Three families
42-06 161ST STREET
QUEENS · BIN 4624234
💬 Discuss this project
2023Year Built
3Stories
C0Building Class
R5BZoning
3,186 sfGross Floor Area
3Units
0 Active ViolationsFDNY Report ↗
Three families · Owner of record: OP Management Group · 1,900 sf lot · 1.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof25p · 1 filing · 20 docs
Floor 325p · 1 filing · 20 docs
Floor 225p · 1 filing · 20 docs
Floor 125p · 1 filing · 20 docs
Cellar41p · 1 filing · 20 docs
Site & exterior55p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/26/2024$1.9M—16018 SANFORD HOLDING LLC → OP MANAGEMENT GROUP LLC$591/sf building
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S Y Consulting Violations1003/21/2026
LC Expediting Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dynasty ContractingGeneral Contractor603/21/2026
TLS Construction Group IGeneral Contractor303/21/2026
Dynasty Contractingspecialty_contractor303/21/2026
QMB Plumbing & Heatingspecialty_contractor207/08/2026
TLS Construction Group IScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A & T Design Group1088905/28/2024
Building Lifecycle
08/11/2024
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
Q00666731-I1-GC-CX
06/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/19/2024
Special inspection requirement — Ventilation and air distribution system
ROBERT LIN
06/19/2024
Special inspection requirement — Fenestration air leakage
ROBERT LIN
06/19/2024
Special inspection requirement — Mechanical Systems
ROBERT LIN
70 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTLS Construction Group I01/08/2024
DOB NOWConstruction FenceSigned-offTLS Construction Group I12/27/2023
DOB NOWPlumbingSigned-offQMB Plumbing & Heating04/12/2023
DOB NOWSprinklersSigned-offQMB Plumbing & Heating04/12/2023
DOB NOWMechanical SystemsPermit IssuedDynasty Contracting01/17/2023
DOB NOWSupport of ExcavationSigned-offDynasty Contracting01/06/2023
DOB NOWGeneral ConstructionPermit IssuedDynasty Contracting11/22/2022
1 project · most recent 05/28/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScope
05/28/2024Permit IssuedTLS Construction Group IAir Conditioning Systems, Heating Systems
1 project · most recent 05/28/2024
Sprinkler System
FiledStatusContractorScope
05/28/2024Signed-offQMB Plumbing & HeatingSprinkler System
1 project · most recent 05/28/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/28/2024Signed-offQMB Plumbing & HeatingGas, Storm, Water/Sanitary
1 project · most recent 03/20/2024
General Wiring
FiledStatusContractorScope
03/20/2024CompleteP.L. Electrical ContractingGeneral Wiring
1 project · most recent 05/28/2024
Steel Concrete Masonry
FiledStatusContractorScope
05/28/2024Permit IssuedTLS Construction Group ISteel, Concrete, Masonry
1 project · most recent 05/28/2024
Fence
FiledStatusContractorScope
05/28/2024Permit IssuedTLS Construction Group IFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/22/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/28/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/28/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 146
DateRequirementInspectorRole
06/19/2024Structural Steel - High Strength BoltingROBERT LINspecial
06/19/2024Concrete - Cast-In-PlaceROBERT LINspecial
06/19/2024Subsurface Investigations (Borings/Test Pits)Paul Raymondspecial
06/19/2024Structural Steel - WeldingROBERT LINspecial
06/19/2024Post-installed AnchorsROBERT LINspecial
06/19/2024MasonryROBERT LINspecial
06/19/2024Excavations - Sheeting, Shoring, and BracingROBERT LINspecial
06/19/2024Structural Steel - DetailsROBERT LINspecial
06/19/2024Mechanical SystemsROBERT LINspecial
06/19/2024Footing and FoundationROBERT LINprogress
06/19/2024FinalROBERT LINprogress
06/19/2024Fenestration and door U-factor and product ratingsROBERT LINenergy_progress
06/19/2024Air barrier — testing ROBERT LINenergy_progress
06/19/2024Air barrier - visual inspectionROBERT LINenergy_progress
06/19/2024MeteringROBERT LINenergy_progress
06/19/2024Insulation placement and R valuesROBERT LINenergy_progress
06/19/2024Ventilation and air distribution systemROBERT LINenergy_progress
06/19/2024Interior lighting powerROBERT LINenergy_progress
06/19/2024HVAC-R and service water piping design and insulationROBERT LINenergy_progress
06/19/2024Fenestration areasROBERT LINenergy_progress
06/19/2024HVAC-R and service water heating equipmentROBERT LINenergy_progress
06/19/2024Permanent certificateROBERT LINenergy_progress
06/19/2024HVAC-R and service water heating system controlsROBERT LINenergy_progress
06/19/2024Fenestration air leakageROBERT LINenergy_progress
06/19/2024Electric vehicle service equipment requirementsROBERT LINenergy_progress
Latest 25 of 146.