Two family converted from one family
42-15 79 STREET
QUEENS · BIN 4038013
💬 Discuss this project
1910Year Built
3Stories
B3Building Class
R5Zoning
2,970 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · Owner of record: 42-15 79TH STREET LLC · 3,469 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4215 DEVELOPMENT1203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/12/2020$967K—4215 DEVELOPMENT LLC → 42-15 79TH STREET LLC$326/sf building
05/17/2019$880K—Private party → 4215 DEVELOPMENT LLC$296/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Alan Yang Architecture DPC102/24/2025
TAN ARCHITECT P.C712/28/2023
MEHDI GHAZI, P.E., P.C.101/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IBUILD CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TJAR GROUP CORPGeneral Contractor507/08/2026
YU HUA CONSTRUCTION CORPGeneral Contractor203/21/2026
DPH PLUMBING & HTG CORPPlumbing207/08/2026
LEADING GREEN ENERGY CONGeneral Contractor107/08/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN YANG ARCHITECTURE9490102/24/2025
A & T DESIGN GROUP LLC1088512/28/2023
Building Lifecycle
All (46)Filed (9)Permit Issued (8)Signed Off (4)Violation (1)Inspection (1)Objection (4)Special Inspection (19)
07/01/2025
Signed off — Alteration
Roof solar panels installation.
Q01177723-I1
02/27/2025
Permit issued — Solar
Q01177723-I1-SL
02/24/2025
Filed — Alteration
Roof solar panels installation.
Q01177723-I1
02/06/2025
Special inspection requirement — Air barrier - visual inspection
Alan Yang
02/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alan Yang
02/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Alan Yang
02/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Alan Yang
02/06/2025
Special inspection requirement — Final
Alan Yang
11/18/2024
Signed off — Alteration
DATA CORRECTION/ INSTALLATION OF REPLACE(NEW PLUMBING, DRAINS) AND (2)HOT WATER HEATER/ ADD MISSING ITEM / AS OF 03/12/21, NEED TO MOVE GAS METER FROM INSIDE OF METER ROOM TO HALLWAY. NO METER QUANITY CHANGE. ONLY THE GAS METER LOCATION HAVE BEEN UPDATED
Q00283576-I1
01/15/2024
Objection resolved — Addressed
01/10/2024
Objection raised — Scope
12/28/2023
Filed — Alteration
DATA CORRECTION/ INSTALLATION OF REPLACE(NEW PLUMBING, DRAINS) AND (2)HOT WATER HEATER/ ADD MISSING ITEM / AS OF 03/12/21, NEED TO MOVE GAS METER FROM INSIDE OF METER ROOM TO HALLWAY. NO METER QUANITY CHANGE. ONLY THE GAS METER LOCATION HAVE BEEN UPDATED
Q00283576-P6
12/20/2023
Special inspection requirement — Energy Code Compliance Inspections
ROBERT LIN
12/20/2023
Special inspection requirement — Maintenance information
ROBERT LIN
12/20/2023
Special inspection requirement — Metering
ROBERT LIN
12/20/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ROBERT LIN
12/07/2023
Permit issued — Plumbing
Q00283576-I1-PL
04/13/2023
Signed off — Alteration
Q00297368-I1
04/13/2023
Signed off — Alteration
Q08003899-I1
12/29/2022
Filed — Alteration
DATA CORRECTION/ INSTALLATION OF REPLACE(NEW PLUMBING, DRAINS) AND (2)HOT WATER HEATER/ ADD MISSING ITEM / AS OF 03/12/21, NEED TO MOVE GAS METER FROM INSIDE OF METER ROOM TO HALLWAY. NO METER QUANITY CHANGE. ONLY THE GAS METER LOCATION HAVE BEEN UPDATED
Q00283576-P5
12/22/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/21/2022
Permit issued — Plumbing
Q00283576-I1-PL
10/04/2022
Permit issued — Curb Cut
Q08003899-I1-CC
09/14/2022
Filed — Alteration
Q08003899-I1
03/30/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/29/2021
Filed — Alteration
DATA CORRECTION/ INSTALLATION OF REPLACE(NEW PLUMBING, DRAINS) AND (2)HOT WATER HEATER/ ADD MISSING ITEM / AS OF 03/12/21, NEED TO MOVE GAS METER FROM INSIDE OF METER ROOM TO HALLWAY. NO METER QUANITY CHANGE. ONLY THE GAS METER LOCATION HAVE BEEN UPDATED
Q00283576-P4
10/29/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ROBERT LIN
10/29/2021
Special inspection requirement — Energy Code Compliance Inspections
ROBERT LIN
10/29/2021
Special inspection requirement — Maintenance information
ROBERT LIN
10/29/2021
Special inspection requirement — Metering
ROBERT LIN
08/11/2021
Permit issued — Construction Fence
Q00297368-I1-FN
04/27/2021
Permit issued — Plumbing
Q00283576-I1-PL
04/01/2021
Filed — Alteration
DATA CORRECTION/ INSTALLATION OF REPLACE(NEW PLUMBING, DRAINS) AND (2)HOT WATER HEATER/ ADD MISSING ITEM / AS OF 03/12/21, NEED TO MOVE GAS METER FROM INSIDE OF METER ROOM TO HALLWAY. NO METER QUANITY CHANGE. ONLY THE GAS METER LOCATION HAVE BEEN UPDATED
Q00283576-P3
03/24/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ROBERT LIN
03/24/2021
Special inspection requirement — Maintenance information
ROBERT LIN
03/24/2021
Special inspection requirement — Metering
ROBERT LIN
03/12/2021
Special inspection requirement — Energy Code Compliance Inspections
ROBERT LIN
01/12/2021
Filed — Alteration
DATA CORRECTION/ INSTALLATION OF REPLACE(NEW PLUMBING, DRAINS) AND (2)HOT WATER HEATER/ ADD MISSING ITEM / AS OF 03/12/21, NEED TO MOVE GAS METER FROM INSIDE OF METER ROOM TO HALLWAY. NO METER QUANITY CHANGE. ONLY THE GAS METER LOCATION HAVE BEEN UPDATED
Q00283576-P2
12/14/2020
Special inspection requirement — Energy Code Compliance Inspections
12/11/2020
Special inspection requirement — Maintenance information
Chang Tan
08/14/2020
Permit issued — Construction Fence
Q00297368-I1-FN
01/17/2020
Permit issued — Construction Fence
Q00297368-I1-FN
01/16/2020
Filed — Alteration
Q00297368-I1
12/20/2019
Objection raised — Other
12/20/2019
Objection resolved — Addressed
12/18/2019
Filed — Alteration
DATA CORRECTION/ INSTALLATION OF REPLACE(NEW PLUMBING, DRAINS) AND (2)HOT WATER HEATER/ ADD MISSING ITEM / AS OF 03/12/21, NEED TO MOVE GAS METER FROM INSIDE OF METER ROOM TO HALLWAY. NO METER QUANITY CHANGE. ONLY THE GAS METER LOCATION HAVE BEEN UPDATED
Q00283576-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offLEADING GREEN ENERGY CON02/27/2025
DOB NOWPlumbingSigned-offDW PLUMBING INC12/07/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP11/21/2022
DOB NOWCurb CutSigned-offYU HUA CONSTRUCTION CORP10/04/2022
DOB NOWConstruction FenceSigned-offTJAR GROUP CORP08/11/2021
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP04/27/2021
DOB NOWConstruction FenceSigned-offTJAR GROUP CORP08/14/2020
DOB NOWConstruction FenceSigned-offTJAR GROUP CORP01/17/2020
BIS—ISSUEDTJAR GROUP CORP04/19/2022
BIS—ISSUEDTJAR GROUP CORP08/11/2021
BIS—ISSUEDTJAR GROUP CORP02/19/2021
BIS—ISSUEDTJAR GROUP CORP10/13/2020
BIS—ISSUEDTJAR GROUP CORP01/23/2020
BIS—ISSUEDTJAR GROUP CORP01/23/2020
2 projects · most recent 02/24/2025
General Wiring
FiledStatusContractorScope
02/24/2025CompleteKWONG MING ELECTRIC INC—
01/23/2020CompleteINTELOGIC ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/22/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
02/06/2025Air barrier - visual inspectionAlan Yangenergy_progress
02/06/2025Fire-Resistant Penetrations and JointsAlan Yangspecial
02/06/2025Structural Stability – Alterations of existing buildingsAlan Yangspecial
02/06/2025Energy Code Compliance InspectionsAlan Yangprogress
02/06/2025FinalAlan Yangprogress
12/20/2023Energy Code Compliance InspectionsROBERT LINprogress
12/20/2023Maintenance informationROBERT LINenergy_progress
12/20/2023MeteringROBERT LINenergy_progress
12/20/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationROBERT LINspecial
10/29/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationROBERT LINspecial
10/29/2021Energy Code Compliance InspectionsROBERT LINprogress
10/29/2021Maintenance informationROBERT LINenergy_progress
10/29/2021MeteringROBERT LINenergy_progress
03/24/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationROBERT LINspecial
03/24/2021Maintenance informationROBERT LINenergy_progress
03/24/2021MeteringROBERT LINenergy_progress
03/12/2021Energy Code Compliance InspectionsROBERT LINprogress
12/14/2020Energy Code Compliance Inspections—progress
12/11/2020Maintenance informationChang Tanenergy_progress
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Plumbing6
08/28/2026Q00283576-P5Request digital key ↗
08/28/2026Q00283576-P4Request digital key ↗
08/28/2026Q00283576-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch2
08/25/2026Q08003899-I1Request digital key ↗
08/20/2026Q01177723-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00297368-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION7
12/26/2023421737204Open ↗
02/22/2022421737204Open ↗
12/27/2019421737204Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
06/10/2022421737204Open ↗
10/29/2020421737204Open ↗
01/31/2020421737204Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
07/13/2022421737204Open ↗
10/21/2020421737204Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
08/23/2022421917304Open ↗
07/28/2022421737204Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
03/09/2023421737204Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/10/2023421737204Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026Q00283576-P3Open ↗
08/31/2026Q00283576-P3Open ↗
08/31/2026Q00283576-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026Q00283576-P2Open ↗
08/28/2026Q00283576-P6Open ↗
08/28/2026Q00283576-P5Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
02/03/2020421737204Open ↗
01/31/2020421737204Open ↗
01/06/2020421737204Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026Q00283576-P3Open ↗
08/30/2026Q01177723-I1Open ↗
08/30/2026Q01177723-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment4
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
09/30/2024421737204Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
09/30/2024421737204Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/09/2023421737204Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
03/10/2023421737204Open ↗
▸Safety & Tenant Protection4
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
01/31/2020421737204Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/31/2020421737204Open ↗
▸BISSTREET TREE CHECKLIST1
07/30/2019421737204Open ↗
▸BISSTREET TREE SIGNOFF1
11/26/2024421737204Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/28/2026Q00283576-P5Open ↗
08/28/2026Q00283576-P4Open ↗
08/28/2026Q00283576-P3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/06/2020421737204Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/03/2020421737204Open ↗
10/01/2019421737204Open ↗
07/30/2019421737204Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/30/2024421737204Open ↗
▸BISINTERIOR LIGHTING POWER1
09/30/2024421737204Open ↗
▸BIS* SOLAR READY REQUIREMENTS1
09/30/2024421737204Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/30/2024421737204Open ↗
▸BISFENESTRATION AREAS1
09/30/2024421737204Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
09/30/2024421737204Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
09/30/2024421737204Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/30/2024421737204Open ↗
▸BIS* HVAC INSULATION AND SEALING1
09/30/2024421737204Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/12/2023421737204Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
09/30/2024421737204Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
01/31/2020421737204Open ↗
01/31/2020421737204Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/30/2024421737204Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
07/30/2025421737204Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/30/2024421737204Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/30/2024421737204Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
09/30/2024421737204Open ↗
▸BISMASONRY1
09/30/2024421737204Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
09/30/2024421737204Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/12/2023421737204Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
09/30/2024421737204Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/30/2024421737204Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
09/30/2024421737204Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
01/31/2020421737204Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/06/2020421737204Open ↗
▸BISMECHANICAL SYSTEMS1
09/30/2024421737204Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/28/2023421737204Open ↗
01/06/2020421737204Open ↗
01/06/2020421737204Open ↗
▸BISSUPERSEDING LETTER2
06/10/2022421737204Open ↗
10/29/2020421737204Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
07/30/2019421737204Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
08/29/2025421737204Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/27/2022421917304Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01177723-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
08/29/2025421737204Open ↗
07/30/2019421737204Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/10/2023421737204Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION7
11/25/2024421737204Open ↗
12/28/2023421737204Open ↗
03/27/2023421737204Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET4
12/27/2019421737204Open ↗
10/21/2019421737204Open ↗
09/27/2019421917304Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
10/29/2020421737204Open ↗
▸Other Documents8
▸BISPLOT DIAGRAM2
03/10/2023421737204Open ↗
01/06/2020421737204Open ↗
▸BISSHUTOFF DAMPERS1
09/30/2024421737204Open ↗
▸BISLOWEST FLOOR ELEVATION1
09/30/2024421737204Open ↗
▸BISMAINTENANCE INFORMATION1
09/30/2024421737204Open ↗
▸BISPERMANENT CERTIFICATE1
09/30/2024421737204Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/31/2020421737204Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
09/30/2024421737204Open ↗