← Back
Five to six families
42-50 65 PLACE
QUEENS · BIN 4031699
💬 Discuss this project
2023Year Built
3Stories
C2Building Class
R5BZoning
5,340 sfGross Floor Area
6Units
0 Open Violations
Five to six families · 4,000 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof36p · 3 filings · 20 docs
Floor 332p · 1 filing · 20 docs
Floor 232p · 1 filing · 20 docs
Floor 132p · 1 filing · 20 docs
Cellar34p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HY DESIGN & DEVELOPMENT LLC.703/22/2026
L & L CONSTRUCTION DEVELO2903/22/2026
OWNER OF 4250 65 PLACE203/22/2026
OWNER OF 4250 65 PL103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/20/2017$1.2M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THE GREEN STUDIO203/21/2026
EC BUILDING CONSULTANTS2603/21/2026
BRIDGE EXPEDITING203/21/2026
MILLENNIUM DESIGNS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HY DESIGN & DEVELOPMENT LLC.General Contractor1608/05/2026
L&L CONSTRUCTION DEVELOPGeneral Contractor1503/21/2026
MC SUPERSTRUCTURE INCGeneral Contractor203/21/2026
VILLAGE P & H NY INCFire Protection107/08/2026
SAL BRUSCA INCGeneral Contractor104/09/2026
VILLAGE P & H NY INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC77781107/22/2024
Building Lifecycle
All (152)Filed (18)Permit Issued (17)Signed Off (11)Violation (46)Inspection (12)Objection (18)Special Inspection (30)
08/04/2026
Permit issued — Curb Cut
Q01391212-I1-CC
07/02/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/13/2026
Objection raised — Zoning
05/13/2026
Objection raised — Scope
05/08/2026
Filed — Alteration
Q01391212-I1
04/20/2026
Signed off — New Building
Proposed 3 story 6 units apartment building.
Q00657466-I1
03/23/2026
Signed off — Alteration
INSTALLATION OF 8 FEET HIGH TEMPORARY CONSTRUCTION FENCE
Q00616713-I1
04/03/2025
Signed off — New Building
Proposed 3 story 6 units apartment building.
Q00657466-S2
03/26/2025
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM AS SHOWN ON DRAWINGS. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION NUMBER Q00657466.
Q00821161-I1
03/25/2025
Signed off — New Building
Proposed 3 story 6 units apartment building.
Q00657466-S4
03/25/2025
Signed off — New Building
Proposed 3 story 6 units apartment building.
Q00657466-S1
02/26/2025
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS. FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION NUMBER Q00657466.
Q00821291-I1
02/14/2025
Signed off — New Building
Proposed 3 story 6 units apartment building.
Q00657466-S3
01/22/2025
Permit issued — Mechanical Systems
Q00821161-I1-MS
01/16/2025
Signed off — Alteration
Q08019450-I1
01/15/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/06/2025
Signed off — Alteration
Installation of 8 Feet high temporary construction fence, filed in conjunction with new building application number Q00657466.
Q00846886-I1
12/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/06/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/16/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2024
Permit issued — Curb Cut
Q08019450-I1-CC
09/03/2024
Special inspection requirement — Interior lighting power
XIONGCAI GU
09/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
09/03/2024
Special inspection requirement — Protection of exposed foundation insulation
XIONGCAI GU
09/03/2024
Special inspection requirement — Maintenance information
XIONGCAI GU
09/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
09/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIONGCAI GU
09/03/2024
Special inspection requirement — Metering
XIONGCAI GU
09/03/2024
Special inspection requirement — Insulation placement and R values
XIONGCAI GU
09/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIONGCAI GU
09/03/2024
Special inspection requirement — Air barrier — testing
XIONGCAI GU
09/03/2024
Special inspection requirement — Final
YIPENG LUAN
09/03/2024
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
09/03/2024
Special inspection requirement — Mechanical Systems
XIONGCAI GU
09/03/2024
Special inspection requirement — Masonry
XIONGCAI GU
09/03/2024
Special inspection requirement — Fenestration air leakage
XIONGCAI GU
09/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIONGCAI GU
09/03/2024
Special inspection requirement — Permanent certificate
XIONGCAI GU
09/03/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
XIONGCAI GU
09/03/2024
Special inspection requirement — Ventilation and air distribution system
XIONGCAI GU
09/03/2024
Special inspection requirement — Electric vehicle service equipment requirements
XIONGCAI GU
09/03/2024
Special inspection requirement — Air barrier - visual inspection
XIONGCAI GU
09/03/2024
Special inspection requirement — Fenestration areas
XIONGCAI GU
08/22/2024
Objection resolved — Addressed
08/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/02/2024
Objection raised — Scope
07/22/2024
Filed — New Building
Proposed 3 story 6 units apartment building.
Q00657466-A1
07/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
XIONGCAI GU
07/18/2024
Special inspection requirement — Fenestration areas
XIONGCAI GU
07/18/2024
Special inspection requirement — Permanent certificate
XIONGCAI GU
07/18/2024
Special inspection requirement — Interior lighting power
XIONGCAI GU
07/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
07/18/2024
Special inspection requirement — Air barrier - visual inspection
XIONGCAI GU
Latest 60 of 152 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedHY DESIGN & DEVELOPMENT LLC.08/04/2026
DOB NOWMechanical SystemsSigned-offFANG YE01/22/2025
DOB NOWCurb CutSigned-offFANG YE09/11/2024
DOB NOWConstruction FenceSigned-offFANG YE03/05/2024
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP01/22/2024
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC10/10/2023
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC10/10/2023
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC09/15/2023
DOB NOWFoundationSigned-offL&L CONSTRUCTION DEVELOP06/23/2023
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP06/22/2023
DOB NOWStructuralSigned-offL&L CONSTRUCTION DEVELOP06/21/2023
DOB NOWSupport of ExcavationSigned-offL&L CONSTRUCTION DEVELOP06/14/2023
DOB NOWGeneral ConstructionPermit IssuedFANG YE04/26/2023
DOB NOWStructuralSigned-offFANG YE04/05/2023
DOB NOWConstruction FenceSigned-offFANG YE03/21/2023
DOB NOWConstruction FenceSigned-offFANG YE03/20/2023
DOB NOWConstruction FenceSigned-offNAVAC BUILDERS INC10/25/2021
BISEQISSUEDSAL BRUSCA INC03/14/2022
BIS—ISSUEDSAL BRUSCA INC03/14/2022
BISPLISSUEDJOE TRUCE PLUMBING INC.08/31/2001
BISOTISSUEDN/A05/30/2001
1 project · most recent 07/22/2024
Others
FiledStatusContractorScopeMake / Model / Capacity
07/22/2024Permit IssuedL&L CONSTRUCTION DEVELOPOthers
Other
Greenheck CPS-A200 50 CFM · Exhaust Fan ×12
2 projects · most recent 12/02/2024
General Wiring
FiledStatusContractorScope
12/02/2024CompleteKJK ELECTRIC INCGeneral Wiring
09/18/2023CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 07/22/2024
Steel Masonry
FiledStatusContractorScope
07/22/2024Permit IssuedL&L CONSTRUCTION DEVELOPSteel, Masonry
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
01/15/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
12/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/16/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 104
DateRequirementInspectorRole
09/03/2024Interior lighting powerXIONGCAI GUenergy_progress
09/03/2024Maintenance informationXIONGCAI GUenergy_progress
09/03/2024Air barrier — testing XIONGCAI GUenergy_progress
09/03/2024Fenestration areasXIONGCAI GUenergy_progress
09/03/2024Air barrier - visual inspectionXIONGCAI GUenergy_progress
09/03/2024HVAC-R and service water heating equipmentXIONGCAI GUenergy_progress
09/03/2024Electric vehicle service equipment requirementsXIONGCAI GUenergy_progress
09/03/2024Ventilation and air distribution systemXIONGCAI GUenergy_progress
09/03/2024Protection of exposed foundation insulationXIONGCAI GUenergy_progress
09/03/2024Insulation placement and R valuesXIONGCAI GUenergy_progress
09/03/2024Mechanical SystemsXIONGCAI GUspecial
09/03/2024MasonryXIONGCAI GUspecial
09/03/2024Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
09/03/2024FinalYIPENG LUANprogress
09/03/2024Energy Code Compliance InspectionsXIONGCAI GUprogress
09/03/2024Fire-Resistance Rated ConstructionXIONGCAI GUprogress
09/03/2024HVAC-R and service water heating system controlsXIONGCAI GUenergy_progress
09/03/2024Fenestration air leakageXIONGCAI GUenergy_progress
09/03/2024HVAC-R and service water piping design and insulationXIONGCAI GUenergy_progress
09/03/2024MeteringXIONGCAI GUenergy_progress
09/03/2024Permanent certificateXIONGCAI GUenergy_progress
09/03/2024Fenestration and door U-factor and product ratingsXIONGCAI GUenergy_progress
07/18/2024Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
07/18/2024MasonryXIONGCAI GUspecial
07/18/2024Mechanical SystemsXIONGCAI GUspecial
Latest 25 of 104.
▾Documents — 208 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/29/2026Q00616713-I1Request digital key ↗
08/25/2026Q08019450-I1Request digital key ↗
08/25/2026Q00821161-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION2
04/18/2023440769447Open ↗
03/18/2021421785802Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
02/10/2025440769447Open ↗
▸BISWORK PERMIT APPLICATION1
05/31/2022421785802Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
04/18/2023440769447Open ↗
▸DOB NOWHPD - Permit Notice1
08/13/2026Q00657466-I1Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00657466-I1Open ↗
08/13/2026Q00657466-P9Open ↗
08/13/2026Q00657466-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026Q00657466-P2Open ↗
08/13/2026Q00657466-I1Open ↗
08/13/2026Q00657466-A1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00657466-I1Open ↗
▸Seals & Professional Certifications111
▸DOB NOWProgress Inspector Seal & Signature65
09/24/2026Q00657466-A1Open ↗
09/24/2026Q00657466-A1Open ↗
09/24/2026Q00657466-A1Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/24/2026Q00657466-A1Open ↗
09/24/2026Q00657466-A1Open ↗
09/24/2026Q00657466-A1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/29/2026Q00616713-I1Open ↗
08/25/2026Q00846886-I1Open ↗
08/24/2026Q00932595-I1Open ↗
Showing 3 of 18 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/18/2023440769447Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/18/2023440769447Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026Q00657466-P9Open ↗
08/13/2026Q00657466-P2Open ↗
08/13/2026Q00657466-I1Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRIC CUT-OFF1
05/31/2022421785802Open ↗
▸BISSEWER CUT-OFF1
05/31/2022421785802Open ↗
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist4
08/22/2026Q00657466-I1Open ↗
08/22/2026Q00657466-P9Open ↗
08/15/2026Q00657466-A1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES SITE PLAN1
01/23/2025440769447Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/31/2022421785802Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/31/2022421785802Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/26/2023440769447Open ↗
▸BISSTREET TREE CHECKLIST1
05/26/2023440769447Open ↗
▸BISSTREET TREE SIGNOFF1
01/23/2025440769447Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00657466-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00657466-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00657466-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00657466-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q00657466-S2Open ↗
08/13/2026Q00657466-P1Open ↗
▸BISBPP: FIELD INSPECTION1
02/10/2025440769447Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00657466-S2Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/31/2022421785802Open ↗
05/31/2022421785802Open ↗
05/31/2022421785802Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/10/2025440769447Open ↗
▸BISCURB CUT (CC) SIGNOFF1
01/23/2025440769447Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
05/31/2022421785802Open ↗
▸BISDOB APPROVAL FOR NEW CC1
02/10/2025440769447Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/31/2022421785802Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
02/10/2025440769447Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM3
05/31/2022421785802Open ↗
03/18/2021421785802Open ↗
03/18/2021421785802Open ↗
▸BISADDITIONAL INFORMATION1
05/26/2023440769447Open ↗
▸BISEFILING COVER SHEET1
03/18/2021421785802Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/18/2023440769447Open ↗
▸Other Documents24
▸DOB NOWSite Survey: Initial4
08/13/2026Q00657466-I1Open ↗
08/13/2026Q00657466-P2Open ↗
08/13/2026Q00657466-P9Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00657466-A1Open ↗
08/13/2026Q00657466-P9Open ↗
08/13/2026Q00657466-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/22/2026Q00657466-P9Open ↗
08/22/2026Q00657466-I1Open ↗
08/15/2026Q00657466-A1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: TOPOGRAPHIC SURVEY1
05/26/2023440769447Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
04/18/2023440769447Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
02/10/2025440769447Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
05/26/2023440769447Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
04/18/2023440769447Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
02/10/2025440769447Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
02/10/2025440769447Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
05/26/2023440769447Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00657466-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00657466-I1Open ↗
▸DOB NOWWaiver Document1
08/29/2026Q00616713-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00657466-S2Open ↗