← Back
BuildNYC
Elevator cooperative
Wellesley Gardens
42-30 DOUGLASTON PARKWAY · BIN 4168744
💬 Discuss this project
1964Year Built
6Stories
D4Building Class
R1-2Zoning
101,535 sfGross Floor Area
92Units
LL97 CoveredRent Stabilized5 Active Violations ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: Wellesley Gardens Owners · 41,842 sf lot · 2.43 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDish Wireless rooftop antenna and equipment1p · 1 filing · 4 docs
CellarWellesley Gardens heat pump installation1p · 1 filing · 8 docs
Site & exteriorWellesley Gardens heat pump installation5p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Wellesley Gardens Owners1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BKH Architect111/05/2025
Always Fast Services109/04/2025
Michael L. Pinske103/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants103/21/2026
Codegreen203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Unique Mechanicalspecialty_contractor303/21/2026
BFV Communicationsspecialty_contractor303/21/2026
PSG ConstructionGeneral Contractor203/21/2026
Bridgeworks of Greater New YorkGeneral Contractor103/21/2026
Andamio ScaffoldingScaffold104/09/2026
Approved ElectricElectrical103/22/2026
Efficient Combustion & CoGeneral Contractor109/24/2014
Everest ScaffoldingGeneral Contractor107/01/2015
George Bassolino PlumbingPlumbing109/24/2014
Pinnacle RestorationGeneral Contractor105/12/2000
Telcom Engineering GroupGeneral Contractor111/19/2007
Tempa GeneralGeneral Contractor211/08/2010
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BKH Architect6255111/05/2025
Elevated Engineering3692103/22/2022
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
08/28/2026
Permit expired, never signed off — Suspended Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
Q01270079-I1-SC
08/03/2026
Co-op apartment 2P sold for $275,000
07/07/2026
Elevator Category 1 inspection report filed
05/05/2026
Boiler inspection report filed
Initial · no defects · Accepted
145 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offUnique Mechanical11/10/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/04/2025
DOB NOWSuspended ScaffoldPermit IssuedEdifice Design08/28/2025
DOB NOWAntennaSigned-offBFV Communications05/28/2022
BISEQISSUEDEverest Scaffolding07/01/2015
BISPLISSUEDG.bassolino Plumbing09/24/2014
BISOTISSUEDEfficient Combustion & Co09/24/2014
BISOTISSUEDTempa General Contracting11/08/2010
BISEQISSUEDTempa General Contracting11/08/2010
BISOTISSUEDTelcom Engineering GP11/19/2007
BISEQISSUEDPSG Construction04/23/2002
BISEQISSUEDPSG Construction02/08/2002
BISEQISSUEDBridgeworks of Greater New York02/12/2001
BISOTISSUEDPinnacle Restoration05/12/2000
BISOTISSUEDAbilene03/15/1996
4 projects · most recent 08/28/2025
General Wiring
FiledStatusContractorScope
08/28/2025CompleteBorowide Elect'l Contractors—
10/31/2023Permit IssuedElmac ElectricGeneral Wiring
07/14/2022Permit IssuedApproved ElectricGeneral Wiring
01/10/2021Permit IssuedAll Wired Up ElectricalGeneral Wiring
1 project · most recent 08/13/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
08/13/2025Permit IssuedEdifice DesignSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
10/24/2025Air barrier - visual inspectionBrandon Hamchukenergy_progress
10/24/2025HVAC-R and service water piping design and insulationBrandon Hamchukenergy_progress
10/24/2025HVAC-R and service water heating system controlsBrandon Hamchukenergy_progress
10/24/2025Insulation placement and R valuesBrandon Hamchukenergy_progress
10/24/2025HVAC-R and service water heating equipmentBrandon Hamchukenergy_progress
10/24/2025Maintenance informationBrandon Hamchukenergy_progress
10/23/2025Mechanical SystemsBrandon Hamchukspecial
10/23/2025PreliminaryBrandon Hamchukprogress
10/23/2025Fire-Resistant Penetrations and JointsBrandon Hamchukspecial
10/23/2025Structural Stability – Alterations of existing buildingsBrandon Hamchukspecial
10/23/2025Tenant Protection Plan ComplianceBrandon Hamchukspecial
10/23/2025FinalBrandon Hamchukprogress
10/23/2025Energy Code Compliance InspectionsBrandon Hamchukprogress
69 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account