ECB11/12/2025FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. DURING INSPECTION, IT WAS OBSERVED THAT THERE ARE SEVERAL CURTAIN WALL PANELS THAT ARE CRACKED AT EXPOSURE 1 AND 4 OF THE FACADE, REPAIR AND/REPLACE$12K due
DOB01/22/2025FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/08/2025FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/08/2025FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB11/14/2024FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE DOCUMENTING THE CONDITIONS OF PSID#Q0003116 BY THE AUGUST 1,2024 DEADLINE.TO DATE,THE DEPARTMENT HAS$12K due
ECB11/08/20243303.2.3.1TEMPORARY LIGHTING FOR CONSTRUCTION SITES.NOTICED 18 STORY BUILDING WITH STOP WORK ORDER .AT VARIOUS LOCATION I OBSERVED NO CONSTRUCTION LIGHTING CREATING DARK PASSAGEWAY AND DARK STAIRCASE. THIS CR$10K due
ECB11/08/2024AT TIME OF INSPECTION ON OF A 18 STORY BUILDING WITH A STOP WORK ORDER , I OBSERVED # 3FLAMMABLE OXYGEN TANKS UN STORED PROPERLY AS PER FDNY AT 1ST FLOOR LEVEL, IMPROPER STORAGE OF COMBUSTIBLE MATERIALS COULD$12K due
ECB11/08/2024FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. A TIME OF INSPECTION I OBSERVED THAT STANDPIPE SYSTEM IS NOT PRESSURIZED. STANDPIPE SYSTEM MUST BE PRESSURIZED AS PER 3303.7.7.2 OF NYC BC, REPAIR AND/REPL$6K due
ECB11/08/20243301.2 HOLES IN FLOOR. AT TIME OF INSPECTION I OBSERVED HOLES GREATER THEN 2 INCHES COVERED BY 2 PLANKS THROUGHOUT JOBSITE HOLES WERE APPROX. 5X5 AND NOT PROPERLY COVERED.;CREATING A HAZARD FOR WORKERS AND PERS$10K due
DOB04/13/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB02/02/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/19/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB01/13/2022SEC. AC 27-1009(2) FAILURE TO SAFEGUARD PUBLIC AFFECTED BY CONSTRUCTION OPERATIONS. I OBSERVED PERIMETER FENCE AT EXP#3 HAD A 4X6' OPENING ALLOWING UNOBSTRUCTED ACCESS FROM TENANTS OF THE NEIGHBORING BLDG TO AC$10K due
ECB01/13/2022UNLAWFULLY CONTINUED WORK WHILE ON NOTIE OF A STOP WORK ORDER(SWO). I OBSERVED SEVERAL WORKERS UNLOADING MATERIALS FROM A CONTAINER ON THE ROADWAY INTO THE CONSTRUCTION SITE. WORKERS HAD TO CROSS AN ACTIVE SIDE$25K due
DOB12/22/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB11/24/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB11/24/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB11/24/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB11/24/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB11/24/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB11/12/2021FAILURE TO COMPLY WITH A COMMISSIONER'S ORDER(COMMISSIONER'S ORDER MANDATING SCO)AT TIME OF INSPECTION ON AN ACTIVE 18 STORY NEW BUILDING CONSTRUCTION SITE,NOTICE ACTIVE WORK ONSITE.ALSO OBSERVED THAT THE CONTR$25K due
ECB10/25/2021UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. FOR COMPLAINT#4812664. AT TIME OF INSPECTION ON AN ACTIVE 18 STY NB CONSTRUCTION SITE NOTICE 2 INDIVIDUALS ON SITE ONE AT EXP#1 ON 2 PHONE THE OTH$25K due
ECB10/25/2021PERMIT HOLDER FAILED TO PROVIDE ACCESS OR EXPOSE CONSTRUCTION WORK ON ACTIVE SITE. AT TIME OF INSPECTION ON AN ACTIVE 18 STY NO CONSTRUCTIONSITE NOTICE AN INDIVIDUAL ON SITE,WHEN I CALLED OUT STATING MY NAME &$10K due
ECB10/19/2021FAILURE OF PERMIT HOLDER TO PROVIDE INSPECTION ACCESS TO AND/OR EXPOSEONGOING CONSTRUCTION OR WORK ON AN ACTIVE AND PERMITTED WORK SITE.AT TIME OF INSPECTION AT A 18 STORY NEW BUILDING,OBSERVED THAT JOBSITE IS$10K due
ECB09/13/2021UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF STOP WORK ORDER. AT TIME OF INSPECTION ON AN ACTIVE PERMIT 18 STY NEW BLDG W/1 PARTIAL STOP WORK ORDER COMPLAINT#4738045 2 FULL STOP WORK ORDER COMPLAINT#4812664/#48$25K due
ECB09/01/2021BC3314.4.8 FAILURE TO MAINTAIN PIPE SCF AS PER CODE ATOI ON ACTIVE 18STYNB CONST SITE NOTICE PIPE SCF THAT CONTRACTOR WORKERS FAILED TO MAINTAIN AS PER CODE SCF WAS ON 17&18FL SCF HALL (1)INADEQUATE PLANKING,(2$6K due
ECB09/01/2021FAILURE TO MAINTAIN/DISPLAY ONSITE DOCS ATOI ON ACTIVE 18STYNB CONST SITE WHEN REQUEST WAS MADE FOR ALL APPROVE DOCS THAT AS PER CODE REQUIRED TO REMAIN ONSITE REQUESTED DOCS WERENT PROVIDED (1)APPROVE CONST DR$12K due
ECB09/01/2021AC28-111.1 NO TEMP C/O-TCO/TEMP USE PERMIT (MODEL APT/SALES OFFICE) ATOI ON ACTIVE 18STYNB CONST SITE NOTICE ON 3&4FL OF CONST SITE 2MODEL APT THAT WHEN REQUEST WAS MADE FOR TCO FOR TEMP USE PERMIT/TCO COULDNT$12K due
ECB09/01/2021UNLAWFULLY CONTD WORK WHILE ON NOTICE OF SWO.ATOI ON ACTIVE 18STYNB CONST SITE,NOTICE@EXP3 OF CONST WALKWAY THAT ONCE WAS OPEN SIDE OF EXCAVATION THAT INSTRUCTION WAS GIVEN TO CONTRACTOR W/V INSTRUCTING NO FURT$25K due
ECB09/01/2021FAILURE TO PROVIDE SAFETY EQUIPMENT OR INFORM WORKERS OF DANGER AFFECTED BY CONST OPS-FAILURE TO PROVIDE FALL PROTECTION.ATOI ON ACTIVE 18STYNB CONST SITE.NOTICE EXTENSIVE AMY OF OPENINGS UNPROTECTED&W/O FALL P$25K due
ECB09/01/2021WORK W/O PERMIT ATOI ON ACTIVE 18STYNB CONST SITE.NOTICE MINI CRANE ON1FL BACK OF BLDG OVERHANGING DRIVEWAY DOWN TO GARAGE INSIDE BLDG WHEN REQUEST WAS MADE FOR PERMIT FOR THIS CRANE ALONG W/DRAWINGS,LOADS IMPO$12K due
ECB03/18/2021EMERGENCY VENT NOT PIPED CORRECTLY MUST BE COMBINED AND TERMINATE OUTDOORS MC 1305.8 CONSTRUCTION DOCUMENTS SHALL SHOW CORRECT OIL LINE SIZING FGC 106.7 PORTABLE FIRE EXTINGUISHER SHALL BE PROVIDED MC 1301.8 OW$6K due
DOB08/07/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/29/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB02/28/2019FAILURE TO HAVE SITE SAFETY MANAGER PRESENT AS REQUIRED . AT THE TIME OF INSPECTION ON AN ACTIVE 18 STORY BUILDING WHEN SITE SAFETY MANAGER WAS REQUESTED BY INSPECTOR AT TIME OF INSPECTION NO ON ON THE JOB WAS$10K due
ECB02/14/2019FAILURE TO HAVE SITE SAFETY MANAGER PRESENT AS REQUIRED. @ TIME OF INSP. ON AN ACTIVE 18 STORY BLDG WHEN SITE SAFETY MANAGER WAS REQUESTED BY INSPECTOR @ TIME OF INSP. NO ONE ON SITE WAS ABLE TO LOCATE DESIGNAT$10K due
DOB05/04/2016V-DOB VIOLATION - ACTIVE
ECB04/29/2025FAILURE TO MAINTAIN THE FACADE OF THE BUILDING. AT TIME OF INSPECTION, IT WAS OBSERVED THAT THERE ARE SEVERAL CURTAIN WALL PANELS THAT ARE CRACKED AT EXPOSURE 1 AND 4 OF THE FACADE., REPAIR AND/REPLACEHearing held — result not yet published$2K proposed
ECB08/25/2010212-10 MISC VIO OF THE ZONING RESOLUTION NOTED VACANT LOT BEING USED AS COMMERCIAL PARKING STORAGE SPACE FOR SEVERAL COMMERCIAL & NON COMMERCIAL VEHICLES PREMISES HAS NOT PERMITTED FOR IN R7-1 DISTRICT FOR USAGNothing owed — awaiting certificate of correction
ECB08/25/2010ALTERED CHANGED BLDG OCCUPIED W/O A VALID C OF O NOTED SAID BLDG HAS BEEN DEMOLISH UNDER JOB 402675967 SIGNED OFF 7/14/08 AS A VACANT LOT NOW BLDG BEING USED & OCCUPIED AS A COMMERCIAL NON COMMERCIAL PARKINGNothing owed — awaiting certificate of correction