← Back
BuildNYC
Two family frame
42 ANDERSON AVENUE
STATEN ISLAND · Port Richmond · BIN 5024186
💬 Discuss this project
1899Year Built
2.5Stories
B2Building Class
R3AZoning
1,520 sfGross Floor Area
2Units
Two family frame · 4,285 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSunrun photovoltaic solar panel installation1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering112/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation Servicespecialty_contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272112/08/2025
Building Lifecycle
02/27/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01329830-I1
12/11/2025
Permit issued — Solar
S01329830-I1-SL
12/08/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01329830-I1
12/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/08/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service12/11/2025
2 projects · most recent 01/05/2026
General Wiring
FiledStatusContractorScope
01/05/2026CompleteSunrun Solar ElectlGeneral Wiring
05/02/2023CompleteBay ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/08/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/08/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
12/05/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/05/2025Energy Code Compliance InspectionsWalid Abdullaprogress
12/05/2025FinalWalid Abdullaprogress
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account