← Back
Special condominium billing lot
419 MANHATTAN AVE
BROOKLYN · BIN 3067907
💬 Discuss this project
1940Year Built
2Stories
R0Building Class
—Zoning
3,750 sfGross Floor Area
—Units
2 Open Violations ▸FDNY Report ↗
Special condominium billing lot · Owner of record: 419 MANHATTAN AVENUE LLC · 2,500 sf lot · 1.5 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Roof3p · 3 filings · 20 docs
Bulkhead3p · 3 filings · 20 docs
Floor 52p · 2 filings · 20 docs
Floor 42p · 2 filings · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 1
Cellar3p · 3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOMCHRIS CONTRACTING403/22/2026
LBM CONSTRUCTION OF NY IN203/22/2026
TOMCHRIS CONSTRUCTION COR203/22/2026
HAWK CONTRACTING OF NY IN103/22/2026
419 MANHATTAN AVENUE903/22/2026
718 CAPITAL GROUP403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ENGINEERING CONSULTING2203/21/2026
SCARANO ARCHITECT1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LBM CONSTRUCTION OF NY INGeneral Contractor504/09/2026
PHOENIX SUTTON STR INCGeneral Contractor204/09/2026
FULL CIRCLE PLUMBING CORP.Plumbing207/08/2026
HAWK. AA LLCGeneral Contractor104/09/2026
HAWK CONTRACTING OF NY INGeneral Contractor104/09/2026
FULL CIRCLE PLUMBING CORPFire Protection107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
QMB PLUMBING & HTG INCFire Protection107/08/2026
BIG ORANGE SAFETY FIRSTGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRUCT. ENGINEERING INTEG41741010/25/2024
INTERNATIONAL GEOTEHCNICA1795108/01/2022
NODE ARCHITECTURE,ENGINEE6799108/01/2022
Building Lifecycle
All (179)Filed (21)Permit Issued (15)Signed Off (8)Violation (39)Inspection (8)Objection (58)Special Inspection (30)
05/05/2026
Violation issued (HPD, closed)
A
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/02/2025
Signed off — Alteration
This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Building Bulletin 2010-002.
B01078199-I1
05/30/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/28/2025
Signed off — Alteration
Foundation and Structural work filed in conjunction with ALT-1 application #321596732
B00747251-I1
05/02/2025
Signed off — Alteration
Herewith Filing New Plumbing Systems as per plans in conjunction with B00582043.
B00765075-I1
04/11/2025
Signed off — Alteration
New Sprinkler Systems installation as per plans in conjunction with B00582043.
B00765087-I1
04/08/2025
Signed off — Alteration
Mechanical work to be done in conjunction with NB Application #321596732
B00530931-I1
10/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Chris Yiu
10/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
Chris Yiu
10/28/2024
Special inspection requirement — Shutoff dampers
Chris Yiu
10/28/2024
Special inspection requirement — Final
Chris Yiu
10/28/2024
Special inspection requirement — Fire-Resistance Rated Construction
Chris Yiu
10/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Chris Yiu
10/28/2024
Special inspection requirement — Mechanical Systems
Chris Yiu
10/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chris Yiu
10/28/2024
Special inspection requirement — Maintenance information
Chris Yiu
10/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
Chris Yiu
10/25/2024
Filed — Alteration
Mechanical work to be done in conjunction with NB Application #321596732
B00530931-P2
10/23/2024
Special inspection requirement — Energy Code Compliance Inspections
10/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
10/21/2024
Special inspection requirement — HVAC-R and service water heating equipment
Chris Yiu
10/21/2024
Special inspection requirement — Final
Chris Yiu
10/21/2024
Special inspection requirement — Shutoff dampers
Chris Yiu
10/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Chris Yiu
10/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chris Yiu
10/21/2024
Special inspection requirement — Mechanical Systems
Chris Yiu
10/21/2024
Special inspection requirement — HVAC-R and service water heating system controls
Chris Yiu
10/21/2024
Special inspection requirement — Maintenance information
Chris Yiu
10/15/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/10/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/07/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/07/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/25/2024
Permit issued — Sprinklers
B00765087-I1-EW-SP
09/25/2024
Permit issued — Plumbing
B00765075-I1-PL
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/19/2024
Permit issued — General Construction
B01078199-I1-GC
09/05/2024
Objection resolved — Addressed
09/04/2024
Objection raised — Other
08/30/2024
Signed off — Alteration
B00774650-I1
08/22/2024
Filed — Alteration
This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Building Bulletin 2010-002.
B01078199-I1
08/22/2024
Permit issued — Protection and Mechanical Methods
B00774650-I1-PMM
08/20/2024
Signed off — Alteration
B00530872-I1
04/30/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00762084-I1
02/13/2024
Permit issued — Plumbing
B00765075-I1-PL
02/02/2024
Special inspection requirement — Concrete - Cast-In-Place
Chris Yiu
02/02/2024
Special inspection requirement — Structural Steel - Details
Chris Yiu
02/02/2024
Special inspection requirement — Masonry
Chris Yiu
02/02/2024
Special inspection requirement — Structural Steel - Welding
Chris Yiu
02/02/2024
Special inspection requirement — Sprayed fire-resistant materials
Chris Yiu
02/02/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Chris Yiu
02/02/2024
Special inspection requirement — Footing and Foundation
Chris Yiu
02/02/2024
Special inspection requirement — Final
Chris Yiu
02/01/2024
Permit issued — Mechanical Systems
B00530931-I1-MS
01/23/2024
Objection resolved — Addressed
01/10/2024
Objection resolved — Addressed
01/10/2024
Objection resolved — Addressed
01/09/2024
Objection raised — Other
Latest 60 of 179 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offQMB PLUMBING & HTG INC09/25/2024
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC09/25/2024
DOB NOWGeneral ConstructionSigned-offLBM CONSTRUCTION OF NY IN09/19/2024
DOB NOWProtection and Mechanical MethodsSigned-offLBM CONSTRUCTION OF NY IN08/22/2024
DOB NOWPlumbingSigned-offFULL CIRCLE PLUMBING CORP02/13/2024
DOB NOWMechanical SystemsSigned-offLBM CONSTRUCTION OF NY IN02/01/2024
DOB NOWPlumbingSigned-offFULL CIRCLE PLUMBING CORP10/23/2023
DOB NOWSprinklersSigned-offFULL CIRCLE PLUMBING CORP07/21/2023
DOB NOWConstruction FenceSigned-offLBM CONSTRUCTION OF NY IN07/06/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/26/2023
DOB NOWGeneral ConstructionSigned-offLBM CONSTRUCTION OF NY IN03/17/2023
DOB NOWConstruction FenceSigned-offHAWK. AA LLC09/27/2022
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/29/2022
DOB NOWConstruction FenceSigned-offBIG ORANGE SAFETY FIRST06/16/2022
DOB NOWConstruction FenceSigned-offHAWK CONTRACTING OF NY IN03/25/2022
BIS—ISSUEDLBM CONSTRUCTION OF NY IN08/21/2024
BIS—ISSUEDLBM CONSTRUCTION OF NY IN07/24/2024
BIS—ISSUEDLBM CONSTRUCTION OF NY IN12/01/2023
BIS—ISSUEDLBM CONSTRUCTION OF NY IN04/17/2023
BIS—ISSUEDTOMCHRIS CONTRACTING CORP12/28/2022
BIS—ISSUEDTOMCHRIS CONTRACTING CORP07/05/2022
BIS—ISSUEDTOMCHRIS CONTRACTING CORP06/29/2022
BIS—ISSUEDHAWK CONTRACTING OF NY IN04/19/2022
BISOTISSUEDHAWK CONTRACTING OF NY IN09/30/2020
1 project · most recent 02/04/2021
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/04/2021——Heating Systems
1 project · most recent 02/04/2021
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/04/2021——Gas, Storm, Water/Sanitary
3 projects · most recent 01/30/2024
General Wiring
FiledStatusContractorScope
01/30/2024CompleteNEWBRIDGE ELECTL CONTNG—
06/08/2023CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
06/20/2022CompleteELPO ELECTRICAL CONTG INC—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/07/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/07/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/07/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/09/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
10/28/2024HVAC-R and service water piping design and insulationChris Yiuenergy_progress
10/28/2024HVAC-R and service water heating system controlsChris Yiuenergy_progress
10/28/2024Shutoff dampersChris Yiuenergy_progress
10/28/2024FinalChris Yiuprogress
10/28/2024Fire-Resistance Rated ConstructionChris Yiuprogress
10/28/2024Energy Code Compliance InspectionsChris Yiuprogress
10/28/2024Mechanical SystemsChris Yiuspecial
10/28/2024Fire-Resistant Penetrations and JointsChris Yiuspecial
10/28/2024Maintenance informationChris Yiuenergy_progress
10/28/2024HVAC-R and service water heating equipmentChris Yiuenergy_progress
10/23/2024Energy Code Compliance Inspections—progress
10/23/2024Fire-Resistance Rated Construction—progress
10/21/2024HVAC-R and service water heating equipmentChris Yiuenergy_progress
10/21/2024FinalChris Yiuprogress
10/21/2024Shutoff dampersChris Yiuenergy_progress
10/21/2024HVAC-R and service water piping design and insulationChris Yiuenergy_progress
10/21/2024Fire-Resistant Penetrations and JointsChris Yiuspecial
10/21/2024Mechanical SystemsChris Yiuspecial
10/21/2024HVAC-R and service water heating system controlsChris Yiuenergy_progress
10/21/2024Maintenance informationChris Yiuenergy_progress
02/02/2024Concrete - Cast-In-PlaceChris Yiuspecial
02/02/2024Structural Steel - DetailsChris Yiuspecial
02/02/2024MasonryChris Yiuspecial
02/02/2024Structural Steel - WeldingChris Yiuspecial
02/02/2024Sprayed fire-resistant materialsChris Yiuspecial
Latest 25 of 46.
▾Documents — 346 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch14
08/31/2026B00530872-I1Request digital key ↗
08/31/2026B00538362-I1Request digital key ↗
08/29/2026B00747251-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00396959-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Foundation1
09/01/2026B00456294-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/01/2026B00354587-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/01/2026B00354587-S2Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00315786-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00361973-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/01/2026B00457755-I1Request digital key ↗
▸Applications & Permits61
▸BISPLAN / WORK APPROVAL APPLICATION39
06/26/2025321596732Open ↗
06/03/2025321596732Open ↗
05/05/2025321596732Open ↗
Showing 3 of 39 on file for this type
▸BISWORK PERMIT APPLICATION11
07/24/2024321596732Open ↗
04/24/2023321596732Open ↗
04/17/2023321596732Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
07/07/2025321596732Open ↗
04/22/2025322121119Open ↗
04/22/2025322121119Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
04/08/2025340837189Open ↗
03/07/2022340837189Open ↗
12/31/2020340717825Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit3
08/29/2026B00747251-P1Open ↗
08/29/2026B00747251-I1Open ↗
08/13/2026B00457755-I1Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
04/19/2022321596732Open ↗
▸Zoning, Tax Lot & Property Records13
▸BISZONING DIAGRAM6
10/01/2025321596732Open ↗
03/30/2022321596732Open ↗
01/26/2022321596732Open ↗
Showing 3 of 6 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/19/2025322121119Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/27/2021321596732Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/27/2021321596732Open ↗
▸BISVERIFY TAX LOT1
09/19/2024321596732Open ↗
▸BISDOB - ZONING DIAGRAM (ZD1)1
01/27/2021321596732Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/19/2024321596732Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00456294-I1Open ↗
▸Seals & Professional Certifications59
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/01/2026B00457755-I1Open ↗
08/29/2026B00747251-P1Open ↗
08/29/2026B00747251-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
08/29/2026B00530931-P2Open ↗
08/29/2026B00530931-P2Open ↗
08/29/2026B00530931-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
08/29/2026B00530931-P2Open ↗
08/29/2026B00530931-P2Open ↗
08/29/2026B00747251-I1Open ↗
Showing 3 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
03/07/2022340837189Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/07/2022340837189Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment1
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
01/21/2021321596732Open ↗
▸Safety & Tenant Protection37
▸DOB NOWHPD-1: Anti-Harassment Area Checklist20
08/29/2026B00747251-P1Open ↗
08/29/2026B00747251-I1Open ↗
08/29/2026B00762084-I1Open ↗
Showing 3 of 20 on file for this type
▸BISSTREET TREE CHECKLIST8
12/14/2023340837189Open ↗
07/27/2022340837189Open ↗
03/07/2022340837189Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWCertificate of No Harassment4
08/29/2026B00747251-P1Open ↗
08/29/2026B00747251-I1Open ↗
08/13/2026B01078199-I1Open ↗
Showing 3 of 4 on file for this type
▸BISANTI-HARASSMENT AREA CHECKLIST2
05/19/2025322121119Open ↗
Showing 1 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/21/2021321596732Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
01/21/2021321596732Open ↗
▸BISSTREET TREE SIGNOFF1
11/22/2024321596732Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/01/2026B00457755-I1Open ↗
08/29/2026B00747251-P1Open ↗
08/29/2026B00747251-I1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/21/2021321596732Open ↗
Showing 1 of 2 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
03/19/2025340767058Open ↗
03/19/2025340767058Open ↗
12/02/2024340767058Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/22/2025321596732Open ↗
03/19/2025340767058Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
04/22/2025321596732Open ↗
03/19/2025340767058Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00530931-I1Open ↗
08/13/2026B00765075-I1Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/22/2025321596732Open ↗
▸BISEXTERIOR LIGHTING POWER1
04/22/2025321596732Open ↗
▸BISINTERIOR LIGHTING POWER1
04/22/2025321596732Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/22/2025321596732Open ↗
▸BISFENESTRATION AREAS1
04/22/2025321596732Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
05/22/2025321596732Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/22/2025321596732Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00765075-I1Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY11
07/07/2025321596732Open ↗
03/19/2025340767058Open ↗
12/02/2024340767058Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
07/01/2025321596732Open ↗
04/19/2022321596732Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
07/01/2025321596732Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
11/19/2021321596732Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
04/19/2022321596732Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/22/2025321596732Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/25/2025321596732Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00456294-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00456294-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00456294-I1Open ↗
▸Approvals, Objections & Sign-offs29
▸BISSCHEDULE A - OCCUPANCY / USE19
05/05/2025321596732Open ↗
11/08/2024321596732Open ↗
11/07/2024321596732Open ↗
Showing 3 of 19 on file for this type
▸BISSUPERSEDING LETTER3
04/24/2023321596732Open ↗
04/17/2023321596732Open ↗
04/10/2023321596732Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/07/2025321596732Open ↗
07/07/2025321596732Open ↗
04/04/2022321596732Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/21/2025340767058Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
06/12/2025340837189Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
01/26/2022321596732Open ↗
▸BISFINAL1
03/19/2025340767058Open ↗
▸Cost, Insurance & Ownership19
▸BISPROJECT-SPECIFIC GL INSURANCE7
07/24/2024321596732Open ↗
12/29/2022321596732Open ↗
07/09/2022321596732Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT7
01/17/2025321596732Open ↗
01/17/2025321596732Open ↗
11/19/2021321596732Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
09/29/2025321596732Open ↗
03/19/2025340767058Open ↗
▸BISINSURANCE: LIABILITY2
04/19/2022321596732Open ↗
04/01/2022321596732Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
07/24/2024321596732Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION19
07/07/2025321596732Open ↗
07/07/2025321596732Open ↗
06/09/2025321596732Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
03/07/2022340837189Open ↗
Showing 1 of 3 on file for this type
▸BISEFILING COVER SHEET1
04/29/2025322121119Open ↗
▸Other Documents11
▸BISBPP - SUPPORTING DOCUMENTATION3
04/08/2025340837189Open ↗
07/27/2022340837189Open ↗
03/07/2022340837189Open ↗
▸BISPLOT DIAGRAM3
04/22/2025322121119Open ↗
09/23/2021321596732Open ↗
01/21/2021321596732Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
04/22/2025321596732Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
04/22/2025321596732Open ↗
▸BISMAINTENANCE INFORMATION1
04/22/2025321596732Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
05/19/2025322121119Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B00456294-I1Open ↗