DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB03/08/2018FTM.WAREHOUSE TYPE STRUCT W/WOOD BOWSTRING TRUSS ROOFF.JOB#440199170 TO RPR THE TRUSS WAS DISAPPROVED ON 3/5/15.NO SUBSEQUENT APP HAVE BEEN FILED W/DOB.FAIL TO OBTAIN DEPT APPROVAL&OBTAIN PERM IN TIMELY FASHION WILL BE A BREACH.REMEDY:RPR DWGS PREP BY LIC PE TO BE FILED W/DOB NO LATER 4/9/18.WRK UND PERM BEG NO LATER 4/16/18
DOB06/23/2017VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB06/23/2017VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB12/16/2016VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB12/16/2016VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB09/12/2014FAIURE TO COMPLY WITH A COMMISSIONER'S ORDER. THE BUILDING IS A WARE- HOUSE-TYPE STRUCTURE WITH A WOOD BOWSTRING TRUSS/ROOF. THE DEPARTMENT SERVED YOU WITH A CURABLE COMMISSIONER'S ORDER (NOTICE OF VIOLATION) TO PRODUCE AN ENGINEER'S REPORT ON YOUR BUILDING. NO ENGINEER'S REPORT HAS BEEN RECEIVED
DOB06/26/2014NYC ADMIN CODE- ADD'L OCCUP 1 STORY BLDG WITH WOOD BOWSTRING ROOF REMEDY:W/I 60 DAYS OF INSPECTION OWNER TO ENGAGE A NYS LICENSED PE EX W/ WOOD TRUSS TO PROBE AND EVALUATE STRUCTURAL SOUNDNESS USING FIELD VERIF,CALCS,PROBES,ECT. EACH TRUSS AND BEARING TO BE EVAL. ANY DEF TO BE SHORED. REPAIR DRWINGS TO BE FILED WITH DOB WITHIN 45 DAYS AFTER IN