← Back
Primarily 2 family with 1 store or office
42-63 MAIN STREET
QUEENS · BIN 4115891
💬 Discuss this project
1960Year Built
3Stories
S2Building Class
R6Zoning
3,885 sfGross Floor Area
3Units
0 Open Violations
Primarily 2 family with 1 store or office · 2,289 sf lot · 1.7 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO 51 ARCHITECTURE, PLLC406/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
B2 CODE CONSULTANTS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
N.Y. EMS MECHANICAL CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050406/23/2022
Building Lifecycle
All (25)Filed (4)Permit Issued (2)Signed Off (1)Violation (10)Inspection (2)Special Inspection (6)
07/26/2023
Signed off — Alteration
Legalization for boiler installed in the cellar to resolve violation# 39043643R; 39043644Z
Q00576899-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
06/24/2022
Special inspection requirement — Permanent certificate
PAUL MARINO
06/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
06/23/2022
Filed — Alteration
Legalization for boiler installed in the cellar to resolve violation# 39043643R; 39043644Z
Q00576899-P3
06/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
06/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
06/15/2022
Special inspection requirement — Permanent certificate
PAUL MARINO
06/09/2022
Filed — Alteration
Legalization for boiler installed in the cellar to resolve violation# 39043643R; 39043644Z
Q00576899-P2
06/02/2022
Filed — Alteration
Legalization for boiler installed in the cellar to resolve violation# 39043643R; 39043644Z
Q00576899-P1
06/01/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/09/2022
Permit issued — Boiler Equipment
Q00576899-I1-BE
03/17/2022
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
10/25/2021
Permit issued — Boiler Equipment
Q00576899-I1-BE
10/08/2021
Filed — Alteration
Legalization for boiler installed in the cellar to resolve violation# 39043643R; 39043644Z
Q00576899-I1
06/29/2021
Violation issued (ECB, closed)
Boilers
06/29/2021
Violation issued (ECB, closed)
Boilers
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offN.Y. EMS MECHANICAL CORP05/09/2022
DOB NOWBoiler EquipmentSigned-offN.Y. EMS MECHANICAL CORP10/25/2021
BISPLISSUEDEXCELLENCE IN PLUMBING04/03/1995
BISOTISSUEDDUNRITE COMMERICAL REFRIG. CORP.03/28/1994
BIS—ISSUEDNYSAN CONST. CORP.10/18/1993
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/01/2022Pass-Final Boiler Equipment InspectionPassView ↗
03/17/2022Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/24/2022Fire-Resistant Penetrations and JointsPAUL MARINOspecial
06/24/2022Permanent certificatePAUL MARINOenergy_progress
06/24/2022HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
06/15/2022Fire-Resistant Penetrations and JointsPAUL MARINOspecial
06/15/2022HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
06/15/2022Permanent certificatePAUL MARINOenergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00576899-P1Request digital key ↗
08/27/2026Q00576899-P3Request digital key ↗
08/27/2026Q00576899-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
12/07/2017400102474Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026Q00576899-I1Open ↗
09/23/2026Q00576899-I1Open ↗
08/29/2026Q00576899-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026Q00576899-P2Open ↗
08/13/2026Q00576899-P1Open ↗
08/13/2026Q00576899-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026Q00576899-I1Open ↗
08/29/2026Q00576899-P3Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026Q00576899-P1Open ↗
08/13/2026Q00576899-P2Open ↗
08/13/2026Q00576899-P3Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00576899-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00576899-I1Open ↗