open ↗
▸Filing & Intake Forms68
▸BISEFILING COVER SHEET29
02/14/2019123678056Open ↗
12/17/2018123591087Open ↗
Showing 2 of 29 on file for this type
▸BISADDITIONAL INFORMATION24
02/05/2019122022060Open ↗
01/22/2019122022060Open ↗
01/02/2019122022060Open ↗
Showing 3 of 24 on file for this type
▸BISBOROUGH INTAKE FORM9
01/28/2020122002322Open ↗
01/22/2020122002322Open ↗
01/15/2019122022060Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
02/10/2017140585622Open ↗
02/03/2017140586293Open ↗
Showing 2 of 6 on file for this type
▸Other Documents14
▸DOB NOWProof of Historic Building7
09/02/2026M00684544-I1Open ↗
08/13/2026M08052079-I1Open ↗
08/13/2026M08049942-P2Open ↗
Showing 3 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISECCCNYS ANALYSIS2
05/11/2018122022060Open ↗
02/10/2017140585622Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type