← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Waterview Condominium
42 A BROADWAY · BIN 3347208
💬 Discuss this project
2000Year Built
6Stories
RMBuilding Class
C4-3Zoning
50,828 sfGross Floor Area
31Units
LL97 CoveredRent Stabilized4 Active Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: F & M Schaefer Brewing Co · 14,996 sf lot · 3.39 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1XXXXXX4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Wythe Rose Gardens403/21/2026
The Waterview Condominium II403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Archaq401/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Allstate Expediters803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
I.H. 1 ConstructionGeneral Contractor303/21/2026
AmokPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616301/08/2024
Building Lifecycle
All (90)Filed (4)Permit Issued (2)Signed Off (2)Violation (60)Inspection (3)Objection (10)Special Inspection (9)
08/12/2026
Violation issued (HPD, closed)
C
04/21/2026
Violation issued (HPD, closed)
A
04/21/2026
Violation issued (HPD, open)
B
04/21/2026
Violation issued (HPD, open)
B
04/21/2026
Violation issued (HPD, open)
B
02/02/2026
Violation issued (FDNY_NOV, closed)
11/21/2025
Violation issued (HPD, closed)
I
06/26/2025
Violation issued (FDNY_NOV, closed)
06/26/2025
Violation issued (FDNY_NOV, closed)
05/21/2024
Signed off — Alteration
Proposed renovation to the First (1st) floor Medical Offices. New non-bearing partitions, cosmetic work as per the plans. There will be no change to use, egress or occupancy under this application.
B00930262-I1
05/13/2024
Signed off — Alteration
Proposed renovation to the First (1st) floor Medical Offices. New non-bearing partitions, cosmetic work as per the plans. There will be no change to use, egress or occupancy under this application.
B00930262-S1
05/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/20/2024
Violation issued (FDNY_NOV, closed)
03/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
01/12/2024
Special inspection requirement — Final
FAHAD FATEH
01/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/08/2024
Filed — Alteration
Proposed renovation to the First (1st) floor Medical Offices. New non-bearing partitions, cosmetic work as per the plans. There will be no change to use, egress or occupancy under this application.
B00930262-P2
01/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
01/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
01/05/2024
Special inspection requirement — Final
FAHAD FATEH
01/03/2024
Filed — Alteration
Proposed renovation to the First (1st) floor Medical Offices. New non-bearing partitions, cosmetic work as per the plans. There will be no change to use, egress or occupancy under this application.
B00930262-P1
10/11/2023
Permit issued — Plumbing
B00930262-S1-PL
09/26/2023
Permit issued — General Construction
B00930262-I1-GC
09/20/2023
Objection resolved — Addressed
09/20/2023
Objection resolved — Addressed
09/20/2023
Objection resolved — Addressed
09/20/2023
Objection resolved — Addressed
09/20/2023
Objection resolved — Addressed
09/19/2023
Objection raised — Scope
09/19/2023
Objection raised — Fire_Protection
09/19/2023
Objection raised — Fire_Protection
09/19/2023
Objection raised — Fire_Protection
09/19/2023
Objection raised — Structural
09/14/2023
Filed — Alteration
Proposed renovation to the First (1st) floor Medical Offices. New non-bearing partitions, cosmetic work as per the plans. There will be no change to use, egress or occupancy under this application.
B00930262-S1
09/13/2023
Filed — Alteration
Proposed renovation to the First (1st) floor Medical Offices. New non-bearing partitions, cosmetic work as per the plans. There will be no change to use, egress or occupancy under this application.
B00930262-I1
11/22/2022
Violation issued (HPD, closed)
A
11/22/2022
Violation issued (HPD, closed)
A
11/22/2022
Violation issued (HPD, closed)
B
11/22/2022
Violation issued (HPD, closed)
C
11/22/2022
Violation issued (HPD, closed)
C
11/22/2022
Violation issued (HPD, closed)
C
06/24/2022
Violation issued (HPD, closed)
C
06/24/2022
Violation issued (HPD, closed)
C
06/24/2022
Violation issued (HPD, closed)
C
06/24/2022
Violation issued (HPD, closed)
C
06/24/2022
Violation issued (HPD, closed)
B
06/24/2022
Violation issued (HPD, closed)
A
06/24/2022
Violation issued (HPD, closed)
A
06/24/2022
Violation issued (HPD, closed)
A
06/24/2022
Violation issued (HPD, closed)
A
06/24/2022
Violation issued (HPD, closed)
A
06/24/2022
Violation issued (HPD, closed)
A
06/24/2022
Violation issued (HPD, closed)
B
06/24/2022
Violation issued (HPD, closed)
A
05/06/2021
Violation issued (ECB, open)
Boilers
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAmok10/11/2023
DOB NOWGeneral ConstructionSigned-offI.H. 1 Construction09/26/2023
BISOTISSUEDZenco Group06/14/2012
BISBLISSUEDBradford Mechanical Contracting02/01/2002
BISPLISSUEDBradford Mechanical Contracting02/01/2002
BISMHISSUEDAlisa Construction Co01/17/2002
BISPLISSUEDAtlantic Water & Sewer07/17/2001
BISBLISSUEDBradford Mechanical Contracting03/19/2001
BIS—ISSUEDGreen Link Construction12/06/2000
BISEQISSUEDGreen Link Construction12/06/2000
BISSPISSUEDCapitol Fire SPKL Co06/19/2000
BIS—ISSUEDGreen Link Construction12/20/1999
BISEQISSUEDGreen Link Construction12/09/1999
BISPLISSUEDBradford Mechanical Contracting12/01/1999
BISOTISSUEDGreen Link Construction10/22/1999
BISEQISSUEDGreen Link Construction08/11/1999
BISEQISSUEDGreen Link Construction08/11/1999
BIS—ISSUEDGreen Link Construction08/11/1999
1 project · most recent 09/27/2023
General Wiring
FiledStatusContractorScope
09/27/2023CompleteHivolts ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/12/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/12/2024Tenant Protection Plan ComplianceFAHAD FATEHspecial
01/12/2024FinalFAHAD FATEHprogress
01/12/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/05/2024Tenant Protection Plan ComplianceFAHAD FATEHspecial
01/05/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/05/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/05/2024Tenant Protection Plan ComplianceFAHAD FATEHspecial
01/05/2024FinalFAHAD FATEHprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
XXXXXXMedical / HealthcareFloor 1
Project B00930262 Alteration · LOC Issued · 09/13/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026B00930262-I1Request digital key ↗
08/26/2026B00930262-P1Request digital key ↗
08/26/2026B00930262-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
04/03/2012320451685Open ↗
03/26/2012320451685Open ↗
▸BISWORK PERMIT APPLICATION1
06/15/2012320451685Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026B00930262-P1Open ↗
08/26/2026B00930262-S1Open ↗
08/26/2026B00930262-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026B00930262-P2Open ↗
08/24/2026B00930262-I1Open ↗
08/23/2026B00930262-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B00930262-I1Open ↗
08/24/2026B00930262-P2Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/26/2012320451685Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/26/2012320451685Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/26/2012320451685Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026B00930262-S1Open ↗
08/26/2026B00930262-P2Open ↗
08/26/2026B00930262-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed2
08/13/2026B00930262-I1Open ↗
08/13/2026B00930262-P2Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/26/2012320451685Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026B00930262-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
03/26/2012320451685Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/15/2012320451685Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/21/2012320451685Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/15/2012320451685Open ↗
▸BISCOST AFFIDAVIT1
03/26/2012320451685Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/26/2012320451685Open ↗