← Back
Elevator apt, semi-fireproof without stores
42-11 HAMPTON STREET
QUEENS · BIN 4038913
💬 Discuss this project
1961Year Built
6Stories
D1Building Class
R7BZoning
73,100 sfGross Floor Area
77Units
LL97 CoveredRent Stabilized18 Open Violations 17 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: 25 HAMPTON LLC · 17,500 sf lot · 4.18 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 11 docs
CellarUnder Construction7p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ELITE QUALITY CONSTRUCTION CONT108/13/2026
TOPLINE NYC CONTRACTING307/08/2026
25 HAMPTON LLC903/22/2026
35 HAMPTON LLC 1103/22/2026
ZUJ REALTY CORP503/22/2026
Z.U.J REALTY MANAGEMEN103/22/2026
2 4 J REALTY CORP103/22/2026
88 INDUSTIRIES603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAYTA + SEBASTIAN ARCHITECTURE DPC308/05/2026
ALWAYS FAST SERVICES CORP107/30/2026
JAMES A CLANCY304/11/2024
SYED ENGINEERING, P.C.106/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN CONSULTING603/21/2026
GARDEN STATE OF NJ DATA RECOVERY203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEST ENERGY POWER 2015 LLGeneral Contractor303/21/2026
ELITE QUALITY CONSTRUCTIOGeneral Contractor207/08/2026
ALPHA SCAFFOLDING INCGeneral Contractor108/01/2026
PALLADIUM CONSTRUCTION COGeneral Contractor109/03/2026
TOPLINE NYC CONTRACTINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MAYTA + SEBASTIAN ARCHITE5890308/05/2026
ETRECTE LLC8116304/11/2024
Building Lifecycle
All (113)Filed (9)Permit Issued (7)Signed Off (3)Facade (FISP) (12)Violation (60)Special Inspection (22)
09/02/2026
Permit issued — General Construction
Q01417167-I1-GC
08/12/2026
Permit issued — Suspended Scaffold
Q01434448-I1-SC
08/05/2026
Filed — Alteration
Facade and cellar garage repairs. No change in use, egress, or occupancy.
Q01417167-I1
07/31/2026
Permit issued — Sidewalk Shed
Q01433030-I1-SH
07/30/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01433030-I1
07/21/2026
Filed — Alteration
Q01434448-I1
06/16/2026
Special inspection requirement — Masonry
Raul Mayta
06/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
Raul Mayta
06/15/2026
Special inspection requirement — Final
Raul Mayta
10/30/2025
Violation issued (HPD, closed)
C
05/20/2025
Violation issued (HPD, closed)
C
05/20/2025
Violation issued (HPD, closed)
C
05/20/2025
Violation issued (HPD, closed)
C
05/20/2025
Violation issued (HPD, closed)
C
05/20/2025
Violation issued (HPD, closed)
C
05/20/2025
Violation issued (HPD, closed)
C
05/20/2025
Violation issued (HPD, closed)
B
05/20/2025
Violation issued (HPD, open)
C
05/20/2025
Violation issued (HPD, closed)
A
05/20/2025
Violation issued (HPD, closed)
C
05/20/2025
Violation issued (HPD, closed)
B
03/25/2025
Violation issued (HPD, closed)
B
03/25/2025
Violation issued (HPD, closed)
C
01/08/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/16/2024
Violation issued (HPD, closed)
A
11/07/2024
Violation issued (ECB, open)
Construction
07/03/2024
Violation issued (HPD, open)
B
07/03/2024
Violation issued (HPD, open)
B
04/15/2024
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
Q00971802-I1
04/12/2024
Special inspection requirement — Final
James Clancy
04/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
04/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
04/12/2024
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
04/12/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
04/12/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
James Clancy
04/11/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
Q00971802-P2
03/30/2024
Violation issued (HPD, closed)
C
02/07/2024
Violation issued (HPD, closed)
B
02/07/2024
Violation issued (HPD, closed)
C
01/26/2024
Violation issued (HPD, closed)
A
01/26/2024
Violation issued (HPD, closed)
B
01/26/2024
Violation issued (HPD, closed)
A
01/26/2024
Violation issued (HPD, closed)
A
01/26/2024
Violation issued (HPD, closed)
B
01/26/2024
Violation issued (HPD, closed)
A
01/26/2024
Violation issued (HPD, closed)
A
01/17/2024
Violation issued (HPD, closed)
C
01/17/2024
Violation issued (HPD, closed)
C
01/11/2024
Permit issued — Solar
Q00971802-I1-SL
01/08/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
Q00971802-P1
01/05/2024
Special inspection requirement — Final
01/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
01/05/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
01/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
01/05/2024
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
01/05/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
12/27/2023
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
Q00971802-I1
11/05/2022
Signed off — Alteration
Q00545180-I1
10/05/2022
Violation issued (HPD, closed)
B
10/05/2022
Violation issued (HPD, closed)
B
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPALLADIUM CONSTRUCTION CO09/02/2026
DOB NOWSuspended ScaffoldPermit IssuedELITE QUALITY CONS & CONT08/12/2026
DOB NOWSidewalk ShedPermit IssuedALPHA SCAFFOLDING INC07/31/2026
DOB NOWSolarSigned-offBEST ENERGY POWER 2015 LL01/11/2024
DOB NOWGeneral ConstructionSigned-offELITE QUALITY CONSTRUCTIO09/08/2021
DOB NOWGeneral ConstructionSigned-offELITE QUALITY CONSTRUCTIO07/15/2021
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING06/24/2021
BISOTISSUEDELITE QUALITY CONSTRUCTIO08/22/2022
BISOTISSUEDELITE QUALITY CONSTRUCTIO10/06/2021
BISOTISSUEDELITE QUALITY CONSTRUCTIO10/28/2020
BISPLISSUEDPRECISION PLBG SVCS., INC02/26/2016
BISOTISSUEDTHREE STAR CONSTRUCTION G02/01/2016
BISPLISSUEDJOSEPH FERRIGNO P&H CO08/21/2000
3 projects · most recent 03/07/2024
General Wiring
FiledStatusContractorScope
03/07/2024CompleteBERTRAM ELECTRIC CONTNG—
02/28/2024Permit IssuedCREATIVE CABLNG & BERTRAMGeneral Wiring
06/23/2021Permit IssuedRICHARD NEU—
1 project · most recent 07/30/2026
Sidewalk Shed
FiledStatusContractorScope
07/30/2026Permit IssuedALPHA SCAFFOLDING INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
06/16/2026MasonryRaul Maytaspecial
06/16/2026Tenant Protection Plan ComplianceRaul Maytaspecial
06/15/2026FinalRaul Maytaprogress
04/12/2024FinalJames Clancyprogress
04/12/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
04/12/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
04/12/2024Energy Code Compliance InspectionsJames Clancyprogress
04/12/2024Air barrier - visual inspectionJames Clancyenergy_progress
04/12/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)James Clancyspecial
01/05/2024Final—progress
01/05/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
01/05/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
01/05/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
01/05/2024Energy Code Compliance InspectionsJames Clancyprogress
01/05/2024Air barrier - visual inspectionJames Clancyenergy_progress
07/13/2021Wall Panels, Curtain Walls, and VeneersRaul Maytaspecial
07/13/2021FinalRaul Maytaprogress
07/13/2021Energy Code Compliance InspectionsRaul Maytaprogress
06/23/2021FinalRAFI HAMIDprogress
06/16/2021FinalRaul Maytaprogress
06/16/2021Energy Code Compliance InspectionsRaul Maytaprogress
06/07/2021Wall Panels, Curtain Walls, and VeneersRaul Maytaspecial
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026Q00535445-P1Request digital key ↗
08/27/2026Q00535445-I1Request digital key ↗
08/27/2026Q00545180-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
10/28/2020421903300Open ↗
03/02/2016421261921Open ↗
02/04/2016421261921Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
11/01/2019421903300Open ↗
06/07/2016421261921Open ↗
02/04/2016421261921Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00535445-P1Open ↗
08/27/2026Q00535445-I1Open ↗
08/22/2026Q00971802-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/30/2026Q00971802-I1Open ↗
09/30/2026Q00971802-I1Open ↗
09/30/2026Q00971802-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/30/2026Q00971802-I1Open ↗
09/30/2026Q00971802-I1Open ↗
09/30/2026Q00971802-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
11/01/2019421903300Open ↗
11/01/2019421903300Open ↗
02/04/2016421261921Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/01/2019421903300Open ↗
02/04/2016421261921Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/01/2019421903300Open ↗
02/04/2016421261921Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/07/2016421261921Open ↗
02/04/2016421261921Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
02/04/2016421261921Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00535445-P1Open ↗
08/27/2026Q00535445-I1Open ↗
08/16/2026Q01417167-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/04/2016421261921Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026Q00971802-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/01/2019421903300Open ↗
02/04/2016421261921Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00971802-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/01/2019421903300Open ↗
02/04/2016421261921Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
11/01/2019421903300Open ↗
02/04/2016421261921Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/16/2026Q01434448-I1Open ↗