← Back
BuildNYC
Elevator cooperative
Sanford Kissena
42-11 KISSENA BOULEVARD · BIN 4443481
💬 Discuss this project
1924Year Built
6Stories
D4Building Class
R7-1Zoning
—Gross Floor Area
96Units
16 Active Violations 3 likely answered ▸FDNY Report ↗
Elevator cooperative · Owner of record: Sanford Kissena Owners · 2.08 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exterior8203 3rd Ave Property LLC2p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sanford Kissena Owners1203/22/2026
DOB Services407/08/2026
Argo303/21/2026
Daral Properties203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lucid Building Engineering106/11/2024
Enthink Engineers101/07/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Building AssociatesGeneral Contractor203/21/2026
Absolute Advanced ElectricElectrical103/21/2026
Dobs Elevator CompanyElectrical103/21/2026
Solid ConceptGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Lucid Building Engineering8196106/11/2024
Building Lifecycle
09/11/2026
Elevator Category 1 inspection report filed
09/11/2026
Elevator Category 5 inspection report filed
10/20/2024
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK ASSEMBLIES AT BUILDING VESTIBULE , 1st STORY
HPD violation · open
10/20/2024
§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FLOOR AT BUILDING VESTIBULE ,…
HPD violation · open
10/20/2024
§ 27-2005 ADM code replace with new the missing concrete landing pad under drop ladder at 1ST stack from east at south at fire escape
HPD violation · open
88 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSolid Concept06/17/2024
DOB NOWGeneral ConstructionSigned-offNY Building Associates01/17/2022
BISOTISSUEDHappy Garden Construction09/25/2014
BISOTISSUEDHappy Garden Construction09/25/2014
BISEQISSUEDEverest Scaffolding04/01/2013
BISOTISSUED6th Avenue Construction02/21/2013
BISEQISSUEDEverest Scaffolding03/30/2012
BISOTISSUED6th Avenue Construction12/23/2011
BISOTISSUED6th Avenue Construction07/14/2011
BISEQISSUEDEverest Scaffolding06/03/2011
BIS—ISSUEDOakridge Building06/23/2005
BISPLISSUEDMainland PLG05/14/1999
BISPLISSUEDAriana Contracting04/18/1994
BIS—ISSUEDDeng's Construction03/02/1994
BISPLISSUEDVis PLG and Heating10/17/1990
BISOTISSUEDL. J. Contracting03/01/1990
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/02/2024Pass-Final General Construction Non-Directive 14PassView ↗
02/15/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
06/04/2024Tenant Protection Plan ComplianceYUNHO LEEspecial
64 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account