← Back
Two family frame
42-16 77 STREET
QUEENS · BIN 4037793
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R5Zoning
2,244 sfGross Floor Area
2Units
0 Open Violations
Two family frame · 3,000 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/19/2025$1.4M—Private party → Private party$611/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.508/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor204/09/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129508/29/2025
Building Lifecycle
All (29)Filed (5)Permit Issued (3)Signed Off (3)Violation (1)Inspection (5)Special Inspection (12)
01/28/2026
Signed off — Alteration
INTERIOR RENOVATION OF AN EXISTING 2-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01237682-S1
01/13/2026
Signed off — Alteration
INTERIOR RENOVATION OF AN EXISTING 2-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01237682-S2
01/12/2026
Signed off — Alteration
INTERIOR RENOVATION OF AN EXISTING 2-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01237682-I1
01/09/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/24/2025
Violation issued (ECB, closed)
Construction
09/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
09/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
09/02/2025
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
09/02/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
09/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
09/02/2025
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
09/02/2025
Special inspection requirement — Fenestration areas
MEHDI GHAZI
08/29/2025
Filed — Alteration
INTERIOR RENOVATION OF AN EXISTING 2-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01237682-P4
08/21/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/18/2025
Filed — Alteration
INTERIOR RENOVATION OF AN EXISTING 2-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01237682-P3
08/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
08/18/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
08/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
08/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
08/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
08/01/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/25/2025
Permit issued — Structural
Q01237682-S2-ST
06/19/2025
Filed — Alteration
INTERIOR RENOVATION OF AN EXISTING 2-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01237682-S2
06/16/2025
Permit issued — General Construction
Q01237682-I1-GC
06/13/2025
Permit issued — Plumbing
Q01237682-S1-PL
06/11/2025
Filed — Alteration
INTERIOR RENOVATION OF AN EXISTING 2-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01237682-S1
06/11/2025
Filed — Alteration
INTERIOR RENOVATION OF AN EXISTING 2-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01237682-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offL&L CONSTRUCTION DEVELOP06/25/2025
DOB NOWGeneral ConstructionSigned-offL&L CONSTRUCTION DEVELOP06/16/2025
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO06/13/2025
1 project · most recent 11/20/2025
General Wiring
FiledStatusContractorScope
11/20/2025CompleteP.L. ELEC'L CONTR'G CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/09/2026Pass-Final General Construction Non-Directive 14PassView ↗
08/21/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/01/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
09/02/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
09/02/2025Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
09/02/2025Concrete - Cast-In-PlaceMEHDI GHAZIspecial
09/02/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
09/02/2025Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
09/02/2025Fenestration air leakageMEHDI GHAZIenergy_progress
09/02/2025Fenestration areasMEHDI GHAZIenergy_progress
08/18/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
08/18/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
08/18/2025HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
08/18/2025HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
08/18/2025HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026Q01237682-S2Request digital key ↗
08/20/2026Q01237682-P4Request digital key ↗
08/20/2026Q01237682-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
09/16/2026Q01237682-P3Open ↗
09/16/2026Q01237682-P3Open ↗
09/16/2026Q01237682-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026Q01237682-S1Open ↗
08/20/2026Q01237682-I1Open ↗
08/13/2026Q01237682-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/16/2026Q01237682-P3Open ↗
08/26/2026Q01237682-I1Open ↗
08/26/2026Q01237682-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026Q01237682-S1Open ↗
08/20/2026Q01237682-I1Open ↗
08/13/2026Q01237682-S2Open ↗
Showing 3 of 5 on file for this type