DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
ECB03/27/2018B265 AS PER CLASS (B265) 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT AS PER DOB RECORDS. SUBMIT A CURRENT B09 REPORT.Nothing owed — awaiting certificate of correction
Parsonage, rectory · Owner of record: FIRST UNITED METHODIST CHURCH OF CORONA · 2,500 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.