Three families
42-08 161ST STREET
QUEENS · East Flushing · BIN 4624235
💬 Discuss this project
2023Year Built
3Stories
C0Building Class
R5BZoning
3,186 sfGross Floor Area
3Units
Three families · Owner of record: OL MANAGEMENT GROUP LLC · 1,900 sf lot · 1.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof39p · 1 filing · 20 docs
Floor 338p · 1 filing · 20 docs
Floor 238p · 1 filing · 20 docs
Floor 138p · 1 filing · 20 docs
Cellar36p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OL MANAGEMENT GROUP LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/26/2024$1.9M—16018 SANFORD HOLDING LLC → OL MANAGEMENT GROUP LLC$591/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A & T ENGINEERING, P.C.1008/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LC EXPEDITING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNASTY CONTRACTING LLCGeneral Contractor903/21/2026
TLS CONSTRUCTION GROUP I*General Contractor603/21/2026
QMB PLUMBING & HTG INCFire Protection107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A & T DESIGN GROUP LLC1088908/30/2024
Building Lifecycle
All (77)Filed (10)Permit Issued (7)Signed Off (3)Inspection (9)Objection (18)Special Inspection (30)
09/18/2024
Special inspection requirement — Maintenance information
ROBERT LIN
09/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
ROBERT LIN
09/18/2024
Special inspection requirement — Electric vehicle service equipment requirements
ROBERT LIN
09/18/2024
Special inspection requirement — Structural Steel - Welding
ROBERT LIN
09/18/2024
Special inspection requirement — Fenestration areas
ROBERT LIN
09/18/2024
Special inspection requirement — Permanent certificate
ROBERT LIN
09/18/2024
Special inspection requirement — Fenestration air leakage
ROBERT LIN
09/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT LIN
09/18/2024
Special inspection requirement — Post-installed Anchors
ROBERT LIN
09/18/2024
Special inspection requirement — Structural Steel - Details
ROBERT LIN
09/18/2024
Special inspection requirement — Metering
ROBERT LIN
09/18/2024
Special inspection requirement — Final
ROBERT LIN
09/18/2024
Special inspection requirement — Protection of exposed foundation insulation
ROBERT LIN
09/18/2024
Special inspection requirement — Interior lighting power
ROBERT LIN
09/18/2024
Special inspection requirement — Air barrier — testing
ROBERT LIN
09/18/2024
Special inspection requirement — Insulation placement and R values
ROBERT LIN
09/18/2024
Special inspection requirement — Ventilation and air distribution system
ROBERT LIN
09/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
ROBERT LIN
09/18/2024
Special inspection requirement — Mechanical Systems
ROBERT LIN
09/18/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ROBERT LIN
09/18/2024
Special inspection requirement — Structural Steel - High Strength Bolting
ROBERT LIN
09/18/2024
Special inspection requirement — Concrete - Cast-In-Place
ROBERT LIN
09/18/2024
Special inspection requirement — Heating Systems
ROBERT LIN
09/18/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Paul Raymond
09/18/2024
Special inspection requirement — Masonry
ROBERT LIN
09/18/2024
Special inspection requirement — Footing and Foundation
ROBERT LIN
09/18/2024
Special inspection requirement — Air barrier - visual inspection
ROBERT LIN
09/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ROBERT LIN
08/30/2024
Filed — New Building
Filing plumbing and sprinkler plan in conjunction with NB
Q00642044-P9
08/01/2024
Special inspection requirement — Concrete - Cast-In-Place
ROBERT LIN
08/01/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ROBERT LIN
07/22/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/03/2024
Filed — New Building
Filing plumbing and sprinkler plan in conjunction with NB
Q00642044-P8
05/02/2024
Signed off — New Building
Filing plumbing and sprinkler plan in conjunction with NB
Q00642044-S4
05/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/26/2024
Signed off — New Building
Filing plumbing and sprinkler plan in conjunction with NB
Q00642044-S2
01/22/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/18/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/08/2024
Filed — New Building
Filing plumbing and sprinkler plan in conjunction with NB
Q00642044-P4
01/08/2024
Permit issued — Mechanical Systems
Q00642044-I1-GC-CX
12/26/2023
Filed — New Building
Filing plumbing and sprinkler plan in conjunction with NB
Q00642044-S4
12/26/2023
Permit issued — Construction Fence
Q00642044-S4-FN
11/29/2023
Signed off — New Building
Filing plumbing and sprinkler plan in conjunction with NB
Q00642044-S1
09/01/2023
Objection resolved — Addressed
09/01/2023
Objection resolved — Addressed
09/01/2023
Objection resolved — Addressed
09/01/2023
Objection resolved — Addressed
09/01/2023
Objection resolved — Addressed
08/31/2023
Objection raised — Structural
08/31/2023
Objection raised — Other
08/31/2023
Objection raised — Other
08/31/2023
Objection resolved — Addressed
08/31/2023
Objection raised — Other
08/31/2023
Objection raised — Structural
08/31/2023
Objection raised — Other
08/30/2023
Filed — New Building
Filing plumbing and sprinkler plan in conjunction with NB
Q00642044-P5
08/28/2023
Filed — New Building
Filing plumbing and sprinkler plan in conjunction with NB
Q00642044-P3
08/11/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/11/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/11/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTLS CONSTRUCTION GROUP I*01/08/2024
DOB NOWConstruction FenceSigned-offTLS CONSTRUCTION GROUP I*12/26/2023
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC04/12/2023
DOB NOWSprinklersSigned-offQMB PLUMBING & HTG INC04/12/2023
DOB NOWStructuralPermit IssuedDYNASTY CONTRACTING LLC01/17/2023
DOB NOWSupport of ExcavationSigned-offDYNASTY CONTRACTING LLC01/06/2023
DOB NOWGeneral ConstructionPermit IssuedDYNASTY CONTRACTING LLC11/21/2022
1 project · most recent 08/30/2024
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/30/2024Permit IssuedTLS CONSTRUCTION GROUP I*Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems
Cooling
Gree GMV-ND09G/B4B-T(U) 12,000 BTU · Vrf Outdoor ×17
GMV-60WL/C-T(U) 60,000 BTU · Vrf Outdoor ×3
GMV-36WL/B-T(U) 36,000 BTU · Vrf Outdoor ×1
Mitsubishi Electric SEZ-KD12NA4R1.TH 13,600 BTU · Split System ×16
MXZ-4C36NAHZ 45,000 BTU · Condensing Unit ×6
Heating
A.O. Smith CDHE-75 100 BTU · Water Heater ×9
Heat / Cool
Gree GMV-ND09G/B4B-T(U) 12,000 BTU · Vrf Outdoor ×17
GMV-60WL/C-T(U) 60,000 BTU · Vrf Outdoor ×3
GMV-36WL/B-T(U) 36,000 BTU · Vrf Outdoor ×1
1 project · most recent 08/30/2024
Sprinkler System
FiledStatusContractorScope
08/30/2024Signed-offQMB PLUMBING & HTG INCSprinkler System
1 project · most recent 08/30/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/30/2024Signed-offQMB PLUMBING & HEATING INGas, Storm, Water/Sanitary
1 project · most recent 03/20/2024
General Wiring
FiledStatusContractorScope
03/20/2024CompleteP.L. ELEC'L CONTR'G CORPGeneral Wiring
1 project · most recent 08/30/2024
Steel Concrete Masonry
FiledStatusContractorScope
08/30/2024Permit IssuedTLS CONSTRUCTION GROUP I*Steel, Concrete, Masonry
1 project · most recent 08/30/2024
Fence
FiledStatusContractorScope
08/30/2024Permit IssuedTLS CONSTRUCTION GROUP I*Fence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/22/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/22/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/11/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/11/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/11/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 130
DateRequirementInspectorRole
09/18/2024Excavations - Sheeting, Shoring, and BracingROBERT LINspecial
09/18/2024Maintenance informationROBERT LINenergy_progress
09/18/2024Electric vehicle service equipment requirementsROBERT LINenergy_progress
09/18/2024HVAC-R and service water piping design and insulationROBERT LINenergy_progress
09/18/2024HVAC-R and service water heating system controlsROBERT LINenergy_progress
09/18/2024Ventilation and air distribution systemROBERT LINenergy_progress
09/18/2024Fenestration air leakageROBERT LINenergy_progress
09/18/2024Insulation placement and R valuesROBERT LINenergy_progress
09/18/2024Air barrier — testing ROBERT LINenergy_progress
09/18/2024Fenestration areasROBERT LINenergy_progress
09/18/2024Permanent certificateROBERT LINenergy_progress
09/18/2024Interior lighting powerROBERT LINenergy_progress
09/18/2024HVAC-R and service water heating equipmentROBERT LINenergy_progress
09/18/2024Protection of exposed foundation insulationROBERT LINenergy_progress
09/18/2024Fenestration and door U-factor and product ratingsROBERT LINenergy_progress
09/18/2024Air barrier - visual inspectionROBERT LINenergy_progress
09/18/2024MeteringROBERT LINenergy_progress
09/18/2024FinalROBERT LINprogress
09/18/2024Footing and FoundationROBERT LINprogress
09/18/2024MasonryROBERT LINspecial
09/18/2024Heating SystemsROBERT LINspecial
09/18/2024Subsurface Investigations (Borings/Test Pits)Paul Raymondspecial
09/18/2024Structural Steel - WeldingROBERT LINspecial
09/18/2024Post-installed AnchorsROBERT LINspecial
09/18/2024Structural Steel - DetailsROBERT LINspecial
Latest 25 of 130.
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/23/2026Q00642044-I1Request digital key ↗
08/23/2026Q00642044-P9Request digital key ↗
08/23/2026Q00642044-P8Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
10/16/2023440742813Open ↗
08/04/2023410058093Open ↗
10/07/2022440742813Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
10/24/2023440742813Open ↗
03/16/2023440742813Open ↗
10/07/2022440742813Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
08/01/2024440742813Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026Q00642044-I1Open ↗
08/13/2026Q00642044-P2Open ↗
08/13/2026Q00642044-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026Q00642044-P9Open ↗
08/13/2026Q00642044-I1Open ↗
08/13/2026Q00642044-P8Open ↗
Showing 3 of 5 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/16/2023440742813Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
08/01/2024440742813Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/07/2023440742813Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00642044-I1Open ↗
▸Seals & Professional Certifications54
▸DOB NOWSpecial Inspector Seal & Signature21
09/23/2026Q00642044-S2Open ↗
09/23/2026Q00642044-S2Open ↗
09/23/2026Q00642044-S2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/23/2026Q00642044-S2Open ↗
09/23/2026Q00642044-S2Open ↗
09/23/2026Q00642044-S2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/23/2026Q00642044-P9Open ↗
08/23/2026Q00642044-P8Open ↗
08/23/2026Q00642044-S4Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/24/2009410058093Open ↗
02/08/2008410058093Open ↗
02/08/2008410058093Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/07/2022440742813Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/07/2022440742813Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026Q00642044-P2Open ↗
08/13/2026Q00642044-I1Open ↗
08/13/2026Q00642044-P9Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
11/06/2009410058093Open ↗
03/24/2009410058093Open ↗
02/08/2008410058093Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist5
08/13/2026Q00642044-P2Open ↗
08/13/2026Q00642044-P8Open ↗
08/13/2026Q00642044-P4Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
03/16/2023440742813Open ↗
03/25/2009410058093Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/16/2023440742813Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00642044-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00642044-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00642044-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/08/2008410058093Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00642044-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT6
08/13/2026Q00642044-S1Open ↗
08/13/2026Q00642044-I1Open ↗
08/13/2026Q00642044-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00642044-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE3
11/06/2009410058093Open ↗
03/24/2009410058093Open ↗
02/08/2008410058093Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/01/2024440742813Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/08/2008410058093Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
10/07/2022440742813Open ↗
▸BISADDITIONAL INFORMATION1
10/24/2023440742813Open ↗
▸Other Documents29
▸BISBPP - SUPPORTING DOCUMENTATION7
08/01/2024440742813Open ↗
08/01/2024440742813Open ↗
08/01/2024440742813Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026Q00642044-P4Open ↗
08/13/2026Q00642044-P2Open ↗
08/13/2026Q00642044-P8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026Q00642044-P4Open ↗
08/13/2026Q00642044-P2Open ↗
08/13/2026Q00642044-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/23/2026Q00642044-P4Open ↗
08/23/2026Q00642044-P9Open ↗
08/23/2026Q00642044-P8Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM2
10/07/2022440742813Open ↗
03/24/2009410058093Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00642044-I1Open ↗
08/13/2026Q00642044-S1Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
03/16/2023440742813Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00642044-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00642044-I1Open ↗