42-98 SAULL STREET
QUEENS · Flushing-Willets Point · BIN 4115245
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
6 Open Violations ▸
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof71p · 1 filing · 20 docs
Penthouse77p · 1 filing · 20 docs
Floor 468p · 1 filing · 20 docs
Floor 374p · 1 filing · 20 docs
Floor 277p · 1 filing · 20 docs
Floor 174p · 1 filing · 20 docs
Cellar73p · 1 filing · 20 docs
Site & exterior83p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACER CONSTRUCTION403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/10/2021$1.5M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC201/21/2025
JIMENEZ BUILDING CONSULTING LLC710/29/2024
BAYSIDE ENGINEERING PC410/28/2024
JIAN ENGINEERING PLLC612/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO3803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACER CONSTRUCTION INCGeneral Contractor2004/09/2026
WINWAY DEVELOPMENT LLCGeneral Contractor1004/09/2026
STEEL TONE CONSTRUCTIONGeneral Contractor504/09/2026
DYNAMIC PLBNG & SPRKR CORFire Protection207/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC73971601/21/2025
Building Lifecycle
All (144)Filed (19)Permit Issued (24)Signed Off (8)Violation (12)Inspection (9)Objection (42)Special Inspection (30)
05/07/2026
Violation issued (HPD, open)
A
04/24/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED MECHANICAL WORK ON CEL, 001 TO 004, PENTHOUSE AND ROOF AS PER PLAN. IN CONJUNCTION WITH DOB ALT-CO-NEW BUILDING JOB # Q00743139-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00743139-I1
11/25/2025
Violation issued (HPD, open)
I
04/11/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED MECHANICAL WORK ON CEL, 001 TO 004, PENTHOUSE AND ROOF AS PER PLAN. IN CONJUNCTION WITH DOB ALT-CO-NEW BUILDING JOB # Q00743139-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00743139-S4
03/04/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
01/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
01/22/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
01/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
01/22/2025
Special inspection requirement — Sprinkler Systems
JIAN DENG
01/22/2025
Special inspection requirement — Maintenance information
JIAN DENG
01/22/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JIAN DENG
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
01/21/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED MECHANICAL WORK ON CEL, 001 TO 004, PENTHOUSE AND ROOF AS PER PLAN. IN CONJUNCTION WITH DOB ALT-CO-NEW BUILDING JOB # Q00743139-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00743139-A2
01/17/2025
Special inspection requirement — Sprinkler Systems
JIAN DENG
01/17/2025
Special inspection requirement — Maintenance information
JIAN DENG
01/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
01/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
01/17/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
01/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
01/17/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JIAN DENG
01/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
01/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/06/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/04/2024
Violation issued (HPD, open)
I
12/03/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED MECHANICAL WORK ON CEL, 001 TO 004, PENTHOUSE AND ROOF AS PER PLAN. IN CONJUNCTION WITH DOB ALT-CO-NEW BUILDING JOB # Q00743139-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00743139-S6
11/20/2024
Permit issued — Mechanical Systems
Q00743139-S6-MS
11/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/06/2024
Special inspection requirement — Electrical motors and elevators
JIAN DENG
11/06/2024
Special inspection requirement — Lighting in dwelling units
JIAN DENG
11/06/2024
Special inspection requirement — Fenestration air leakage
JIAN DENG
11/06/2024
Special inspection requirement — Insulation placement and R values
JIAN DENG
11/06/2024
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
11/06/2024
Special inspection requirement — Protection of exposed foundation insulation
JIAN DENG
11/06/2024
Special inspection requirement — Maintenance information
JIAN DENG
11/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
11/06/2024
Special inspection requirement — Fenestration areas
JIAN DENG
11/06/2024
Special inspection requirement — Air barrier — testing
JIAN DENG
11/06/2024
Special inspection requirement — Lighting controls
JIAN DENG
11/06/2024
Special inspection requirement — Interior lighting power
JIAN DENG
11/06/2024
Special inspection requirement — Metering
JIAN DENG
11/06/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JIAN DENG
10/29/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED MECHANICAL WORK ON CEL, 001 TO 004, PENTHOUSE AND ROOF AS PER PLAN. IN CONJUNCTION WITH DOB ALT-CO-NEW BUILDING JOB # Q00743139-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00743139-S6
10/28/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED MECHANICAL WORK ON CEL, 001 TO 004, PENTHOUSE AND ROOF AS PER PLAN. IN CONJUNCTION WITH DOB ALT-CO-NEW BUILDING JOB # Q00743139-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00743139-P9
10/21/2024
Signed off — Alteration
THIS APPLICATION IS FILED TO ADD CONSTRUCTION FENCE & SIDEWALK SHED WORK IN CONJUNCTION WITH D.O.B. ALT-CO NEW BUILDING #: Q00743139. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00833609-I1
10/18/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED MECHANICAL WORK ON CEL, 001 TO 004, PENTHOUSE AND ROOF AS PER PLAN. IN CONJUNCTION WITH DOB ALT-CO-NEW BUILDING JOB # Q00743139-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00743139-P8
10/18/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED MECHANICAL WORK ON CEL, 001 TO 004, PENTHOUSE AND ROOF AS PER PLAN. IN CONJUNCTION WITH DOB ALT-CO-NEW BUILDING JOB # Q00743139-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00743139-S3
10/18/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED MECHANICAL WORK ON CEL, 001 TO 004, PENTHOUSE AND ROOF AS PER PLAN. IN CONJUNCTION WITH DOB ALT-CO-NEW BUILDING JOB # Q00743139-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00743139-S1
10/17/2024
Permit issued — General Construction
Q00743139-I1-GC
10/15/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED MECHANICAL WORK ON CEL, 001 TO 004, PENTHOUSE AND ROOF AS PER PLAN. IN CONJUNCTION WITH DOB ALT-CO-NEW BUILDING JOB # Q00743139-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00743139-P7
08/30/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED MECHANICAL WORK ON CEL, 001 TO 004, PENTHOUSE AND ROOF AS PER PLAN. IN CONJUNCTION WITH DOB ALT-CO-NEW BUILDING JOB # Q00743139-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00743139-S5
08/09/2024
Permit issued — Plumbing
Q00743139-S4-EW-SP
08/09/2024
Permit issued — Plumbing
Q00743139-S4-PL
07/13/2024
Violation issued (ECB, closed)
Construction
07/10/2024
Violation issued (ECB, closed)
Construction
05/30/2024
Permit issued — Sidewalk Shed
Q00833609-I1-SH
05/30/2024
Permit issued — Construction Fence
Q00833609-I1-FN
05/23/2024
Permit issued — Sidewalk Shed
Q00833609-I1-SH
05/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 144 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offACER CONSTRUCTION INC11/20/2024
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC10/17/2024
DOB NOWPlumbingSigned-offCITYWIDE PLBG, HTG &SPRKL08/09/2024
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS08/09/2024
DOB NOWSidewalk ShedSigned-offACER CONSTRUCTION INC05/30/2024
DOB NOWConstruction FenceSigned-offACER CONSTRUCTION INC05/30/2024
DOB NOWSidewalk ShedSigned-offWINWAY DEVELOPMENT LLC05/23/2024
DOB NOWConstruction FenceSigned-offWINWAY DEVELOPMENT LLC02/20/2024
DOB NOWSupported ScaffoldSigned-offACER CONSTRUCTION INC12/28/2023
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC10/12/2023
DOB NOWStructuralSigned-offACER CONSTRUCTION INC10/12/2023
DOB NOWEarth WorkSigned-offACER CONSTRUCTION INC10/12/2023
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC07/24/2023
DOB NOWStructuralSigned-offACER CONSTRUCTION INC07/24/2023
DOB NOWEarth WorkSigned-offACER CONSTRUCTION INC07/24/2023
DOB NOWSupport of ExcavationSigned-offACER CONSTRUCTION INC07/24/2023
DOB NOWSprinklersSigned-offCITYWIDE PLBG HTG & SPKLS07/22/2023
DOB NOWPlumbingSigned-offCITYWIDE PLBG, HTG &SPRKL07/22/2023
DOB NOWGeneral ConstructionPermit IssuedSTEEL TONE CONSTRUCTION06/09/2023
DOB NOWSupport of ExcavationSigned-offSTEEL TONE CONSTRUCTION06/06/2023
DOB NOWStructuralSigned-offSTEEL TONE CONSTRUCTION06/06/2023
DOB NOWEarth WorkSigned-offSTEEL TONE CONSTRUCTION06/05/2023
DOB NOWConstruction FenceSigned-offWINWAY DEVELOPMENT LLC02/24/2023
DOB NOWConstruction FenceSigned-offWINWAY DEVELOPMENT LLC02/24/2023
1 project · most recent 01/21/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/21/2025Signed-offACER CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric SUZ-KA36NAHZ 40,000 BTU · Condensing Unit ×6
MXZ-SM48NAMHZ 54,000 BTU · Condensing Unit ×2
1 project · most recent 01/21/2025
Sprinkler System
FiledStatusContractorScope
01/21/2025Signed-offDYNAMIC PLBNG & SPRKR CORSprinkler System
1 project · most recent 01/21/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/21/2025Signed-offDYNAMIC PLBG & SPRKLR CORGas, Storm, Water/Sanitary
3 projects · most recent 03/06/2025
General Wiring
FiledStatusContractorScope
03/06/2025CompleteERIC & NG ELEC'L, INC.General Wiring
01/11/2024CompleteA.C. MORGAN ELECTRIC—
08/09/2023CompleteERIC & NG ELEC'L, INC.—
1 project · most recent 01/21/2025
Steel Concrete Masonry
FiledStatusContractorScope
01/21/2025Signed-offACER CONSTRUCTION INCSteel, Concrete, Masonry
1 project · most recent 01/21/2025
Scaffold
FiledStatusContractorScope
01/21/2025Signed-offACER CONSTRUCTION INCScaffold
1 project · most recent 01/21/2025
Earthwork
FiledStatusContractorScope
01/21/2025Signed-offACER CONSTRUCTION INCEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/04/2025Fail-Final CND-Occupancy InspectionFailView ↗
01/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/28/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 130
DateRequirementInspectorRole
01/22/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJIAN DENGspecial
01/22/2025HVAC-R and service water heating equipmentJIAN DENGenergy_progress
01/22/2025Maintenance informationJIAN DENGenergy_progress
01/22/2025HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
01/22/2025HVAC-R and service water heating system controlsJIAN DENGenergy_progress
01/22/2025Energy Code Compliance InspectionsJIAN DENGprogress
01/22/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
01/22/2025Sprinkler SystemsJIAN DENGspecial
01/17/2025HVAC-R and service water heating equipmentJIAN DENGenergy_progress
01/17/2025Maintenance informationJIAN DENGenergy_progress
01/17/2025HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
01/17/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
01/17/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJIAN DENGspecial
01/17/2025Sprinkler SystemsJIAN DENGspecial
01/17/2025Energy Code Compliance InspectionsJIAN DENGprogress
01/17/2025HVAC-R and service water heating system controlsJIAN DENGenergy_progress
11/06/2024Insulation placement and R valuesJIAN DENGenergy_progress
11/06/2024Air barrier — testing JIAN DENGenergy_progress
11/06/2024Fenestration areasJIAN DENGenergy_progress
11/06/2024Protection of exposed foundation insulationJIAN DENGenergy_progress
11/06/2024Air barrier - visual inspectionJIAN DENGenergy_progress
11/06/2024Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
11/06/2024Exterior lighting powerJIAN DENGenergy_progress
11/06/2024Energy Code Compliance InspectionsJIAN DENGprogress
11/06/2024Fire-Resistance Rated ConstructionJIAN DENGprogress
Latest 25 of 130.
▾Documents — 228 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/25/2026Q00833609-P1Request digital key ↗
08/25/2026Q00833609-I1Request digital key ↗
08/23/2026Q00743139-A2Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits8
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
10/24/2025421840949Open ↗
10/24/2025421840949Open ↗
10/24/2025421840949Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
07/11/2025421840949Open ↗
04/23/2023440779150Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
04/23/2023440779150Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00743139-P9Open ↗
08/13/2026Q00743139-P7Open ↗
08/13/2026Q00743139-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026Q00743139-P9Open ↗
08/13/2026Q00743139-P3Open ↗
08/13/2026Q00743139-P7Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00743139-I1Open ↗
▸Seals & Professional Certifications151
▸DOB NOWSpecial Inspector Seal & Signature65
09/02/2026Q00743139-P4Open ↗
09/02/2026Q00743139-P4Open ↗
09/02/2026Q00743139-P4Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWProgress Inspector Seal & Signature65
09/02/2026Q00743139-P4Open ↗
08/31/2026Q00743139-S6Open ↗
08/31/2026Q00743139-S6Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/23/2026Q00743139-I1Open ↗
08/23/2026Q00743139-A2Open ↗
08/23/2026Q00743139-P9Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/23/2023440779150Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/23/2023440779150Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026Q00743139-I1Open ↗
08/13/2026Q00743139-P3Open ↗
08/13/2026Q00743139-P7Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST1
04/23/2023440779150Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00743139-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026Q00743139-S2Open ↗
08/13/2026Q00743139-S3Open ↗
08/13/2026Q00743139-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q00743139-S2Open ↗
08/13/2026Q00743139-S3Open ↗
▸Approvals, Objections & Sign-offs1
▸BISDOT APPROVAL FOR ADA RAMP AT CORNERS1
03/01/2024440779150Open ↗
▸Filing & Intake Forms3
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/23/2023440779150Open ↗
▸BISEFILING COVER SHEET1
09/17/2025421840949Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/23/2023440779150Open ↗
▸Other Documents23
▸BISBPP - SUPPORTING DOCUMENTATION4
03/01/2024440779150Open ↗
04/23/2023440779150Open ↗
04/23/2023440779150Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026Q00743139-P7Open ↗
08/13/2026Q00743139-P3Open ↗
08/13/2026Q00743139-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00743139-P3Open ↗
08/13/2026Q00743139-I1Open ↗
08/13/2026Q00743139-P9Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/23/2026Q00743139-I1Open ↗
08/23/2026Q00743139-P9Open ↗
08/23/2026Q00743139-P7Open ↗
Showing 3 of 4 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT2
10/24/2025421840949Open ↗
04/23/2023440779150Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00743139-S2Open ↗
08/13/2026Q00743139-S3Open ↗
▸BISPLOT DIAGRAM1
10/24/2025421840949Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
05/09/2023440779150Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00743139-I1Open ↗