← Back
One family attached or semi-detached
42-25 191 STREET
QUEENS · Auburndale · BIN 4121088
💬 Discuss this project
1950Year Built
2Stories
A5Building Class
R3XZoning
2,035 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,225 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALPHA HOME DESIGN LLC207/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LC EXPEDITING SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHAMP PLUMBING & HTG CORPPlumbing107/08/2026
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (4)
08/11/2021
Signed off — Alteration
CAP & REMOVE ILLEGAL GAS STOVE, SINK & 3-PC BATHROOM FIXTURES AT CELLAR TO REMOVE ECB VIOLATION#35413813K AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00540151-I1
08/04/2021
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
08/04/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
YAN GAO
07/29/2021
Filed — Alteration
CAP & REMOVE ILLEGAL GAS STOVE, SINK & 3-PC BATHROOM FIXTURES AT CELLAR TO REMOVE ECB VIOLATION#35413813K AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00540151-P1
07/26/2021
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
07/26/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
YAN GAO
07/12/2021
Permit issued — Plumbing
Q00540151-I1-PL
06/15/2021
Filed — Alteration
CAP & REMOVE ILLEGAL GAS STOVE, SINK & 3-PC BATHROOM FIXTURES AT CELLAR TO REMOVE ECB VIOLATION#35413813K AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00540151-I1
05/05/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCHAMP PLUMBING & HTG CORP07/12/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/04/2021Energy Code Compliance InspectionsYAN GAOprogress
08/04/2021HVAC-R and service water piping design and insulationYAN GAOenergy_progress
07/26/2021Energy Code Compliance InspectionsYAN GAOprogress
07/26/2021HVAC-R and service water piping design and insulationYAN GAOenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026Q00540151-I1Request digital key ↗
08/27/2026Q00540151-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026Q00540151-I1Open ↗
08/25/2026Q00540151-I1Open ↗
08/22/2026Q00540151-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q00540151-P1Open ↗
08/13/2026Q00540151-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00540151-I1Open ↗
08/13/2026Q00540151-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00540151-I1Open ↗