| Owner | Filings | Most Recent |
|---|---|---|
| HEARTFELT BUILDERS | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| SIERRA CONSTRUCTION | 1 | 06/12/2026 |
| ELEVATED ENGINEERING NYC | 4 | 04/03/2026 |
| ADROIT ENGINEERING PLLC | 4 | 01/30/2026 |
| A&D ENGINEERING, PLLC | 4 | 12/18/2025 |
| JFA ARCHITECTS & ENGINEERS DPC | 1 | 09/16/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| BAC Developers Group | 8 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| HEARTFELT TOWNHOUSE BUILD | General Contractor | 3 | 09/30/2026 |
| N TECH DESIGN OF AMERICA | General Contractor | 3 | 09/18/2026 |
| MPI PLUMBING CORP | Plumbing | 2 | 09/26/2026 |
| M.R. ELEC'L SERVICE LLC | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| HRF SERVICES CORP | 5616 | 1 | 09/30/2025 |
| ADROIT ENGINEERING PLLC | 8885 | 1 | 07/31/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | MPI PLUMBING CORP | 09/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | HEARTFELT TOWNHOUSE BUILD | 09/24/2026 |
| DOB NOW | Standpipe | Permit Issued | MPI PLUMBING CORP | 09/24/2026 |
| DOB NOW | Full Demolition | Permit Issued | N TECH DESIGN OF AMERICA | 09/17/2026 |
| DOB NOW | Full Demolition | Permit Issued | N TECH DESIGN OF AMERICA | 08/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | N TECH DESIGN OF AMERICA | 08/07/2026 |
| DOB NOW | Construction Fence | Permit Issued | HEARTFELT TOWNHOUSE BUILD | 02/04/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/03/2026 | Permit Issued | HEARTFELT TOWNHOUSE BUILD | Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Daikin RXTA24AAVJU 23,000 BTU · Vrf Outdoor ×3 RXTA48AAVJU 45,500 BTU · Vrf Outdoor ×3 RXTA60AAVJU 57,500 BTU · Vrf Outdoor ×1 Heat / Cool Islandaire EZLA09L231E 375 CFM · Heat Pump Outdoor ×123 EZLA16L341E 375 CFM · Heat Pump Outdoor ×99 EZLA12L341E 375 CFM · Heat Pump Outdoor ×8 Heating Daikin RXTA24AAVJU 25,800 BTU · Vrf Outdoor ×3 RXTA48AAVJU 47,500 BTU · Vrf Outdoor ×3 RXTA60AAVJU 57,500 BTU · Vrf Outdoor ×1 Ventilation Greenheck SP-B50-QD 50 CFM · Exhaust Fan ×128 G-095-VG 500 CFM · Exhaust Fan ×5 G-120-VG 1,450 CFM · Exhaust Fan ×3 SQ-90-VG 800 CFM · Exhaust Fan ×3 G-090-VG 400 CFM · Exhaust Fan ×2 G-100-VG 600 CFM · Exhaust Fan ×2 AX-47-160-0627 5,400 CFM · Exhaust Fan ×1 AX-47-190-0621 5,400 CFM · Exhaust Fan ×1 SQ-70-VG 590 CFM · Exhaust Fan ×1 Panasonic FV-20VQ3 190 CFM · Exhaust Fan ×1 Renewaire HE1.5XRT 790 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/03/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/03/2026 | Permit Issued | MPI PLUMBING CORP | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/21/2026 | Permit Issued | POWER DIRECT ELECTRIC INC | General Wiring |
| 12/15/2025 | Permit Issued | POWER DIRECT ELECTRIC INC | General Wiring |
| 12/15/2025 | Permit Issued | POWER DIRECT ELECTRIC INC | 101 meters, 101 new_meters |
| 12/15/2025 | Permit Issued | POWER DIRECT ELECTRIC INC | 1 meters, 1 new_meters |
| 12/09/2025 | Permit Issued | M.R. ELEC'L SERVICE LLC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/03/2026 | Permit Issued | MPI PLUMBING CORP | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/30/2026 | Permit Issued | HEARTFELT TOWNHOUSE BUILD | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/07/2026 | Construction Operations Influencing Adjacent Structures | — | special |
| 05/07/2026 | Underpinning and alternate methods of support of buildings and adjacent property | — | special |
| 05/07/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 05/07/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 05/07/2026 | Structural Steel - Details | — | special |
| 05/07/2026 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 05/07/2026 | Structural Steel - Welding | — | special |
| 03/26/2026 | Air barrier continuity plan testing | — | energy_progress |
| 12/17/2025 | Standpipe Systems | — | special |
| 12/11/2025 | Fire-Resistant Penetrations and Joints | SHAHRIAR QUAYYUM | special |
| 12/11/2025 | HVAC-R and service water piping design and insulation | SHAHRIAR QUAYYUM | energy_progress |
| 12/11/2025 | Energy Code Compliance Inspections | SHAHRIAR QUAYYUM | progress |
| 12/11/2025 | HVAC-R and service water heating equipment | SHAHRIAR QUAYYUM | energy_progress |
| 12/11/2025 | HVAC-R and service water heating system controls | SHAHRIAR QUAYYUM | energy_progress |
| 12/11/2025 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | SHAHRIAR QUAYYUM | special |
| 12/11/2025 | Maintenance information | SHAHRIAR QUAYYUM | energy_progress |
| 09/30/2025 | Masonry | — | special |
| 09/30/2025 | Post-installed Anchors | — | special |
| 09/26/2025 | Concrete - Cast-In-Place | — | special |
| 09/26/2025 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 09/26/2025 | Construction Operations Influencing Adjacent Structures | — | special |
| 09/26/2025 | Subgrade Inspections | — | special |
| 09/26/2025 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 09/26/2025 | Final | — | progress |
| 09/26/2025 | Footing and Foundation | — | progress |