← Back
General warehouse
42-45 12 STREET
QUEENS · Long Island City-Hunters Point · BIN 4005275
💬 Discuss this project
1930Year Built
6Stories
E1Building Class
M1-5AZoning
41,400 sfGross Floor Area
1Units
LL97 Covered
General warehouse · Owner of record: EULISIS CAPITAL LLC · 8,700 sf lot · 4.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof46p · 4 filings · 20 docs
Floor 599p · 4 filings · 20 docs
Floor 493p · 4 filings · 20 docs
Floor 398p · 4 filings · 20 docs
Floor 2115p · 6 filings · 20 docs
Floor 1104p · 5 filings · 20 docs
Mezzanine96p · 4 filings · 20 docs
Cellar23p · 2 filings · 18 docs
Basement51p · 1 filing · 20 docs
Sub-Basement41p · 3 filings · 20 docs
Site & exterior23p · 2 filings · 17 docs
Filed — no permit issued2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
42-45 12TH STREET8307/08/2026
REDLEAF CAPITAL404/09/2026
CORNELL REALTY203/21/2026
EULISIS CAPITAL LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/28/2023$12.4M—Private party → EULISIS CAPITAL LLC$299/sf building
03/06/2018$11.2M—JRR REALTY COMPANY, LLC → 42-45 12TH STREET LLC$272/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
REFORM ARCHITECTURE PLLC904/23/2026
WAVIC ENGINEERING PLLC301/23/2026
BAZINI ENGINEERING, P.C.112/08/2025
JOEL PHAGOO P.E. PLLC707/25/2025
HC PEC105/13/2025
ADG ENGINEERING308/22/2024
STROH ENGINEERING SERVICES, P.C.302/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING1803/21/2026
HS DESIGN STUDIO203/21/2026
A1 EXPEDITING SERVICE1603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TSS ENGINEERS4492804/23/2026
WAVIC ENGINEERING PLLC1733301/23/2026
BAZINI ENGINEERING, P.C.1808112/08/2025
JOEL PHAGOO ,PE, PLLC2416407/25/2025
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/31/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/23/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/23/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
05/21/2026Structural Stability – Alterations of existing buildingsbassam (sam) rimawispecial
05/21/2026Interior lighting powerDionisio Cortes Ortegaenergy_progress
05/21/2026Fenestration and door U-factor and product ratingsDionisio Cortes Ortegaenergy_progress
05/21/2026Air barrier - visual inspectionDionisio Cortes Ortegaenergy_progress
05/21/2026Lighting controlsDionisio Cortes Ortegaenergy_progress
05/21/2026Energy Code Compliance InspectionsDionisio Cortes Ortegaprogress
05/21/2026Fire-Resistance Rated ConstructionDionisio Cortes Ortegaprogress
05/21/2026Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
04/23/2026Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
04/23/2026Fenestration and door U-factor and product ratingsDionisio Cortes Ortegaenergy_progress
04/23/2026Interior lighting powerDionisio Cortes Ortegaenergy_progress
04/23/2026Air barrier - visual inspectionDionisio Cortes Ortegaenergy_progress
04/23/2026Fire-Resistance Rated ConstructionDionisio Cortes Ortegaprogress
04/23/2026Energy Code Compliance InspectionsDionisio Cortes Ortegaprogress
04/23/2026Structural Stability – Alterations of existing buildingsbassam (sam) rimawispecial
04/23/2026Lighting controlsDionisio Cortes Ortegaenergy_progress
12/04/2025Sprinkler SystemsDARIUSZ LUCZAKspecial
12/04/2025Standpipe SystemsDARIUSZ LUCZAKspecial
12/04/2025Fire-Resistant Penetrations and JointsDARIUSZ LUCZAKspecial
11/21/2025Maintenance informationSal Tartaglioneenergy_progress
11/21/2025HVAC-R and service water heating equipmentSal Tartaglioneenergy_progress
11/21/2025HVAC-R and service water heating system controlsSal Tartaglioneenergy_progress
11/21/2025HVAC-R and service water piping design and insulationSal Tartaglioneenergy_progress
11/10/2025Mechanical SystemsJoseph Bazinispecial
11/10/2025FinalJoseph Baziniprogress
Latest 25 of 59.
Nothing on file for this building.