← Back
Two family frame
42-42 79 STREET
QUEENS · Elmhurst · BIN 4037935
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R5Zoning
2,192 sfGross Floor Area
2Units
Two family frame · 2,675 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Roof2p · 1 filing · 4 docs
Floor 21p · 1 filing · 6 docs
Floor 12p · 2 filings · 9 docs
Cellar2p · 2 filings · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC106/26/2025
SALVATORE ITALIANO R.A.308/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CAMG DESIGN EXPEDITING GROUP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SEGURA CONTRACTING CORPGeneral Contractor107/08/2026
JUST PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854106/26/2025
Building Lifecycle
All (14)Filed (4)Permit Issued (3)Signed Off (3)Inspection (4)
08/13/2025
Signed off — Alteration
Q01245644-I1
07/01/2025
Permit issued — Solar
Q01245644-I1-SL
06/26/2025
Filed — Alteration
Q01245644-I1
12/09/2022
Signed off — Alteration
Application file to proposed plumbing fixtures at cellar level and first floor.
Q00624365-I1
12/05/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/03/2022
Signed off — Alteration
Interior renovation at Cellar level, First floor and Second floor. Replace damage existing partitions. Repair damage floor and ceiling.
Q00607925-I1
08/31/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/31/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/11/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/08/2022
Filed — Alteration
Interior renovation at Cellar level, First floor and Second floor. Replace damage existing partitions. Repair damage floor and ceiling.
Q00607925-P1
01/20/2022
Permit issued — Plumbing
Q00624365-I1-PL
12/21/2021
Filed — Alteration
Application file to proposed plumbing fixtures at cellar level and first floor.
Q00624365-I1
12/17/2021
Permit issued — General Construction
Q00607925-I1-GC
12/13/2021
Filed — Alteration
Interior renovation at Cellar level, First floor and Second floor. Replace damage existing partitions. Repair damage floor and ceiling.
Q00607925-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offTOM PETERSEN ARCHITECT, LLC07/01/2025
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK01/20/2022
DOB NOWGeneral ConstructionSigned-offSEGURA CONTRACTING CORP12/17/2021
2 projects · most recent 06/23/2025
General Wiring
FiledStatusContractorScope
06/23/2025CompleteVENTURE HOME SOLAR LLC—
11/15/2021Permit IssuedELPO ELECTRICAL CONTG INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/05/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/31/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/11/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00607925-I1Request digital key ↗
08/26/2026Q00607925-P1Request digital key ↗
08/26/2026Q00624365-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00607925-I1Open ↗
08/26/2026Q00607925-P1Open ↗
08/19/2026Q01245644-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00607925-P1Open ↗
08/26/2026Q00607925-I1Open ↗
08/19/2026Q01245644-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01245644-I1Open ↗