← Back
Elevator apt, fireproof without stores
42-25 65 PLACE
QUEENS · BIN 4031733
💬 Discuss this project
1965Year Built
6Stories
D3Building Class
R4-1Zoning
38,924 sfGross Floor Area
58Units
LL97 CoveredRent Stabilized31 Open Violations ▸FISP: SAFE
Elevator apt, fireproof without stores · Owner of record: HYATT AVENUE ASSOCIATES LLC · 9,600 sf lot · 4.05 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A B C D CONSTRUCTION807/08/2026
T-MOBILE303/22/2026
HYATT AVENUE ASSOCIATES1903/22/2026
WOODSIDE 651703/22/2026
ATANDISH REALTY CORP103/22/2026
URBAN AMERICAN PARTNERS ,203/22/2026
NYA203/22/2026
N Y A LLC203/22/2026
STANDISA REALTY CORP103/22/2026
STANDISH REALTY203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRANT ENGINEERING CONSULTANTS, LLC112/16/2022
O&S ASSOCIATES201/25/2022
BITOPI CONSULTANTS LLC105/27/2021
THE MTM DESIGN GROUP, LLC102/04/2021
GREEN DESIGN101/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES203/21/2026
AK CONSULTING SERVICES203/21/2026
O S ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.B.C.D. CONSTRUCTION CORGeneral Contractor807/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor303/21/2026
WATCH HILL WIRELESS SOLUGeneral Contractor303/21/2026
FILARDI, JAMESElectrical103/21/2026
VIALVA, JOSEPHElectrical103/21/2026
BECKER, CHARLESElectrical103/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRANT ENGINEERING CONSULT3512112/16/2022
R MARSAC CONSULTING LLC329112/16/2022
O&S ASSOCIATES2753201/25/2022
BITOPI CONSULTANTS LLC7036105/27/2021
THE MTM DESIGN GROUP, LLC1319102/04/2021
Building Lifecycle
All (113)Filed (6)Permit Issued (8)Signed Off (3)Facade (FISP) (15)Violation (60)Inspection (9)Objection (2)Special Inspection (10)
11/22/2023
Violation issued (HPD, closed)
C
09/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/25/2023
Signed off — Alteration
Decommission of existing Sprint site. Remove 19 antennas and equipment from the roof. Service connection in basement. Initial installation approved under application #401184419
Q08044787-I1
06/24/2023
Violation issued (HPD, open)
C
05/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/04/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/14/2023
Violation issued (HPD, open)
B
02/14/2023
Violation issued (HPD, closed)
A
02/06/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/18/2023
Permit issued — Antenna
Q08044787-I1-AN
12/22/2022
Objection raised — Scope
12/22/2022
Objection resolved — Addressed
12/16/2022
Filed — Alteration
Decommission of existing Sprint site. Remove 19 antennas and equipment from the roof. Service connection in basement. Initial installation approved under application #401184419
Q08044787-I1
10/24/2022
Violation issued (HPD, closed)
C
10/24/2022
Violation issued (HPD, closed)
C
10/06/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/01/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/17/2022
Violation issued (HPD, closed)
A
06/15/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/15/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/10/2022
Violation issued (HPD, open)
B
05/10/2022
Violation issued (HPD, open)
B
04/06/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q00461526-I1
03/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/22/2022
Violation issued (HPD, open)
C
03/22/2022
Violation issued (HPD, open)
A
02/18/2022
Cycle 9 facade report signed — SAFE
02/03/2022
Cycle 9 facade report submitted
01/31/2022
Permit issued — Supported Scaffold
Q00530371-I1-SF
01/27/2022
Signed off — Alteration
Exterior Wall Repairs
Q00468666-I1
01/27/2022
Cycle 9 facade inspection completed
01/26/2022
Special inspection requirement — Masonry
TIMOTHY WEBB
01/26/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
TIMOTHY WEBB
01/26/2022
Special inspection requirement — Final
TIMOTHY WEBB
01/25/2022
Filed — Alteration
Exterior Wall Repairs
Q00468666-P1
01/25/2022
Special inspection requirement — Masonry
TIMOTHY WEBB
01/25/2022
Special inspection requirement — Final
TIMOTHY WEBB
01/25/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
TIMOTHY WEBB
01/20/2022
Violation issued (HPD, open)
B
01/20/2022
Violation issued (HPD, open)
B
01/16/2022
Violation issued (HPD, closed)
A
01/16/2022
Violation issued (HPD, closed)
A
01/16/2022
Violation issued (HPD, closed)
A
12/07/2021
Violation issued (HPD, open)
C
12/07/2021
Violation issued (HPD, open)
B
12/07/2021
Violation issued (HPD, open)
B
12/07/2021
Violation issued (HPD, closed)
A
12/07/2021
Violation issued (HPD, open)
B
12/03/2021
Violation issued (ECB, closed)
Local Law
11/15/2021
Permit issued — Supported Scaffold
Q00530371-I1-SF
11/15/2021
Permit issued — General Construction
Q00468666-I1-GC
09/17/2021
Permit issued — Sidewalk Shed
Q00461526-I1-SH
07/08/2021
Violation issued (HPD, closed)
C
06/28/2021
Permit issued — General Construction
Q00468666-I1-GC
05/27/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 42-25 65TH PLACE, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00530371-I1
05/27/2021
Permit issued — Supported Scaffold
Q00530371-I1-SF
05/27/2021
Special inspection requirement — Post-installed Anchors
KAMRUL AHSAN
04/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/12/2021
Filed — Alteration
Exterior Wall Repairs
Q00468666-I1
02/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offWATCH HILL WIRELESS SOLU01/18/2023
DOB NOWSupported ScaffoldPermit IssuedA.B.C.D. CONSTRUCTION COR01/31/2022
DOB NOWSupported ScaffoldPermit IssuedA.B.C.D. CONSTRUCTION COR11/15/2021
DOB NOWGeneral ConstructionSigned-offA.B.C.D. CONSTRUCTION COR11/15/2021
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/17/2021
DOB NOWGeneral ConstructionSigned-offA.B.C.D. CONSTRUCTION COR06/28/2021
DOB NOWSupported ScaffoldPermit IssuedA.B.C.D. CONSTRUCTION COR05/27/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC01/29/2021
BISOTISSUEDDELWAR HUSSAIN01/09/2015
BISPLISSUEDBLUEWATER PLBG& HTG INC07/08/2014
BISMHISSUEDRAMAPO COMMUNICATION CORP06/19/2014
BISOTISSUEDRAMAPO COMMUNICATION CORP06/17/2014
BISOTISSUEDODYSSIA GLOBAL COMM. CORP03/12/2013
BISOTISSUEDODYSSIA GLOBAL COMM. CORP10/12/2012
BISOTISSUEDODYSSIA GLOBAL COMM. CORP01/26/2010
BISOTISSUEDBCI COMMUNICATIONS INC01/20/2009
BISOTISSUEDBCI COMMUNICATIONS, INC.02/27/2008
BISOTISSUEDBCI COMMUNICATIONS, INC.12/07/2007
BISOTISSUEDNEXIGON COMMUNICATIONS, INC.07/26/2007
BISOTISSUEDTELCOM ENGINEERING GP INC05/29/2007
BISOTISSUEDWTW USA LLC04/11/2007
BISOTISSUEDDKM TECHNOLOGIES INC03/26/2007
BISOTISSUEDARETE DEVELOPMENT INC02/22/2007
BISFSISSUEDSTAR INDUSTRIAL SERVICE CO. INC09/25/2006
BISOTISSUEDVERTICAL SOLUTIONS INC06/26/2006
BISPLISSUEDMETROPOLITAN HEAT & POWER CO02/12/2001
BISFBISSUEDMETROPOLITAN HT&POWER CO02/12/2001
BISOTISSUEDODYSSIA GENERAL CONTRACTING, INC01/17/2001
1 project · most recent 03/01/2021
FiledStatusContractorScope
03/01/2021CompleteBOROWIDE ELECT'L CONTR'S—
1 project · most recent 05/27/2021
Scaffold
FiledStatusContractorScope
05/27/2021Permit IssuedA.B.C.D. CONSTRUCTIONScaffold
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/04/2023Fail-Final CND-Occupancy InspectionFailView ↗
02/06/2023Fail-Final CND-Occupancy InspectionFailView ↗
10/06/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/01/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/15/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
01/26/2022MasonryTIMOTHY WEBBspecial
01/26/2022Structural Stability – Alterations of existing buildingsTIMOTHY WEBBspecial
01/26/2022FinalTIMOTHY WEBBprogress
01/25/2022MasonryTIMOTHY WEBBspecial
01/25/2022FinalTIMOTHY WEBBprogress
01/25/2022Structural Stability – Alterations of existing buildingsTIMOTHY WEBBspecial
05/27/2021Post-installed AnchorsKAMRUL AHSANspecial
01/27/2021FinalSunil Saigalprogress
01/25/2021FinalRobert Tomsprogress
01/25/2021MasonryRobert Tomsspecial
▾Documents — 126 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - General Construction3
08/27/2026Q00459844-I1Request digital key ↗
08/27/2026Q00468666-P1Request digital key ↗
08/27/2026Q00468666-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/27/2026Q00530371-I1Request digital key ↗
08/15/2026Q08044787-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/27/2026Q00461526-I1Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION14
10/27/2020401184419Open ↗
10/16/2020402537073Open ↗
10/14/2020410042261Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION10
01/05/2015440188501Open ↗
07/16/2014420897435Open ↗
06/27/2014420897435Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications28
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
06/13/2017420897435Open ↗
06/05/2015420897453Open ↗
03/07/2015440188501Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/25/2026Q00530371-I1Open ↗
08/25/2026Q00468666-I1Open ↗
08/25/2026Q00468666-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00468666-I1Open ↗
08/27/2026Q00468666-P1Open ↗
08/13/2026Q00459844-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026Q00461526-I1Open ↗
08/25/2026Q00468666-I1Open ↗
08/23/2026Q00459844-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/05/2015440188501Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/05/2015440188501Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE1
04/23/2015420897435Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/03/2017420897435Open ↗
▸BISSCHEDULE B - PLUMBING1
10/15/2013420897435Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
03/05/2014420897435Open ↗
▸BISEQUIPMENT USE PERMITS1
07/03/2017420897435Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
01/05/2015440188501Open ↗
10/15/2013420897435Open ↗
10/15/2013420897453Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q08044787-I1Open ↗
08/13/2026Q00459844-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/03/2007410042261Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/05/2015420897453Open ↗
06/27/2014420897435Open ↗
10/19/2013420897435Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
12/16/2020401184419Open ↗
11/16/2020410042261Open ↗
06/13/2017420897435Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY11
12/16/2020401184419Open ↗
12/16/2020401184419Open ↗
11/16/2020410042261Open ↗
Showing 3 of 11 on file for this type
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
12/16/2020401184419Open ↗
11/16/2020410042261Open ↗
07/03/2017420897435Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
03/07/2015440188501Open ↗
01/10/2014402542799Open ↗
09/17/2013420624195Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
10/15/2013420897435Open ↗
10/15/2013420897453Open ↗
09/29/2012420624195Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
11/16/2020410042261Open ↗
06/13/2017420897435Open ↗
06/05/2015420897453Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION5
10/28/2020401184419Open ↗
10/28/2020401184419Open ↗
10/16/2020402537073Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET2
10/15/2013420897435Open ↗
10/15/2013420897453Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/05/2015440188501Open ↗