← Back
Three families
42-27 77 STREET
QUEENS · Elmhurst · BIN 4037906
💬 Discuss this project
1970Year Built
3Stories
C0Building Class
R5Zoning
3,265 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · Owner of record: XIUFENG LLC · 2,942 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 36p · 2 filings · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XIUFENG LLC2107/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/08/2020$1.3M—Private party → XIUFENG LLC$398/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT711/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ERIC & NG ELEC'L, INC.Electrical103/22/2026
MECHANICAL CONST SYS CORPElectrical103/22/2026
FLUSHING ONE CONSTRUCTIONGeneral Contractor107/08/2026
GREAT ONE CONSTRUCTION LLGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513711/28/2023
Building Lifecycle
All (87)Filed (7)Permit Issued (3)Signed Off (1)Violation (15)Inspection (7)Objection (24)Special Inspection (30)
05/06/2026
Violation issued (HPD, closed)
A
06/11/2025
Violation issued (HPD, closed)
A
04/15/2024
Violation issued (HPD, closed)
A
01/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/14/2023
Objection resolved — Addressed
12/13/2023
Objection raised — Scope
11/28/2023
Filed — Alteration CO
CONVERT EXISTING 5-DWELLING 3 STORY RESIDENTIAL BUILDING TO 3-DWELLING WITH MINOR INTERIOR RENOVATION AS PER PLAN FILED HEREWITH. CHANGE OF C/O.
Q00655111-P3
11/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
11/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
11/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
11/28/2023
Special inspection requirement — Lighting in dwelling units
DEZHANG FANG
11/28/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
11/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
11/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
11/24/2023
Violation issued (HPD, closed)
I
07/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/14/2023
Filed — Alteration CO
CONVERT EXISTING 5-DWELLING 3 STORY RESIDENTIAL BUILDING TO 3-DWELLING WITH MINOR INTERIOR RENOVATION AS PER PLAN FILED HEREWITH. CHANGE OF C/O.
Q00655111-P2
07/14/2023
Special inspection requirement — Lighting in dwelling units
DEZHANG FANG
07/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
07/14/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
07/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
07/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
07/14/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
07/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
07/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
07/13/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/12/2023
Objection resolved — Addressed
06/12/2023
Objection resolved — Addressed
06/12/2023
Objection resolved — Addressed
06/01/2023
Objection raised — Other
06/01/2023
Objection raised — Scope
06/01/2023
Objection raised — Other
05/18/2023
Signed off — Alteration
Plumbing work of 3-dwelling building as per plan filed herewith. No change in use, egress or occupancy.
Q00653876-I1
05/17/2023
Filed — Alteration CO
CONVERT EXISTING 5-DWELLING 3 STORY RESIDENTIAL BUILDING TO 3-DWELLING WITH MINOR INTERIOR RENOVATION AS PER PLAN FILED HEREWITH. CHANGE OF C/O.
Q00655111-P1
05/17/2023
Special inspection requirement — Lighting in dwelling units
DEZHANG FANG
05/17/2023
Special inspection requirement — Maintenance information
DEZHANG FANG
05/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
05/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
05/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
05/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
05/17/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
05/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
03/28/2023
Violation issued (HPD, closed)
A
02/23/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
02/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
02/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
02/15/2023
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
02/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
02/14/2023
Filed — Alteration
Plumbing work of 3-dwelling building as per plan filed herewith. No change in use, egress or occupancy.
Q00653876-P2
02/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
02/02/2023
Permit issued — General Construction
Q00655111-I1-GC
08/29/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/19/2022
Filed — Alteration
Plumbing work of 3-dwelling building as per plan filed herewith. No change in use, egress or occupancy.
Q00653876-P1
06/23/2022
Permit issued — Plumbing
Q00653876-I1-PL
06/15/2022
Permit issued — General Construction
Q00655111-I1-GC
06/07/2022
Filed — Alteration
Plumbing work of 3-dwelling building as per plan filed herewith. No change in use, egress or occupancy.
Q00653876-I1
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGREAT ONE CONSTRUCTION LL02/02/2023
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC06/23/2022
DOB NOWGeneral ConstructionPermit IssuedFLUSHING ONE CONSTRUCTION06/15/2022
2 projects · most recent 05/18/2023
General Wiring
FiledStatusContractorScope
05/18/2023CompleteMECHANICAL CONST SYS CORPGeneral Wiring
04/27/2023CompleteERIC & NG ELEC'L, INC.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/23/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
11/28/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
11/28/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
11/28/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
11/28/2023Lighting in dwelling unitsDEZHANG FANGenergy_progress
11/28/2023Maintenance informationDEZHANG FANGenergy_progress
11/28/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
11/28/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
11/28/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
07/14/2023Lighting in dwelling unitsDEZHANG FANGenergy_progress
07/14/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
07/14/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
07/14/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
07/14/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
07/14/2023Maintenance informationDEZHANG FANGenergy_progress
07/14/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
07/14/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
05/17/2023Lighting in dwelling unitsDEZHANG FANGenergy_progress
05/17/2023Maintenance informationDEZHANG FANGenergy_progress
05/17/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
05/17/2023HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
05/17/2023HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
05/17/2023Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
05/17/2023Energy Code Compliance InspectionsDEZHANG FANGprogress
05/17/2023Fire-Resistance Rated ConstructionDEZHANG FANGprogress
02/15/2023HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
Latest 25 of 39.
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026Q00653876-P1Request digital key ↗
08/25/2026Q00653876-P2Request digital key ↗
08/25/2026Q00653876-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00655111-I1Open ↗
▸Seals & Professional Certifications43
▸DOB NOWProgress Inspector Seal & Signature30
09/01/2026Q00655111-P3Open ↗
09/01/2026Q00655111-P3Open ↗
09/01/2026Q00655111-P3Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026Q00653876-P2Open ↗
08/25/2026Q00653876-P1Open ↗
08/25/2026Q00653876-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00655111-P3Open ↗
08/30/2026Q00655111-P1Open ↗
08/29/2026Q00653876-P1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/23/2026Q00655111-I1Open ↗
08/23/2026Q00655111-P2Open ↗
08/15/2026Q00655111-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026Q00653876-P2Open ↗
08/25/2026Q00653876-P1Open ↗
08/25/2026Q00653876-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00653876-I1Open ↗
08/13/2026Q00655111-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/23/2026Q00655111-P2Open ↗
08/23/2026Q00655111-I1Open ↗
08/15/2026Q00655111-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00655111-I1Open ↗