1996Year Built
2Stories
O2Building Class
R5BZoning
3,000 sfGross Floor Area
3Units
Office only, 2-6 stories · Owner of record: 4227-29 162 LLC · 2,000 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 11p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
308 CORP.103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.501/05/2025
HWL ENGINEERING PC110/16/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC1003/21/2026
ZL BUILDING ASSOCIATE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIMROSE SERVICE INCGeneral Contractor603/21/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129501/05/2025
Building Lifecycle
All (31)Filed (6)Permit Issued (4)Signed Off (4)Inspection (4)Special Inspection (13)
03/13/2025
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN AN EXISTING COMMERCIAL SPACE AT 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01112245-S1
02/13/2025
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN AN EXISTING COMMERCIAL SPACE AT 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01112245-S2
02/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/11/2025
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN AN EXISTING COMMERCIAL SPACE AT 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01112245-I1
02/10/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/24/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/21/2025
Signed off — Alteration
INSTALL NEW ALUM. PANEL SIGN ON EXISTING BUILDING WALL
Q01126921-I1
01/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
01/05/2025
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN AN EXISTING COMMERCIAL SPACE AT 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01112245-P2
01/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
11/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/26/2024
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
11/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
11/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
11/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
11/25/2024
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN AN EXISTING COMMERCIAL SPACE AT 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01112245-P1
11/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
11/20/2024
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
11/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
11/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
11/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
10/28/2024
Permit issued — Sign
Q01126921-I1-SG
10/16/2024
Filed — Alteration
INSTALL NEW ALUM. PANEL SIGN ON EXISTING BUILDING WALL
Q01126921-I1
10/15/2024
Special inspection requirement — Final
WANLONG HE
10/08/2024
Permit issued — Mechanical Systems
Q01112245-S2-MS
10/07/2024
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN AN EXISTING COMMERCIAL SPACE AT 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01112245-S2
10/01/2024
Permit issued — Plumbing
Q01112245-S1-PL
09/30/2024
Permit issued — General Construction
Q01112245-I1-GC
09/24/2024
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN AN EXISTING COMMERCIAL SPACE AT 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01112245-S1
09/24/2024
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM IN AN EXISTING COMMERCIAL SPACE AT 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF THE BUILDING.
Q01112245-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC10/28/2024
DOB NOWMechanical SystemsSigned-offPRIMROSE SERVICE INC10/08/2024
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO10/01/2024
DOB NOWGeneral ConstructionSigned-offPRIMROSE SERVICE INC09/30/2024
BIS—ISSUEDMARINELLI CONSTRUCTION CORP.11/14/1996
BIS—ISSUEDSAME06/05/1996
BISPLISSUEDNORTON PLG09/18/1995
BISEQISSUEDSAME08/11/1995
BIS—ISSUEDSAME08/11/1995
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/10/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/24/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
01/06/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
01/03/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
11/26/2024Energy Code Compliance InspectionsMEHDI GHAZIprogress
11/26/2024HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
11/26/2024HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
11/26/2024HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
11/26/2024Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
11/20/2024Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
11/20/2024Energy Code Compliance InspectionsMEHDI GHAZIprogress
11/20/2024HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
11/20/2024HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
11/20/2024HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
10/15/2024FinalWANLONG HEprogress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026Q01126921-I1Request digital key ↗
08/21/2026Q01112245-P2Request digital key ↗
08/21/2026Q01112245-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026Q01112245-P2Open ↗
08/13/2026Q01112245-S1Open ↗
08/13/2026Q01126921-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/06/2026Q01126921-I1Open ↗
09/01/2026Q01112245-P1Open ↗
09/01/2026Q01112245-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/21/2026Q01112245-P2Open ↗
09/01/2026Q01112245-P1Open ↗
08/31/2026Q01112245-I1Open ↗
Showing 3 of 4 on file for this type