| Owner | Filings | Most Recent |
|---|---|---|
| BLDG MANAGEMENT CO., INC. | 134 | 09/24/2026 |
| DORIA | 24 | 07/08/2026 |
| VIK XS SERVICES | 6 | 04/09/2026 |
| BLDG ORCHARD LLC | 4 | 03/22/2026 |
| IG SECOND GENERATION PARTNERS | 3 | 03/21/2026 |
| Triton Construction | 2 | 03/22/2026 |
| VANDERBUILT MANAGEMENT | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| JAROS BAUM & BOLLES | 22 | 08/11/2026 |
| PERKINS EASTMAN | 12 | 08/06/2026 |
| ROBERT GERMAIN JR. PE | 1 | 06/09/2026 |
| OSPINO ENGINEERING PLLC | 2 | 03/11/2026 |
| G. BLINN CONSULTING, LLC | 20 | 01/08/2026 |
| ZENITH HOME INSPECTIONS | 2 | 06/27/2025 |
| SKYLINE RIGGING | 6 | 05/28/2025 |
| TOHFAZ UDDIN PE PC | 4 | 04/22/2025 |
| LOMBARDO PROFESSIONAL ENGINEERING | 6 | 01/29/2025 |
| MSM ENGINEERING SERVICES, PLLC | 1 | 06/26/2024 |
| VALJATO ENGINEERING PC | 6 | 04/25/2024 |
| DOKA USA | 3 | 04/23/2024 |
| PAUL PERDEK, PROF. ENG. PLLC | 3 | 02/29/2024 |
| GREEN RIVER ENVIRONMENTAL ENGINEERI | 2 | 09/15/2023 |
| HIGHBURY CONCRETE | 2 | 06/15/2023 |
| RESTAURANT DESIGN AND DEVELOPMENT | 1 | 11/02/2022 |
| MUESER RUTLEDGE CONSULTING ENGINEER | 2 | 05/23/2022 |
| FL&M ENGINEERING DESIGN &INSPECTION | 2 | 02/28/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE | 46 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 8 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 6 | 03/21/2026 |
| LOMBARDO PROFESSIONAL ENGINEERING | 6 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 60 | 03/21/2026 |
| VALJATO ENGINEERING P C | 12 | 03/21/2026 |
| Rigid Structural Design, LLC | 2 | 03/21/2026 |
| SKY MGT | 2 | 03/21/2026 |
| NY EXPEDITERS | 1 | 03/21/2026 |
| LOUIS STRIAR | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TT MECHANICAL CORP | Plumbing | 74 | 07/30/2026 |
| RAEL AUTOMATIC SPR | Plumbing | 67 | 03/22/2026 |
| S&E BRIDGE & SCAFFOLD LLC. | General Contractor | 42 | 07/08/2026 |
| TRITON CONSTRUCTION CO., | General Contractor | 35 | 07/29/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 11 | 08/05/2026 |
| HIGHBURY CONCRETE, INC | General Contractor | 10 | 07/08/2026 |
| JJ MATTHEWS INC | General Contractor | 8 | 07/08/2026 |
| WINDHAM RESTORATION CORP | General Contractor | 3 | 04/09/2026 |
| TRI BOROUGH SCAFFOLDING | General Contractor | 3 | 03/21/2026 |
| DORIA, INC | General Contractor | 3 | 07/08/2026 |
| DORIA SCAFFOLDING LLC | General Contractor | 3 | 04/09/2026 |
| CITY SIGNS | Scaffold | 2 | 07/08/2026 |
| ANTONY GIRONTA | Electrical | 2 | 03/21/2026 |
| NASH ELECTRIC SERVICES IN | Electrical | 2 | 03/22/2026 |
| G.N.T. MECHANICAL LLC | Plumbing | 2 | 07/08/2026 |
| AGIR ELEC'L LTD. D/B/A | Electrical | 2 | 03/22/2026 |
| ELM SUSPENSION SYSTEMS* | General Contractor | 1 | 07/08/2026 |
| STEVEN KRATCHMAN ARCHIT* | Electrical | 1 | 03/21/2026 |
| HOME CRAFTS, INC | General Contractor | 1 | 06/14/2026 |
| REID, RICARDO | Electrical | 1 | 03/21/2026 |
| LEONID ARLYUK | Electrical | 1 | 03/21/2026 |
| JOE MIDDLETON | Electrical | 1 | 03/21/2026 |
| DIGANGI, JOSEPH | Electrical | 1 | 03/21/2026 |
| TT MECHANICAL | General Contractor | 1 | 04/09/2026 |
| VIK XS SERVICES INC | General Contractor | 1 | 04/09/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ATLANTIC ENGINEERINGLABOR | 1381 | 25 | 08/11/2026 |
| ATLAS ATC ENGINEERING INC | 8011 | 15 | 08/06/2026 |
| SPECIAL TESTING & CONSULT | 1688 | 4 | 07/31/2026 |
| ROBERT F. GERMAIN JR. PE | 5100 | 1 | 06/09/2026 |
| SKYLINE RIGGING | 7880 | 7 | 05/28/2025 |
| LOMBARDO PROF ENGINEERING | 8566 | 5 | 01/29/2025 |
| VALJATO ENGINEERING PC | 2486 | 6 | 04/25/2024 |
| G. BLINN CONSULTING, LLC | 2894 | 7 | 08/04/2023 |
| MUESER RUTLEDGE CONSULTIN | 977 | 2 | 05/23/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Suspended Scaffold | Permit Issued | TWO-TONE CONTRACTING CORP | 09/23/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 08/04/2026 |
| DOB NOW | Sprinklers | Permit Issued | TTM GROUP CORP | 07/30/2026 |
| DOB NOW | Plumbing | Permit Issued | TT MECHANICAL CORP | 07/29/2026 |
| DOB NOW | General Construction | Permit Issued | TRITON CONSTRUCTION CO., | 07/28/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | PIONEER WINDOW MFG CORP | 07/24/2026 |
| DOB NOW | General Construction | Signed-off | HOME CRAFTS, INC | 06/12/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | PIONEER WINDOW MFG CORP | 04/03/2026 |
| DOB NOW | General Construction | Permit Issued | TRITON CONSTRUCTION CO., | 03/24/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | TWO-TONE CONTRACTING CORP | 02/19/2026 |
| DOB NOW | General Construction | Permit Issued | TRITON CONSTRUCTION CO., | 02/05/2026 |
| DOB NOW | Mechanical Systems | Signed-off | TRITON CONSTRUCTION CO., | 02/03/2026 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 01/21/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 01/20/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 01/20/2026 |
| DOB NOW | Plumbing | Permit Issued | TT MECHANICAL CORP | 01/12/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | PIONEER WINDOW MFG CORP | 11/24/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | PIONEER WINDOW MFG CORP | 11/24/2025 |
| DOB NOW | General Construction | Signed-off | TRITON CONSTRUCTION CO., | 11/21/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | VIK XS SERVICES INC | 11/12/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 10/08/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 09/30/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 09/30/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 09/30/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 09/30/2025 |
| DOB NOW | Construction Fence | Permit Issued | S&E BRIDGE & SCAFFOLD LLC | 09/30/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 09/30/2025 |
| DOB NOW | Sign | Signed-off | ELMER DAWSON | 07/15/2025 |
| DOB NOW | Sign | Signed-off | ELMER DAWSON | 07/15/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | DORIA SCAFFOLDING | 06/10/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | DORIA SCAFFOLDING | 06/10/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | DORIA, INC | 05/28/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | JJ MATTHEWS | 05/14/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | WINDHAM RESTORATION CORP | 04/01/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | WINDHAM RESTORATION CORP | 04/01/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | JJ MATTHEWS | 02/20/2025 |
| DOB NOW | Mechanical Systems | Signed-off | TRITON CONSTRUCTION CO., | 02/18/2025 |
| DOB NOW | General Construction | Permit Issued | TRITON CONSTRUCTION CO., | 02/18/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | PIONEER WINDOW MFG CORP | 01/30/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | DORIA, INC | 01/28/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/11/2026 | Permit Issued | TRITON CONSTRUCTION CO., | Air Conditioning Systems, Associated Ducts and Piping, Ventilation Systems | Cooling Lennox VRB072H4M 6 tons · Condensing Unit ×144 VRB096H4M 8 tons · Condensing Unit ×81 VPB072H4M 6 tons · Condensing Unit ×72 VRB144H4M 12 tons · Vrf Outdoor ×27 VPB144H4M 12 tons · Condensing Unit ×9 VRB120H4M 10 tons · Condensing Unit ×9 Skypeak SKY-SDSV180C 185,000 BTU · Packaged Unit ×18 SKY-SDSV300C 282,000 BTU ×18 SKY-SDSV240C 251,000 BTU ×9 Recoswim HYDRUS 6000 SE 90,000 BTU ×9 Ducts & Piping N/A N/A 1 BTU ×9 Ventilation Greenheck BSQ-90 600 CFM · Exhaust Fan ×15 AX-160-533-0813-B500 50,000 CFM · Exhaust Fan ×10 AX-47-160-0621-A15 3,000 CFM · Exhaust Fan ×10 AX-54-160-0618-A15 5,000 CFM · Exhaust Fan ×10 QEI-18 3,400 CFM ×10 AX-47-300-0621-A15 3,000 CFM · Exhaust Fan ×5 AX-47-300-160-0621-A15 3,000 CFM · Exhaust Fan ×5 BSQ-140 2,000 CFM · Exhaust Fan ×5 BSQ-140HP-5-X 1,000 CFM · Exhaust Fan ×5 QEI-9-300-30-6 2,000 CFM · Exhaust Fan ×5 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/31/2026 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 4 heads |
| 01/27/2026 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 28,736 heads, 4 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Permit Issued | TT MECHANICAL CORP | Gas, Storm, Water/Sanitary |
| 07/31/2026 | Permit Issued | TTM GROUP CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/20/2026 | Complete | PROFF ELECTRICAL LLC | — |
| 04/20/2026 | Complete | PROFF ELECTRICAL LLC | — |
| 10/23/2025 | Complete | AGIR ELEC'L LTD. D/B/A | General Wiring |
| 10/16/2024 | Permit Issued | JAM ELECTRICAL CORP | — |
| 10/08/2024 | Permit Issued | AGIR ELEC'L LTD. D/B/A | — |
| 07/30/2024 | Permit Issued | AGIR ELEC'L LTD. D/B/A | General Wiring |
| 07/30/2024 | Permit Issued | AGIR ELEC'L LTD. D/B/A | — |
| 09/17/2023 | Permit Issued | JAM ELECTRICAL CORP | — |
| 09/17/2023 | Permit Issued | JAM ELECTRICAL CORP | — |
| 09/17/2023 | Permit Issued | JAM ELECTRICAL CORP | — |
| 09/17/2023 | Permit Issued | JAM ELECTRICAL CORP | — |
| 03/23/2023 | Complete | NASH ELECTRIC SERVICES IN | — |
| 03/23/2023 | Complete | NASH ELECTRIC SERVICES IN | — |
| 03/23/2023 | Complete | NASH ELECTRIC SERVICES IN | — |
| 10/19/2022 | Complete | NASH ELECTRIC SERVICES IN | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Permit Issued | TRITON CONSTRUCTION CO., | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/08/2026 | Signed-off | S&E BRIDGE & SCAFFOLD LLC | Sidewalk Shed |
| 04/22/2025 | Permit Issued | JJ MATTHEWS INC | Scaffold |
| 06/26/2024 | — | — | Scaffold |
| 12/08/2022 | Permit Issued | S&E BRIDGE & SCAFFOLD LLC | Fence |
| 02/28/2022 | Signed-off | TRI BOROUGH SCAFFOLDING * | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Permit Issued | TRITON CONSTRUCTION CO., | Suspended Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Permit Issued | TRITON CONSTRUCTION CO., | Suspended Scaffold (SC) |
| 01/08/2026 | Signed-off | S&E BRIDGE & SCAFFOLD LLC | Suspended Scaffold (SC) |
| 01/29/2025 | Permit Issued | PIONEER WINDOW MFG CORP | Suspended Scaffold (SC) |
| 05/06/2024 | Signed-off | PIONEER WINDOW MFG CORP | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/16/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/04/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/28/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/08/2026 | Fail-Final Boiler Equipment Inspection | Fail | View ↗ |
| 04/06/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 04/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/03/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/03/2026 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 03/20/2026 | Fail-Final Boiler Equipment Inspection | Fail | View ↗ |
| 03/17/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/17/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/30/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 01/09/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 01/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 01/07/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/21/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 11/19/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 11/19/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/05/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/03/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 09/02/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/06/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/04/2026 | Fenestration air leakage | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 08/04/2026 | Energy Code Compliance Inspections | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 08/04/2026 | Tenant Protection Plan Compliance | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 08/04/2026 | Fire-Resistance Rated Construction | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 08/04/2026 | Final | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 08/04/2026 | Fire-Resistant Penetrations and Joints | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 08/04/2026 | Fenestration and door U-factor and product ratings | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 08/04/2026 | Air barrier - visual inspection | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 08/04/2026 | Fenestration areas | SEBASTIAN SETTEDUCATE JR., P.E | energy_progress |
| 08/03/2026 | Electrical motors and elevators | Christopher O'Malley | energy_progress |
| 08/03/2026 | Fire-Resistance Rated Construction | Christopher O'Malley | progress |
| 08/03/2026 | Fire-Resistant Penetrations and Joints | Christopher O'Malley | special |
| 08/03/2026 | Exterior Insulation and Finish Systems (EIFS) | Christopher O'Malley | special |
| 08/03/2026 | Subsurface Investigations (Borings/Test Pits) | Francis Arland | special |
| 08/03/2026 | Insulation placement and R values | Christopher O'Malley | energy_progress |
| 08/03/2026 | Protection of exposed foundation insulation | Christopher O'Malley | energy_progress |
| 08/03/2026 | Vestibules | Christopher O'Malley | energy_progress |
| 08/03/2026 | Interior lighting power | Christopher O'Malley | energy_progress |
| 08/03/2026 | Energy Code Compliance Inspections | Christopher O'Malley | progress |
| 08/03/2026 | Air barrier continuity plan testing | Christopher O'Malley | energy_progress |
| 08/03/2026 | Tenant Protection Plan Compliance | Jorge Santos | special |
| 08/03/2026 | Maintenance information | Christopher O'Malley | energy_progress |
| 08/03/2026 | Fenestration air leakage | Christopher O'Malley | energy_progress |
| 08/03/2026 | Air barrier - visual inspection | Christopher O'Malley | energy_progress |
| 08/03/2026 | Metering | Christopher O'Malley | energy_progress |